UCML Conference 16 January 2015 From the revised

  • Slides: 42
Download presentation
UCML Conference 16 January 2015 From the revised GCSE to the new A Level

UCML Conference 16 January 2015 From the revised GCSE to the new A Level Syllabus A Journey into Language and Culture Bernardette Holmes Campaign Director, Speak to the Future Advancing language capability for the 21 st Century

Purpose of Study 7 -14 Learning a foreign language is a liberation from insularity

Purpose of Study 7 -14 Learning a foreign language is a liberation from insularity and provides an opening to other cultures. A high quality languages education should foster pupils’ curiosity and deepen their understanding of the world. Advancing language capability for the 21 st Century

Purpose of Study 7 -14 The teaching should enable pupils to express their ideas

Purpose of Study 7 -14 The teaching should enable pupils to express their ideas and thoughts in another language and to understand respond to its speakers, both in speech and in writing. It should also provide opportunities for them to communicate for practical purposes, learn new ways of thinking and read great literature in the original language. Advancing language capability for the 21 st Century

POS: Addressing the mobility and employability agenda Language teaching should provide the foundation for

POS: Addressing the mobility and employability agenda Language teaching should provide the foundation for learning further languages, equipping pupils to study and work in other countries. Advancing language capability for the 21 st Century

GCSE Subject Learning Outcomes Students should develop their ability and ambition to communicate with

GCSE Subject Learning Outcomes Students should develop their ability and ambition to communicate with native speakers in speech and writing. The study of a modern foreign language at GCSE should also broaden students’ horizons and encourage them to step beyond familiar cultural boundaries and develop new ways of seeing the world. Advancing language capability for the 21 st Century

Interdisciplinary vision for Advanced Level, developing the global mind-set In addition to high level

Interdisciplinary vision for Advanced Level, developing the global mind-set In addition to high level practical language skills, the content of AS and A level in modern foreign languages provides depth of knowledge, understanding and intercultural competence … Advancing language capability for the 21 st Century

AS and A Level developing transferable skills …fosters a range of transferable skills such

AS and A Level developing transferable skills …fosters a range of transferable skills such as communication skills, critical thinking, autonomy, resourcefulness, creativity, and linguistic, cultural and cognitive flexibility; all of which are of value to the individual, to wider society, to higher education and to employers. Advancing language capability for the 21 st Century

First European Survey on Language Competence (2012) Advancing language capability for the 21 st

First European Survey on Language Competence (2012) Advancing language capability for the 21 st Century

The national curriculum for languages aims to ensure that all pupils: q Understand respond

The national curriculum for languages aims to ensure that all pupils: q Understand respond to spoken and written language from a variety of authentic sources q Speak with increasing confidence, fluency and spontaneity, finding ways of communicating what they want to say, including through discussion and questions, and continually improving the accuracy of their pronunciation and intonation q Can write at varying length, for different purposes and audiences, using the variety of grammatical structures that they have learnt q Discover and develop an appreciation of a range of writing in the language studied, including literary texts Advancing language capability for the 21 st Century

The new GCSE builds on prior learning and deepens the foundations for further study

The new GCSE builds on prior learning and deepens the foundations for further study q Cumulative and progressive in content and language q Understand use language for a variety of purposes and with a variety of audiences, including for personal, academic and employmentrelated use q Emphasis on authentic sources of spoken and written language including broadcast and social media q Personal communication, public information, factual and literary texts, appropriate to the level of maturity q Literary texts can include extracts and excerpts, adapted and abridged, from poems, letters, short stories, essays, novels, plays from contemporary and historical sources Advancing language capability for the 21 st Century

Contexts organised in broad themes q. Identity and culture q. Local, national, international and

Contexts organised in broad themes q. Identity and culture q. Local, national, international and global areas of interest q. Current and future study and employment Advancing language capability for the 21 st Century

Communication and interaction Listen and respond Initiate and develop Speak coherently and confidently Advancing

Communication and interaction Listen and respond Initiate and develop Speak coherently and confidently Advancing language capability for the 21 st Century

Avoiding false dichotomies q. Accuracy v Fluency q. Grammar v Communicative competence q. Literature

Avoiding false dichotomies q. Accuracy v Fluency q. Grammar v Communicative competence q. Literature versus popular culture q. Academic discipline v practical skill q. Language as a subject v language as a medium of instruction (CLIL) Advancing language capability for the 21 st Century

Can Flaubert meet the boardroom? Advancing language capability for the 21 st Century

Can Flaubert meet the boardroom? Advancing language capability for the 21 st Century

Successful independent control of the language builds confidence and motivation Accuracy q. Develop their

Successful independent control of the language builds confidence and motivation Accuracy q. Develop their ability to communicate confidently and coherently … conveying what they want to say with increasing accuracy Fluency q. Express and develop thoughts and ideas spontaneously and fluently Advancing language capability for the 21 st Century

METACOGNITION AND LEARNING STRATEGIES Knowledge about Language strategies language q. Deepen their q Develop

METACOGNITION AND LEARNING STRATEGIES Knowledge about Language strategies language q. Deepen their q Develop language knowledge about how strategies, including language works and repair strategies enrich their vocabulary to increase q(Communication their independent use strategies now featured in GCSE and understanding of criteria) extended language Advancing language capability for the 21 st Century

Personalising functional grammar to make the meanings that matter q There will be communicative

Personalising functional grammar to make the meanings that matter q There will be communicative quick wins (memorised, initially unanalysed, chunks) q. However, the focus in on taking independent control of the language system (CREATIVITY) q. Deconstruction and reconstruction of language Advancing language capability for the 21 st Century

Acquiring and applying language to construct new identities and new knowledge q. Acquire new

Acquiring and applying language to construct new identities and new knowledge q. Acquire new knowledge, skills and ways of thinking through the ability to understand respond to a rich range of authentic spoken and written material, including literary texts q. Develop awareness and understanding of the culture and identity of the countries and communities where the language is spoken q. Be encouraged to make appropriate links to other areas of the curriculum to enable bilingual and deeper learning, where the language may become a medium for constructing and applying knowledge Advancing language capability for the 21 st Century

Key characteristics of successful learning q. Opportunities to interact with language q. Language learning

Key characteristics of successful learning q. Opportunities to interact with language q. Language learning that does not trivialise the content q. Progression from processing language to productive capability Advancing language capability for the 21 st Century

Key characteristics of successful learning (continued) q. Metacognition – KAL, LLS and creative reconstruction

Key characteristics of successful learning (continued) q. Metacognition – KAL, LLS and creative reconstruction q. Meaning seeking and meaning making q. Developing executive control – towards bilingual grammar q. Mediating between cultures (comparative cultural moments) Advancing language capability for the 21 st Century

Phonology, grammatical structures and vocabulary Advancing language capability for the 21 st Century

Phonology, grammatical structures and vocabulary Advancing language capability for the 21 st Century

Linguistic benefits • Analytically complex language is globally learnt e. g. future tense, perfect

Linguistic benefits • Analytically complex language is globally learnt e. g. future tense, perfect tense • Songs and rhymes offer more than letters and sounds – sentence level phonetics, sentence stress, rhythm and intonation • Lexical bundles that can be adapted and used in new contexts Advancing language capability for the 21 st Century

Brave new curriculum 2014 and beyond There are real possibilities for flexible and creative

Brave new curriculum 2014 and beyond There are real possibilities for flexible and creative use of new technologies and interdisciplinary contexts to develop language and cultural competence Advancing language capability for the 21 st Century

Jeunes journos bilingues http: //www. ofaj. org/carnets-de-voyage-en-baladodiffusion üInterviews üProject planning üCollaboration in two languages

Jeunes journos bilingues http: //www. ofaj. org/carnets-de-voyage-en-baladodiffusion üInterviews üProject planning üCollaboration in two languages üPodcast üArticles üReview Process, product, reflection Advancing language capability for the 21 st Century

Advancing language capability for the 21 st Century

Advancing language capability for the 21 st Century

Student as critic Le goûter – Bruno Vaussenat (2008) Un garçon de neuf ans

Student as critic Le goûter – Bruno Vaussenat (2008) Un garçon de neuf ans est renvoyé de son école pour s'être battu. Son père le confie à son grand-père pour qu'il le garde. Ce dernier va alors lui préparer un grand goûter et lui apprendre à se défendre. Mais il va également lui révéler un secret de famille caché depuis de nombreuses années. Advancing language capability for the 21 st Century

Goethe Institut provides rich authentic resources Advancing language capability for the 21 st Century

Goethe Institut provides rich authentic resources Advancing language capability for the 21 st Century

Responding to authentic testimony Advancing language capability for the 21 st Century

Responding to authentic testimony Advancing language capability for the 21 st Century

Postmaterielle Jugendliche • Suche nach sinnstiftender Weltschauung und einem anderen moralischen Bezugspunkt, Selbsterkenntnis und

Postmaterielle Jugendliche • Suche nach sinnstiftender Weltschauung und einem anderen moralischen Bezugspunkt, Selbsterkenntnis und Verwirklichung der eigenen Existenz als dominante Motivation • Paradigmatische Fragen. Wer bin ich? Was ist richtig? Wie will ich leben? Advancing language capability for the 21 st Century

Using humour as a stimulus • Parlez-moi de Christophe Colombe • Alors, il fait

Using humour as a stimulus • Parlez-moi de Christophe Colombe • Alors, il fait la découverte de l’Amérique • Fut • Récitez-moi le passé simple du verbe faire • Je fus, tu fus, il fume! Advancing language capability for the 21 st Century

Understanding the purpose, important ideas and details Advancing language capability for the 21 st

Understanding the purpose, important ideas and details Advancing language capability for the 21 st Century

: «Eau et assainissement : quelles stratégies pour relever les défis du millénaire ?

: «Eau et assainissement : quelles stratégies pour relever les défis du millénaire ? » Advancing language capability for the 21 st Century

GCSE: Scan for particular information, organize and present relevant details…translate a short passage into

GCSE: Scan for particular information, organize and present relevant details…translate a short passage into English Dans son sous-sol, le continent africain recèle 660 000 kilomètres cubes de réserves d’eau. Cette ressource est cent fois supérieure à la quantité d’eau en surface. Et pourtant, selon un rapport publié au cours du 13 e congrès de l’Association africaine de l’eau (AFWA) tenu en Algérie sous le thème : «Eau et assainissement : quelles stratégies pour relever les défis du millénaire ? » , un tiers de la population africaine, soit 330 millions, n’a pas accès à l’eau potable et presque la moitié des Africains souffre de problèmes de santé dus au manque d’eau potable Advancing language capability for the 21 st Century

Lettre qu'Albert Camus envoya à son instituteur au lendemain de son prix Nobel Advancing

Lettre qu'Albert Camus envoya à son instituteur au lendemain de son prix Nobel Advancing language capability for the 21 st Century

LE CONFLIT ISRAELO-PALESTINIEN Bientôt cent ans d’histoire Juif et musulman dans le roman Advancing

LE CONFLIT ISRAELO-PALESTINIEN Bientôt cent ans d’histoire Juif et musulman dans le roman Advancing language capability for the 21 stpour Century contemporain les adolescents

How do we create bridges between social networking, texts and blogs and literary texts?

How do we create bridges between social networking, texts and blogs and literary texts? Advancing language capability for the 21 st Century

Des Textos français 12 C 4 un de ces quatre 2 ri 1 de

Des Textos français 12 C 4 un de ces quatre 2 ri 1 de rien 6 né Ciné A+/@+ À plus C pa 5 pa C'est pas sympa p 2 k Pas de quoi Je c Je sais Je le sa. V Je le savais Jenémar J'en ai marre Je t'M Je t’aime Je vé/J'vé Je vais GHT 2 V 1 J'ai acheté du vin Advancing language capability for the 21 st Century

Le Dormeur du Val Arthur Rimbaud octobre 1870 L'homme blessé Gustave Courbet (1819 -1877)

Le Dormeur du Val Arthur Rimbaud octobre 1870 L'homme blessé Gustave Courbet (1819 -1877) C'est un trou de verdure où chante une rivière Accrochant follement aux herbes des haillons D'argent ; où le soleil, de la montagne fière, Luit : c'est un petit val qui mousse de rayons. Un soldat jeune, bouche ouverte, tête nue, Et la nuque baignant dans le frais cresson bleu, Dort ; il est étendu dans l'herbe sous la nue, Pâle dans son lit vert où la lumière pleut. Les pieds dans les glaïeuls, il dort. Souriant comme Sourirait un enfant malade, il fait un somme : Nature, berce-le chaudement : il a froid. Les parfums ne font pas frissonner sa narine ; Il dort dans le soleil, la main sur sa poitrine Tranquille. Il a deux trous rouges au côté droit. Advancing language capability for the 21 st Century

Dos lobos http: //sechangersoi. be/ES/5 ES-Leyendas/Loslobos. htm Una mañana un viejo Cherokee le contó

Dos lobos http: //sechangersoi. be/ES/5 ES-Leyendas/Loslobos. htm Una mañana un viejo Cherokee le contó a su nieto acerca de una batalla que ocurre en el interior de las personas. Él dijo, "Hijo mío, la batalla es entre dos lobos dentro de todos nosotros". "Uno es Malvado - Es ira, envidia, celos, tristeza, pesar, avaricia, arrogancia, autocompasión, culpa, resentimiento, soberbia, inferioridad, mentiras, falso orgullo, superioridad y ego. "El otro es Bueno - Es alegría, paz amor, esperanza, serenidad, humildad, bondad, benevolencia, amistad, empatía, generosidad, verdad, compasión y fe. El nieto lo meditó por un minuto y luego preguntó a su abuelo: “¿Qué lobo gana? ” El viejo Cherokee respondió: "Aquél al que tú alimentes. " Advancing language capability for the 21 st Century

Key competences for young Europeans In the future, creativity, the ability to think laterally,

Key competences for young Europeans In the future, creativity, the ability to think laterally, adaptability and other 'transversal' skills will be valued more than the specific bodies of knowledge that schools have traditionally taught. q Communication in the mother tongue q Communication in a foreign language q Maths, science and technology q Digital competence q Learning to learn q Social and civic competences q Sense of initiative and entrepreneurship q Cultural awareness and expression Advancing language capability for the 21 st Century

Heidegger’s concept of Dasein q. Living life through another language and culture contributes to

Heidegger’s concept of Dasein q. Living life through another language and culture contributes to defining our existence, our reality, our ‘now’. q. The now for 2015 is culturally rich, pluralist and multilingual q. Language learning can connect us to our past, define our present and transform our future. Advancing language capability for the 21 st Century

‘Die Welt ist jetzt Ihnen offen’ Advancing language capability for the 21 st Century

‘Die Welt ist jetzt Ihnen offen’ Advancing language capability for the 21 st Century