What you will learn: Types of NSF Program Grants Locating Grants Cyberinfrastructure Grants Planning

What you will learn: Types of NSF Program Grants Locating Grants Cyberinfrastructure Grants Planning a Grant Writing the Grant Proposal Review and Follow-up Grant Management

Grant proposal writing is EASY!

Grant proposal writing is EASY!

Types of Grants Monetary award given by a government agency, foundation, corporation or other

Types of Grants Monetary award given by a government agency, foundation, corporation or other entity to fund a particular project Generally given to organizations as opposed to individuals

Silent partners: Federal Government “If you take any major information technology company today, from

Silent partners: Federal Government “If you take any major information technology company today, from Google to Intel to Qualcomm to Apple to Microsoft and beyond, you can trace the core technologies to the rich synergy between federally funded universities and industry research and development. ” (New York Times, 6 -2012) https: //beta. congress. gov/bill/113 th-congress/housebill/4186 - Frontiers in Innovation, Research, Science, and Technology Act of 2014 or FIRST Act of 2014 - Strengthens NSF policy of awarding funds for science. NSF is moving away from behavioral sciences and political science, and increasing science research.

Silent partners: Philanthropists Oklahoma Total contributions - $1. 7 -billion Median contribution - $3,

Silent partners: Philanthropists Oklahoma Total contributions - $1. 7 -billion Median contribution - $3, 116 Median discretionary income - $55, 788 Percent of income given - 5. 6% (Tulsa 6%, OKC 5. 5%)

Giving by…. Individuals 73% Bequests 8% $212 billion $23 billion Foundations 14% Corporations 5%

Giving by…. Individuals 73% Bequests 8% $212 billion $23 billion Foundations 14% Corporations 5% $41 billion $15 billion

Types of Grants Special Project – new project or project with limited timeframe: research,

Types of Grants Special Project – new project or project with limited timeframe: research, solving a problem, developing something new, recruiting… Operating – running program to meet community needs Capital/Equipment – specified amount for construction, renovation, expansion, purchase land or equipment Endowments - planned gifts, will or trust, use the interest only, not the grant itself

Locating Grants Ø Government - Federal, State, Local 26 Federal Agencies (900 programs) Ø

Locating Grants Ø Government - Federal, State, Local 26 Federal Agencies (900 programs) Ø Foundations - Second-largest source 238 Oklahoma Foundations; 75, 000 private grant making foundations in the US Ø Direct Corporations or Philanthropists

NSF Cyberinfrastructure Grant Proposals Cyberinfrastructure Campus Cyberinfrastructure - Data, Networking, and Innovation Program (CC*DNI)

NSF Cyberinfrastructure Grant Proposals Cyberinfrastructure Campus Cyberinfrastructure - Data, Networking, and Innovation Program (CC*DNI) - 7 awards Cyberinfrastructure Training, Education, Advancement, and Mentoring for Our 21 st Century Workforce Cybersecurity Innovation for Cyberinfrastructure (CICI) NSF Fellowships for Transformative Computational Science using Cyber. Infrastructure (CI Tra. CS) Software Development for Cyberinfrastructure (SDCI) Strategic Technologies for Cyber. Infrastructure (STCI)

NSF Grants Conference 2015 NSF Grants Conference June 1 -2, 2015 State University System

NSF Grants Conference 2015 NSF Grants Conference June 1 -2, 2015 State University System of Florida Tampa, FL

 NSF is an interactive and responsive agency. Their active motto is: “Call early—call

NSF is an interactive and responsive agency. Their active motto is: “Call early—call often”

NSF Distribution by Average Reviewer Ratings for Awards and Declines, FY 2013

NSF Distribution by Average Reviewer Ratings for Awards and Declines, FY 2013

Key Documents Proposal & Award Policies & Procedures Guide www. nsf. gov/publications/pub_summ. jsp? ods_key=papp

Key Documents Proposal & Award Policies & Procedures Guide www. nsf. gov/publications/pub_summ. jsp? ods_key=papp Fiscal Year 2015 Budget Request www. nsf. gov/about/budget/fy 2015/index. jsp NSF Strategic Plan for Fiscal Years 2014 -2018 www. nsf. gov/publications/pub_summ. jsp? ods_key=nsf 14 043 NSB Report on Merit Review www. nsf. gov/nsb/publications/pub_summ. jsp? ods_key= nsb 1333

Assessing Funding Eligibility: Example Explore NSF award data: http: //dellweb. bfa. nsf. gov/ Look

Assessing Funding Eligibility: Example Explore NSF award data: http: //dellweb. bfa. nsf. gov/ Look at NSF Transforming Undergraduate Education in Science, Technology, Engineering and Math: http: //www. nsf. gov/funding/pgm_summ. jsp? pims_ id=5741 Read grant solicitation

Proposal and Award Policies and Procedures Guide The Proposal & Award Policies & Procedures

Proposal and Award Policies and Procedures Guide The Proposal & Award Policies & Procedures Guide (PAPPG) - NSF's proposal and award process Two parts: ◦ Part I - NSF’s proposal preparation and submission guidelines – the NSF Grant Proposal Guide (GPG) and the NSF Grants. gov Application Guide ◦ Part II - NSF’s award and administration guidelines – the documents used to guide, manage, and monitor the award and administration of grants and cooperative agreements

Assessing Info in Solicitation (look at website) Goal of Program ◦ Research ◦ Education

Assessing Info in Solicitation (look at website) Goal of Program ◦ Research ◦ Education Eligibility ◦ Type of organization ◦ Geographic restrictions ◦ Population target Special proposal preparation and/or award requirements ◦ Size of award, number of grants, award size & duration

Any time, target dates & deadlines

Any time, target dates & deadlines

Planning a Grant Proposal Letters of Intent – Required or requested Better management Alternative

Planning a Grant Proposal Letters of Intent – Required or requested Better management Alternative to a call or visit (Investigate organization to find preference) Do homework before the letter for previous funding history, types of projects, amounts Provide information about your organization Provide information about your proposed project

 Preliminary Proposals – Sometimes required, sometimes optional ◦ Reduce proposers overall effort ◦

Preliminary Proposals – Sometimes required, sometimes optional ◦ Reduce proposers overall effort ◦ Improve quality of submissions

Proposal Components Proposals that do not contain the following required sections will not be

Proposal Components Proposals that do not contain the following required sections will not be accepted : Project Summary ▸ Project Description References Cited ▸ Biographical Sketch(es) – 2 pages Budget ▸ Budget Justification Current and Pending Support ▸ Facilities, Equipment and Other Resources Data Management Plan ▸ Postdoctoral Mentoring Plan (if applicable) • If submission instructions do not require one of the above sections to be provided, proposers must insert text or upload a document in that section of the proposal that states, “Not Applicable. ”

Cover Sheet

Cover Sheet

Merit and Broader Impacts Statements Proposals that do not separately address the overview and

Merit and Broader Impacts Statements Proposals that do not separately address the overview and both intellectual merit review criteria and broader impact review criteria in text boxes will not be accepted by Fast. Lane. Project summaries with special characters must be uploaded as a PDF document (all should be).

Project Description Proposers should address: what they want to do why they want to

Project Description Proposers should address: what they want to do why they want to do it (Reference information is required, and proposers must follow accepted scholarly practices in providing citations for source materials. ) how they plan to do it how they will know if they succeed what benefits if the project is successful A separate section within the narrative must include a discussion of the broader impacts of the proposed activities.

Planning a Grant Proposal Start with an innovative idea that addresses a specific challenge

Planning a Grant Proposal Start with an innovative idea that addresses a specific challenge and/or need (purpose). Start documenting need. Social/economic costs, beneficiaries, nature of the problem, impending implications? Scan and identify grant opportunities. …. Or go backwards: start with a grant opportunity and develop it into a proposal

Planning a Grant Proposal Target a grant o Make contact with NSF program director!

Planning a Grant Proposal Target a grant o Make contact with NSF program director! o Make sure your focus aligns to the grant criteria Review successful and recent awards. Identify partners, define roles and build partnerships as well as community support. It is a BEST PRACTICE to collaborate with partners for more impact. Many agencies and foundations require collaboration.

Planning a Grant Proposal Components Institutional Support Letter of Intent Transmittal Letter Title Page

Planning a Grant Proposal Components Institutional Support Letter of Intent Transmittal Letter Title Page Abstract Table of Contents Project Description Data Management Plan Dissemination Plan Evaluation Plan Budget and budget justification RCR Training Plan Senior personnel bio statements

Planning a Grant Proposal Components ◦ Purpose(s) Goal(s) or aim(s) Objectives or accomplishments ◦

Planning a Grant Proposal Components ◦ Purpose(s) Goal(s) or aim(s) Objectives or accomplishments ◦ Methodology Design and Timeframe Work charts of activities, responsibilities, dates Personnel titles and descriptions

Planning a Grant Proposal Components ◦ Resources Partners - Organization/Partner Organization Descriptions Personnel –

Planning a Grant Proposal Components ◦ Resources Partners - Organization/Partner Organization Descriptions Personnel – Resumes of all personnel and partners Institutional support – Commitment letters, institutional descriptions and data Community support Prior funded projects ◦ Data Management Plan For data, samples, physical collections, curriculum materials and other related research and education products Preservation Documentation Sharing Or, assert no need for a data management plan

Planning a Grant Proposal Components ◦ Evaluation Plan Internal and External Evaluators Quantitative and

Planning a Grant Proposal Components ◦ Evaluation Plan Internal and External Evaluators Quantitative and Qualitative Measures Aligned to Goals Formative Evaluation Techniques Summative Evaluation Techniques Measures ◦ Dissemination plan Traditional conference paper and/or article Non-traditional website, webinar, blog, class, seminar, curriculum infusion, bridge program, collaboration Attachments Bibliography Resumes • Letters of commitment

Planning a Grant Proposal Compelling Needs Statement Heart of your entire case for support!

Planning a Grant Proposal Compelling Needs Statement Heart of your entire case for support! Capture attention!

Planning a Grant Proposal Using Statistics Tell ◦ How much? ◦ How many? ◦

Planning a Grant Proposal Using Statistics Tell ◦ How much? ◦ How many? ◦ How often? ◦ How severe? ◦ How costly? …but don’t overwhelm! Short!

Planning a Grant Proposal Using Statistics Sources ◦ US Census Bureau: www. census. gov

Planning a Grant Proposal Using Statistics Sources ◦ US Census Bureau: www. census. gov ◦ Bureau of Labor Statistics: www. bls. gov ◦ Oklahoma Department of Commerce: www. okcommerce. gov ◦ Employment Security Commission: www. oesc. state. ok. us ◦ Local Chambers of Commerce, nonprofits, professional associations

Planning a Grant Proposal Using Statistics ◦ Oklahoma Regents for Higher Education: www. okhighered.

Planning a Grant Proposal Using Statistics ◦ Oklahoma Regents for Higher Education: www. okhighered. org ◦ Oklahoma Education Information System (OEIS) http: //www. okhighered. org/studies-reports/ ◦ National Center for Educational Statistics (NCES) – College & Career Tables Library, part of Data. Lab - http: //nces. ed. gov/datalab ◦ What Works Clearinghouse; ERIC education database; ten Regional Educational Laboratories; national Research and Development Centers - http: //ies. ed. gov/ ◦ (OK) Education Oversight Board - www. schoolreportcard. org ◦ Local universities, school districts (less reliable – state and national data verified)

Creating Sense of Urgency Statistics ◦ Approximately ___data transmissions from Our University to our

Creating Sense of Urgency Statistics ◦ Approximately ___data transmissions from Our University to our collaborators were sent at xx rate in 2013. National Need Compared to Local Need ◦ In the US, is estimated that ___percent of data transmissions are at a rate of xx; this means that at Our University ___ of our data transmissions are below the national majority…. Leader/Expert Quotes ◦ Harvard researcher shows speed of data transmission increased 10 -fold with the whitchit we propose to use…. Case Statements ◦ Mary Quick, a doctoral student in whitchit research, can do …. .

HOW TO WRITE Write simply http: //www. youtube. com/watch? v=Gd. Vd 9 RXr 0

HOW TO WRITE Write simply http: //www. youtube. com/watch? v=Gd. Vd 9 RXr 0 Ss&f eature=relmfu Plain Language - http: //www. plainlanguage. gov/ One subject/one verb/one object. Do not use acronyms. Your reviewers will be of mixed expertise. Use correct science, but simple descriptions.

Writing a Grant Proposal Write your needs statement.

Writing a Grant Proposal Write your needs statement.

Planning a Grant Proposal Project Plan and Description What you plan to do to

Planning a Grant Proposal Project Plan and Description What you plan to do to address the need.

Writing a Grant Proposal Project Description What? ◦ Goals and Objectives Why? ◦ Best

Writing a Grant Proposal Project Description What? ◦ Goals and Objectives Why? ◦ Best Practices/Effectiveness How? ◦ Tasks/Activities Who? ◦ Qualified Program Personnel When? ◦ Time Line

Writing a Grant Proposal Effective Goals/Objectives Goals - Broad statements reflecting ultimate results of

Writing a Grant Proposal Effective Goals/Objectives Goals - Broad statements reflecting ultimate results of accomplishment. ◦ Increase data transmission rate from xx toxxx. Objectives – Measurement of what the organization will do to accomplish goal. ◦ Install 54 supportive whitchits for…. between Sept. and May Activities - Specific Tasks or Strategies ◦ Design and develop tutoring model for faculty, doctoral student, masters student, and undergraduate researchers ◦ Analyze 100 transmissions of…. Outcomes – Measure change as a result of project. ◦ 3 examples of data transmissions for project increased by 100%

Planning and Writing the Grant Proposal Project Timeline Goal: Primary goal of Our University

Planning and Writing the Grant Proposal Project Timeline Goal: Primary goal of Our University Whichit Project is to increase data transmission to collaborative partners by 10 fold Objective: Activity Install 20 new whichits in Our University network. Date Responsibility 1. Bids for whichits October 2018 Primary Investigator and senior personnel 2. Install whichits August 2019 Doctoral student technicians Method Benchmark 7 largest manufacturers Select bid by 12 -25 -18 Hire technical assistants 50% by 4 -3018 and 100% by 7 -31 -18

Planning and Writing the Grant Proposal - Project Personnel Who will manage the project?

Planning and Writing the Grant Proposal - Project Personnel Who will manage the project? Who will be involved in the project? What are their qualifications? What are their responsibilities? What is the management/organizational structure for the project? Are you using existing personnel or hiring someone after the award? If hiring, add a job description

Planning and Writing the Grant Proposal Project Personnel Documentation Assure funding agency you have

Planning and Writing the Grant Proposal Project Personnel Documentation Assure funding agency you have the qualified staff to carry out the project. ◦ Job Description ◦ Bio or Resume ◦ Key Responsibilities ◦ Project Experience ◦ Organizational Chart

Questions to Consider Are goals/objectives/activities logically derived from needs statement? Have you explained why

Questions to Consider Are goals/objectives/activities logically derived from needs statement? Have you explained why you selected activities or methods? Is the timing and order of events clear and understandable? Is it clear who will perform specific activities? Are they fully qualified? Are proposed activities feasible considering resources? Is the proposal easy to read? www. plainlanguage. gov/

Data Management Plan NSF – 2 page limit If no data management plan, state

Data Management Plan NSF – 2 page limit If no data management plan, state that in the proposal. 1. Describe the data and formats to be collected 2. Describe physical and cyber resources for storage 3. Describe dissemination methods will be used to 4. Describe the policies for sharing and public access (including provisions for confidentiality & security) 5. Describe the roles and responsibilities of all parties after the grant ends

Data Management Plan POST-AWARD MANAGEMENT After an award is made, implementation of the DMP

Data Management Plan POST-AWARD MANAGEMENT After an award is made, implementation of the DMP will be monitored through the annual and final report process. Data management must be reported in subsequent proposals by the PI and Co-PIs under “Results of prior NSF support”.

Planning and Writing the Grant Proposal Dissemination Plan How will you share information about

Planning and Writing the Grant Proposal Dissemination Plan How will you share information about the project at the beginning, during and after the grant is ended? How will you share information about project discoveries and resources? Who will you target? What communication tools will you use?

Planning and Writing the Grant Proposal Dissemination Plan Communication Tools ◦ Name the state

Planning and Writing the Grant Proposal Dissemination Plan Communication Tools ◦ Name the state and national conferences ◦ Publications, i. e. journal articles (name 3 journals) ◦ Newsletters, mailed announcements (name them or make up your own newsletter and mailing list) ◦ Web Sites (existing ones and your own) ◦ Social media, Pod casts, Wikipedia, Blogs, Webinars (use OK One. Net) ◦ Interactive Television; Videoconferences (use OK One. Net) ◦ Commercial Television Ads or Public Service Announcements ◦ News Releases – write them, published free ◦ Newspaper Ads - pay ◦ Community Organization Meetings – short presentations ◦ School Classes – guest speaker ◦ Speakers’ Bureaus ◦ Posters, billboards, public bus ads, bus-stop ads

Planning and Writing the Grant Proposal Evaluation Plan Documenting Results and Impact

Planning and Writing the Grant Proposal Evaluation Plan Documenting Results and Impact

Planning and Writing the Grant Proposal Evaluation Benefits Strengthens proposals in eye of reviewers.

Planning and Writing the Grant Proposal Evaluation Benefits Strengthens proposals in eye of reviewers. ◦ What works best. Learn what is going well and what is not. ◦ Program improvement during the project Ensures project is operating effectively. ◦ Recipients of public trust. Create a replicable model for others to use.

Planning and Writing the Grant Proposal Planning Evaluation What questions will evaluation answer? What

Planning and Writing the Grant Proposal Planning Evaluation What questions will evaluation answer? What are the specific evaluation plans and time frames? What data will be collected? Who will be evaluated/what will be measured? When will data be collected? What strategies, tools, or instruments will be used? Who will conduct the evaluation? Who will write and receive the report? How will the information be used to improve the project?

Planning and Writing the Grant Proposal Evaluators Internal versus external evaluator – or both

Planning and Writing the Grant Proposal Evaluators Internal versus external evaluator – or both Funder requirements ◦ External outside entity Funding availability – rule of thumb = approximately 10% of project cost Qualified candidates Advisory committee

Planning and Writing the Grant Proposal Assessment Measures Quantitative ◦ Number driven ◦ Bottom

Planning and Writing the Grant Proposal Assessment Measures Quantitative ◦ Number driven ◦ Bottom line ◦ Products Qualitative ◦ Quality ◦ Perceptions and experiences of participants ◦ Adjust programs and procedures

Planning and Writing the Grant Proposal Evaluation Processes Formative Evaluation Ongoing process of measuring

Planning and Writing the Grant Proposal Evaluation Processes Formative Evaluation Ongoing process of measuring project effectiveness Regularly scheduled data collection – monthly, yearly? How well completing project activities - timeline Summative Evaluation Final results – each year or at end of total project Length of grant Goals and Objectives Instruments - a description of scales to assess attitudes, skills and other outcomes related to STEM fields http: //www. pearweb. org/atis/tools/browse? middle=true Methods - some simple ways to analyze outcome data - http: //tinyurl. com/Analyzing-Outcome-Data

Planning and Writing the Grant Proposal Budget justifies expenses and aligns with proposal narrative.

Planning and Writing the Grant Proposal Budget justifies expenses and aligns with proposal narrative.

Planning and Writing the Grant Proposal Budgeting Steps Establish budget period. Estimate expenses. Decide

Planning and Writing the Grant Proposal Budgeting Steps Establish budget period. Estimate expenses. Decide whether and how to include indirect costs. Remember that indirect costs are real! All subgrantees are eligible for their indirect costs (UG 2014) Estimate project revenues.

Planning and Writing the Grant Proposal Budget Direct Expenses Consider: Implementation, continuation, and phase-down

Planning and Writing the Grant Proposal Budget Direct Expenses Consider: Implementation, continuation, and phase-down costs. ◦ Salaries and increases (no grant personnel can be treated differently than regular university personnel) ◦ Utilities, insurance, rental space, and equipment ◦ Food, transportation, and telephone ◦ Evaluation systems, audits, accounting systems, and dissemination activities ◦ Equipment, materials and supplies

Planning and Writing the Grant Proposal Budget Indirect Costs Shared by all of the

Planning and Writing the Grant Proposal Budget Indirect Costs Shared by all of the program and entity but difficult to assign specific amounts to any one program, i. e. : ◦ Liability Insurance ◦ Copier Lease ◦ Financial Management ◦ Security ◦ Utilities ◦ Parking space Recovery of indirect costs: ◦ Funder’s guidelines ◦ Organization guidelines

Planning and Writing the Grant Proposal Budget Cash Match Cash match (hard cash) Work

Planning and Writing the Grant Proposal Budget Cash Match Cash match (hard cash) Work with business manager to explore: ◦ General operating funds ◦ Specialized allocations ◦ Other state or federal grants (allowable) ◦ Private sector grants ◦ Set up a fund internally for matching

Planning and Writing the Grant Proposal Budget Principles 1. 0 mistakes! (at least 3

Planning and Writing the Grant Proposal Budget Principles 1. 0 mistakes! (at least 3 proofers) 2. Consistent format – numbers, dollar signs, decimals, commas 3. Ask for enough, but just enough. 4. Clearly justify your figures with real estimates, real travel locations, real mileage, real salaries (no estimates). 5. Tell your story. If someone cannot understand your project from reading your budget, start over. 6. Include ALL project costs, ALL internal contributions, ALL partner contributions, and plans for sustaining the project. 7. When you do not have a person hired for a position, include a clear job description.

Planning and Writing the Grant Proposal Budget Presentation Present your budget in 4 different

Planning and Writing the Grant Proposal Budget Presentation Present your budget in 4 different ways: Narrative format (a short summary that refers to percentages and precedes the standard format). Visual format, such as a pie chart that reflects the percentages mentioned in the narrative. Standard numerical format. Budget justification (details about each numerical item and follows the standard format).

Budget Sample Preceding Narrative The overall budget for the Center for Super. OU Research

Budget Sample Preceding Narrative The overall budget for the Center for Super. OU Research is projected to be $465, 000. Of this amount 53% is for large equipment, 37% is for programs and services related to collaborative research, and 10% is for technical assistance.

Budget Sample Visual Format

Budget Sample Visual Format

Budget Sample Standard Form Item A. (usually provided) Annual Expense Personnel (Salaries, Wages) Executive

Budget Sample Standard Form Item A. (usually provided) Annual Expense Personnel (Salaries, Wages) Executive Director Administrative Assistant, . 5 FTE Program Director Program Assistant Development Director Membership Coordinator Office Assistant Total Personnel B. Benefits Medical/dental coverage C. Contractual 1. Web design and maintenance 2. Accounting (monthly) $65, 000 $22, 000 $38, 000 $32, 000 $26, 500 $38, 000 $183, 500 $22, 000 $11, 500 $ 500

Budget Justification Thoughtful narrative per each item Summary overview Discuss any significant increases or

Budget Justification Thoughtful narrative per each item Summary overview Discuss any significant increases or decreases compared with last year's or next year's budget Important figures (such as a high per unit cost). For example, if your $250, 000 organization has a $75, 000 increase in rent, explain why. If you hire a manager at ½ the salary, explain why and how much full salarie would be.

Sample Budget Justification Executive Director, Dr. Joan Smith - The budget request is for.

Sample Budget Justification Executive Director, Dr. Joan Smith - The budget request is for. 5 FTE director @ $95, 000 annual salary plus fringe at 28%. Administrative Assistant, Ms. Mary Smith – The budget request is for. 5 FTE administrative assistant @ $37, 500 annual salary plus fringe at 22%. She will be. 5 FTE for the Oklahoma GEAR UP Program at the same time. Office space is being contributed to the project by the Oklahoma GEAR UP program.

Get Budgeting Help! If you are new to budgeting or want to take a

Get Budgeting Help! If you are new to budgeting or want to take a moment to be sure that you are up-to-speed on preparing a budget, there are sources available on-line that have good budget examples. Work with your budget officer!

Responsible Conduct of Research Training for Students and Post. Docs Plan required NSF, NIH

Responsible Conduct of Research Training for Students and Post. Docs Plan required NSF, NIH and USDA 8 hours minimum Live methods: not all online Research faculty involvement 9 topics Single contact record keeper

RCR Training Topics ◦ conflict of interest – personal, professional, and financial ◦ policies

RCR Training Topics ◦ conflict of interest – personal, professional, and financial ◦ policies regarding human subjects, live vertebrate animal subjects in research, and safe laboratory practices ◦ mentor/mentee responsibilities and relationships ◦ collaborative research including collaborations with industry ◦ peer review ◦ data acquisition and laboratory tools; management, sharing and ownership ◦ research misconduct and policies for handling misconduct ◦ responsible authorship and publication ◦ the scientist as a responsible member of society, contemporary ethical issues in biomedical research, and the environmental and societal impacts of scientific research

Letters of Commitment Must have substance! Avoid duplicate wording All partners Major personnel and

Letters of Commitment Must have substance! Avoid duplicate wording All partners Major personnel and consultants Include ◦ Need perspective ◦ Why proposal will solve need ◦ What support will they provide the project? Donate equipment/funding Hire graduates Identify participants Serve on committees Sustain after the grant period

Writing a Grant Proposal Abstract or Summary (look online) Proposal initiative ◦ Project name,

Writing a Grant Proposal Abstract or Summary (look online) Proposal initiative ◦ Project name, funding competition Statement of need Goals Measurable objectives Key activities Impact on problem ◦ What will improve and how many will project impact over project duration.

Writing a Grant Proposal Abstract or Summary Short – 1 paragraph to 2 pages

Writing a Grant Proposal Abstract or Summary Short – 1 paragraph to 2 pages This is the summary that is posted online after you are awarded. It is also sent to your local congressional office, and they use it to send out news releases. It should have all important information but no proprietary information. Usually written first and revised last.

Submission Process Oklahoma DOES NOT have a central point of contact requirement except for

Submission Process Oklahoma DOES NOT have a central point of contact requirement except for Homeland Security funds Read submission requirements early Individual or Partnership ◦ Drives grant/process ◦ Clearly defined roles Lead organization Subcontract Fiscal sponsor ◦ Plan Ahead (submit at least 1 week early) ◦ Follow Funder Process Application Instructions Technical requirements Checklist Electronic (Electronic takes TIME, sometimes days or weeks!) or Paper

Double Check Create checklist of required items and supplements. ◦ Proposal elements ◦ Criteria

Double Check Create checklist of required items and supplements. ◦ Proposal elements ◦ Criteria ◦ Technical requirements (proof font, tabs, margins, style) ◦ Submittal requirements (hard copy, e-copy) ◦ Budget Outside readers evaluate. New pair of eyes to evaluate work. Get three persons to review: one close, one semi-close, and one cold. Try a teenager or a grandmother. Track submission with follow-up note, call, or electronic verification.

Proposal Review Process Guidelines vary by entity Selection criteria and scoring ◦ Published in

Proposal Review Process Guidelines vary by entity Selection criteria and scoring ◦ Published in NSF solicitation ◦ Available from NSF http: //www. nsf. gov/publications/pub_summ. jsp? ods_key =gpg Peer review

Become a Peer Reviewer WHY? Learn to write better grant proposals Learn about the

Become a Peer Reviewer WHY? Learn to write better grant proposals Learn about the funded grants of the agency Learn the process and improve your odds Network with others like you Simplify your writing Provide a service – reviewers are needed! HOW? Tell the recipient of a grant Email the funders, program director, head of agency provide a vitae and short synopsis of why you may be of help Apply online – http: //www. nsf. gov/bfa/dias /policy/merit_review/review er. jsp Need not have grant experience, just content expertise

Life After the Submission Proposal is Accepted ◦ Yay!!! Plan your project administration. ◦

Life After the Submission Proposal is Accepted ◦ Yay!!! Plan your project administration. ◦ Negotiated. This is VERY OK, too!!! Proposal is Rejected ◦ Have 8 hours of depression and regroup. ◦ Obtain reviewer comments. ◦ Make personal visit. ◦ Plan a resubmission with improvements. ◦ All might not be lost. . . ◦ Write Thank You to the program director. In either case, keep writing. BE PERSISTENT! Consider it planting a seed for future growth.

EXAMPLE OF A GOOD THANK YOU Daily Oklahoman 5 -20 -15 Statement from Higher

EXAMPLE OF A GOOD THANK YOU Daily Oklahoman 5 -20 -15 Statement from Higher Education Chancellor Regarding Budget Agreement Oklahoma State System of Higher Education Chancellor Glen D. Johnson released the following budget statement in response to the FY 2016 budget agreement: “We want to thank Governor Fallin and our legislative leaders for making higher education a budget priority by fully addressing our $8. 6 million debt service needs related to the 2005 higher education bond issue and for limiting the state system of higher education’s budget cut. We appreciate the leadership provided by the Governor and Legislature in an extremely difficult budget year. The State Regents and our 25 public colleges and universities remain committed to providing Oklahoma students an exceptional higher education opportunity at a very affordable cost. ”

Remember: REJECTION IS GOOD! PROFESSIONAL CRITICISMS Lead to: CLARITY A BETTER PLAN LEARNING

Remember: REJECTION IS GOOD! PROFESSIONAL CRITICISMS Lead to: CLARITY A BETTER PLAN LEARNING

Grant Administration Financial Administration Critical ◦ Determine allowable/unallowable costs ◦ Maintain records Financial and

Grant Administration Financial Administration Critical ◦ Determine allowable/unallowable costs ◦ Maintain records Financial and staff Publicity ◦ Determine cost accounting standards, Uniform Guidance circular from OMB (Office of Management and Budget) Accounting Procurement Personnel Property management Travel Reporting

Dr. Linda Mason Oklahoma State Regents for Higher Education lmason@osrhe. edu 405 -225 -9486

Dr. Linda Mason Oklahoma State Regents for Higher Education lmason@osrhe. edu 405 -225 -9486

Book References Mary M. Licklider and The University of Missouri Grant Writer Network, Grant

Book References Mary M. Licklider and The University of Missouri Grant Writer Network, Grant Seeing in Higher Education: Strategies and Tools for College Faculty, Jossey-Bass, 2012. Joseph Barbato and Danielle S. Furlich, Writing for a Good Cause: David Bauer, The “How To” Grants Manual: Successful The Complete Guide to Crafting Proposals and Other Persuasive Pieces for Nonprofits, Simon and Shuster, 2000. Grantseeking Techniques for Obtaining Public and Private Grants, 3 rd, Oryx Press, Phoenix, AR, 1995. Alexis Carter Black, Getting Grants: The Complete Manual of Proposal Development and Administration, Self-Counsel Press, Bellingham, WA, 2006. Bev Browning, Grant Writing for Dummies, 2 nd. , Wiley Publishing, Hoboken, NJ, 2005. Mim Carlson, Winning Grants Step by Step, Jossey-Bass Publishers, San Francisco, 1995. Arlen Sue Fox and Ellen Karsh, The Only Grant-Writing Book You’ll Ever Need, Publishers Group West, 2006. Kenneth Henson, Grant Writing in Higher Education: A Step-by. Step Guide, Prentice Hall, 2003.

Interesting Articles “Hiring and Working With Grantwriters and Consultants: Know What You Need and

Interesting Articles “Hiring and Working With Grantwriters and Consultants: Know What You Need and Let Them Do It!” – Linda Hauser, Wednesday, May 04, 2005, http: //charitychannel. com/. “Positioning Grant Writers For Success” - www. raise- “The Buck Starts Here” – Karen Markin, The Chronicle of “Know the Process, Improve Your Odds” – Brian Cobb and funds. com/040202 forum. html Higher Education, February 21, 2005. Stacy Abate, February 22, 2006. http: //charitychannel. com/. “Lessons in Evaluation: How Serving on Grant Panels Could Make You a Better Writer” – Jennifer Phelps, July 7, 2004, http: //charitychannel. com/. “Lets Ask for One Million Dollars or Why Successful Grantsmanship Isn’t Like Buckshot” – Katherine Felts, April 8, 2003, http: //charitychannel. com/. “Tips for New Grant Writers” – Shelly Uva, March 12, 2002, http: //charitychannel. com/

 Helpful Websites Oklahoma State Regents for Higher Education - www. okhighered. org/grantopps/ NCURA

Helpful Websites Oklahoma State Regents for Higher Education - www. okhighered. org/grantopps/ NCURA You. Tube - http: //www. youtube. com/user/NCURA 1959 Training Videos http: //www. onenet. net/ops/streaming/brown_bag_index. html You. Tube - Grant Writing -http: //www. youtube. com/ The Art of Grantsmanship - http: //www. hfsp. org/how/Artof. Grants. htm The EPA Grant Writing Tutorial http: //www. epa. gov/seahome/grants/src/msieopen. htm Writing Winning Proposals, the US Department of Energy http: //www. leeric. lsu. edu/sample. pdf Association of Fundraising Professionals - http: //www. afpnet. org/ National Science Foundation – http: //www. nsf. gov The Foundation Center - http: //fdncenter. org/ SRA International – Grants Web http: //www. srainternational. org/sra 03/grantsweb/

Blogs and Twitters Dr. Steven G. Johnson, Interim Vice President for Research and Economic

Blogs and Twitters Dr. Steven G. Johnson, Interim Vice President for Research and Economic Development, University of New Orleans http: //orsp. uno. edu/dblog/ Researchers’ Blog: How to Succeed in Academe http: //aclinks. wordpress. com/ Wordpress – Blogs about: Grantsmanship http: //en. wordpress. com/tag/grantsmanship/ Oregon Health and Science University: Research News http: //www. ohsu. edu/blogs/researchnews/ NSF – NFS Update https: //service. govdelivery. com/accounts/USNSF/subscriber/new NIH – Rock Talk - http: //nexus. od. nih. gov/all/rock-talk/