THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley MPSR Thermal-

THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley MPSR Thermal- 1 UCB, Oct 26, 2006

Thermal Hardware Status Update MPSR Thermal- 2 UCB, Oct 26, 2006

Thermal Hardware Status Update MPSR Thermal- 2 UCB, Oct 26, 2006

Thermal Hardware Status Update MPSR Thermal- 3 UCB, Oct 26, 2006

Thermal Hardware Status Update MPSR Thermal- 3 UCB, Oct 26, 2006

Thermal Modeling Status • Second Model Correlation Complete • • All boxes within 5

Thermal Modeling Status • Second Model Correlation Complete • • All boxes within 5 degrees of test temperatures Thermostat set points verified … except: – – • • • MPSR IDPU and BAU Primary and Secondary IRU Primary and Secondary was verified on P 5 only Heater duty cycles less than 70% Flight Predicts for launch case are complete The remainder are currently running Thermal- 4 UCB, Oct 26, 2006

PFRs and RFAs • Five PFRs closed since PER • • • PFR-186: Thermal

PFRs and RFAs • Five PFRs closed since PER • • • PFR-186: Thermal Blanket Velcro Adhesion Failure PFR-205: Fuel Line Zone #1 Secondary Thermostat to Low PFR-215: F 3 XPNDR Secondary Setpoints the Same as Primary PFR-225: F 3 MSSS Primary and Secondary service switched PFR-226: P 1 Thermistors BTMPRCSLN 1 and BTMPRCSSVC swapped • RFAs • P 3_PSR_4: Periodic Emissivity Measurements, closed • P 1_PSR_2: Transponder Radiator Resizing, submitted • P 1_PSR_3: Test Versus Flight Radiator Heat Flow Comparison, closed • P 1_PSR_4: Comparison of Pre-test Flight Predicts to Correlated Model, submitted MPSR Thermal- 5 UCB, Oct 26, 2006

Test Facilities Testing took place in JPL chamber #7 • 74”x 134” • Simultaneously

Test Facilities Testing took place in JPL chamber #7 • 74”x 134” • Simultaneously accommodated two Themis probes for testing with chamber divider shroud • Gaseous or liquid nitrogen controlled shrouds • GN 2: – 130 to +125 deg C • LN 2: -175 deg C • • MPSR Two TQCMs Nitrogen Vent-back is rate limited 30 power Supplies 168 Type T thermocouple feedthroughs 250 Channel DAQ system 1000 L/sec Leybold and 2000 L/sec Balser Turbo pumps Tank cleanliness certified prior to T-V test Thermal- 6 UCB, Oct 26, 2006

TVAC Flow for P 2 MPSR Thermal- 7 UCB, Oct 26, 2006

TVAC Flow for P 2 MPSR Thermal- 7 UCB, Oct 26, 2006

TVAC Flow for P 1, P 3, P 4, and P 5 MPSR Thermal-

TVAC Flow for P 1, P 3, P 4, and P 5 MPSR Thermal- 8 UCB, Oct 26, 2006

Thermal Vac Configuration P 2 Hot Balance #1 MPSR Thermal- 9 UCB, Oct 26,

Thermal Vac Configuration P 2 Hot Balance #1 MPSR Thermal- 9 UCB, Oct 26, 2006

Thermal Vac Configuration P 1, P 3 -5 Cold Balance #3 MPSR Thermal- 10

Thermal Vac Configuration P 1, P 3 -5 Cold Balance #3 MPSR Thermal- 10 UCB, Oct 26, 2006

TVAC #2 Setup MPSR Thermal- 11 UCB, Oct 26, 2006

TVAC #2 Setup MPSR Thermal- 11 UCB, Oct 26, 2006

TVAC #2 Setup MPSR Thermal- 12 UCB, Oct 26, 2006

TVAC #2 Setup MPSR Thermal- 12 UCB, Oct 26, 2006

TVAC #2 Setup MPSR Thermal- 13 UCB, Oct 26, 2006

TVAC #2 Setup MPSR Thermal- 13 UCB, Oct 26, 2006

Test Heaters • 12 test heaters provided for each thermal box • 1 heater

Test Heaters • 12 test heaters provided for each thermal box • 1 heater for the Antenna Hat Coupler • 1 Heater for the Separation Ring • 1 heater for controlling the beam warm up MPSR Thermal- 14 UCB, Oct 26, 2006

Instrumentation • 168 T-type thermocouples used on P 2 • 80 T-type thermocouples used

Instrumentation • 168 T-type thermocouples used on P 2 • 80 T-type thermocouples used on P 1, P 3 -5 • 64 x 2 used on the spacecraft • 16 x 2 used for heaters and environment • Transponder fully instrumented • Added thermocouples to the RCS system on P 3 MPSR Thermal- 15 UCB, Oct 26, 2006

P 2 TVAC Results After 1 st Correlation MPSR Thermal- 16 UCB, Oct 26,

P 2 TVAC Results After 1 st Correlation MPSR Thermal- 16 UCB, Oct 26, 2006

TVAC Hot Balance Results Before 2 nd Correlation MPSR Thermal- 17 UCB, Oct 26,

TVAC Hot Balance Results Before 2 nd Correlation MPSR Thermal- 17 UCB, Oct 26, 2006

TVAC Cold Balance Results Before 2 nd Correlation MPSR Thermal- 18 UCB, Oct 26,

TVAC Cold Balance Results Before 2 nd Correlation MPSR Thermal- 18 UCB, Oct 26, 2006

Combined Probe Correlation Changes MPSR Thermal- 19 UCB, Oct 26, 2006

Combined Probe Correlation Changes MPSR Thermal- 19 UCB, Oct 26, 2006

Combined RCS Correlation Changes MPSR Thermal- 20 UCB, Oct 26, 2006

Combined RCS Correlation Changes MPSR Thermal- 20 UCB, Oct 26, 2006

Other Changes • Increased transponder radiator size by 30% to match hardware modifications •

Other Changes • Increased transponder radiator size by 30% to match hardware modifications • Heater power applied as a function of bus voltage • Added heat leak from sun sensor to thermal box corner panel • Ran two separate cold balance cases to account for different top plate temperatures in actual test • Moved several Thermostat node locations to better reflect as installation photographs • Added Thermostat masses on RCS Fuel Lines Heater Zones (12 grams per TSTAT) • Removed Line 1 heater service from service valve TSTAT node MPSR Thermal- 21 UCB, Oct 26, 2006

TVAC Hot Balance Results After 2 nd Correlation MPSR Thermal- 22 UCB, Oct 26,

TVAC Hot Balance Results After 2 nd Correlation MPSR Thermal- 22 UCB, Oct 26, 2006

TVAC Cold Balance Results After 2 nd Correlation MPSR Thermal- 23 UCB, Oct 26,

TVAC Cold Balance Results After 2 nd Correlation MPSR Thermal- 23 UCB, Oct 26, 2006

Test Heater Power Summary MPSR Thermal- 24 UCB, Oct 26, 2006

Test Heater Power Summary MPSR Thermal- 24 UCB, Oct 26, 2006

Anomalies During Test TVAC 1 • PFR-205, Closed: Fuel Line Zone #1 Secondary Thermostat

Anomalies During Test TVAC 1 • PFR-205, Closed: Fuel Line Zone #1 Secondary Thermostat to Low • Heat leak to bottom deck caused TSTAT to appear to be tripping at a low temperature when it was functioning normally. However this exposed a real cold spot in the RCS fuel line 1. Fly As Is. Only presents a problem in long eclipses when the primary heater service has also failed. TVAC 2 and 3 • • • PFR-215, Closed: F 3 Transponder Secondary Setpoints the Same as Primary • Fly As Is PFR-225, Closed: F 3 MSSS Primary and Secondary service switched • Fly As Is PFR-226, Closed: P 1 Thermistors BTMPRCSLN 1 and BTMPRCSSVC swapped • Database Updated to swap mnemonics MPSR Thermal- 25 UCB, Oct 26, 2006

THERMAL BACKUP SLIDES MPSR Thermal- 26 UCB, Oct 26, 2006

THERMAL BACKUP SLIDES MPSR Thermal- 26 UCB, Oct 26, 2006

Thermal Testing History MPSR Thermal- 27 UCB, Oct 26, 2006

Thermal Testing History MPSR Thermal- 27 UCB, Oct 26, 2006

Thermal Cycle Accumulation Individual Instrument TVAC (2 Cycles) Instrument Suite TVAC (6 Cycles) Probe

Thermal Cycle Accumulation Individual Instrument TVAC (2 Cycles) Instrument Suite TVAC (6 Cycles) Probe Level TVAC (4 Cycles, 3 Balance Points) Individual Probe Component TVAC (8 Cycles) MPSR Thermal- 28 UCB, Oct 26, 2006

Thermal Vac Testing History Instruments MPSR Thermal- 29 UCB, Oct 26, 2006

Thermal Vac Testing History Instruments MPSR Thermal- 29 UCB, Oct 26, 2006

Thermal Vac Testing History Instruments MPSR Thermal- 30 UCB, Oct 26, 2006

Thermal Vac Testing History Instruments MPSR Thermal- 30 UCB, Oct 26, 2006

Thermal Vac Testing History Suite and IDPU MPSR Thermal- 31 UCB, Oct 26, 2006

Thermal Vac Testing History Suite and IDPU MPSR Thermal- 31 UCB, Oct 26, 2006

Thermal Vac Testing History Mag Booms MPSR Thermal- 32 UCB, Oct 26, 2006

Thermal Vac Testing History Mag Booms MPSR Thermal- 32 UCB, Oct 26, 2006

Thermal Vac Testing History SPB MPSR Thermal- 33 UCB, Oct 26, 2006

Thermal Vac Testing History SPB MPSR Thermal- 33 UCB, Oct 26, 2006

Thermal Vac Testing History AXB MPSR Thermal- 34 UCB, Oct 26, 2006

Thermal Vac Testing History AXB MPSR Thermal- 34 UCB, Oct 26, 2006

Thermal Vac Testing History Probe Components MPSR Thermal- 35 UCB, Oct 26, 2006

Thermal Vac Testing History Probe Components MPSR Thermal- 35 UCB, Oct 26, 2006

Post TVAC 1 Correlation Changes and Data MPSR Thermal- 36 UCB, Oct 26, 2006

Post TVAC 1 Correlation Changes and Data MPSR Thermal- 36 UCB, Oct 26, 2006

P 2 TVAC Results Before Correlation • Comparison of the test data with test

P 2 TVAC Results Before Correlation • Comparison of the test data with test predicts show most components are within 5°C of test predicts for Hot and Cold Balance Cases • The Survival Balance Case (Cold 2) results indicate that the model is conservative on the cold side which means that flight heater powers will be less than predicted. MPSR Thermal- 37 UCB, Oct 26, 2006

Correlated Interface Conductances MPSR Thermal- 38 UCB, Oct 26, 2006

Correlated Interface Conductances MPSR Thermal- 38 UCB, Oct 26, 2006

Correlated Blanket e* MPSR Thermal- 39 UCB, Oct 26, 2006

Correlated Blanket e* MPSR Thermal- 39 UCB, Oct 26, 2006

Correlated Thermostat Set Points MPSR Thermal- 40 UCB, Oct 26, 2006

Correlated Thermostat Set Points MPSR Thermal- 40 UCB, Oct 26, 2006

Other Changes • Added Thermostat masses on RCS Fuel Lines Heater Zones (12 grams

Other Changes • Added Thermostat masses on RCS Fuel Lines Heater Zones (12 grams per TSTAT) • RCS Max Heater Power multiplied by 1. 375 (Accounts for 33 V Bus instead of 24 V) • Adjusted RCS Latch Valve, P-Ducer and Solenoid Valve MCp values to account for single node model (FAC 0. 2). • Adjusted Sun Sensor outer face emissivity from 0. 2 to 0. 8 (accounts for black anodized Baffles) MPSR Thermal- 41 UCB, Oct 26, 2006

P 2 TVAC Results After Correlation MPSR Thermal- 42 UCB, Oct 26, 2006

P 2 TVAC Results After Correlation MPSR Thermal- 42 UCB, Oct 26, 2006