Outline • Summary of SST Status at FM 1 PSR • FM 1 -5

Outline • Summary of SST Status at FM 1 PSR • FM 1 -5 Configuration by SN • End-Item Data Package • Final Test and Cal Results vs. Requirement Fulfillment • Open Items FM 4/FM 5 IPSR SST 2 UCB, May 5 th, 2006

Status Current SST-DAP Status: FM 1 - Delivered FM 2 - Delivered FM 3

Status Current SST-DAP Status: FM 1 - Delivered FM 2 - Delivered FM 3 - Delivered FM 4 - Delivered FM 5 - Delivered FM 6 - Delivered (Needs memory test following conformal coating) FM 4/FM 5 IPSR SST 3 UCB, May 5 th, 2006

Status Current SST-Sensor Status: FM 1 – (S 01 & S 02) Delivered FM

Status Current SST-Sensor Status: FM 1 – (S 01 & S 02) Delivered FM 2 - (S 06 & S 04) Delivered FM 3 - (S 05 & S 10) Delivered FM 4 - (S 07 & S 09) Delivered FM 5 - (S 11 & S 12) Complete, Calibrated, awaiting delivery. FM 6 - (S 03 & S 08) Refurbished, requires workmanship vibe. FM 4/FM 5 IPSR SST 4 UCB, May 5 th, 2006

Flight Configuration • Current flight configuration of sensors and DAPs for all flight units.

Flight Configuration • Current flight configuration of sensors and DAPs for all flight units. FM 4/FM 5 IPSR SST 5 UCB, May 5 th, 2006

FM 1 EIDP: Sensors • THEMIS SST Sensor: (Sensor 1: Binder #33; Sensor 2:

FM 1 EIDP: Sensors • THEMIS SST Sensor: (Sensor 1: Binder #33; Sensor 2: Binder #34) • Electrical Assembly • Schematics • Electrical Assembly Records • Rework/Repair history • Electrical test results • QA signoffs • Mechanical Assembly • Mechanical drawings • Vibration test results • Thermal Vac test results • Assembly Records. • Special TVAC Acceptance Test Data. FM 4/FM 5 IPSR SST 6 UCB, May 5 th, 2006

FM 1 EIDP: DAP • THEMIS SST DAP: (Binder#2) • Schematics • Electrical Assembly

FM 1 EIDP: DAP • THEMIS SST DAP: (Binder#2) • Schematics • Electrical Assembly Records • Rework/Repair history • Electrical test results • QA signoffs FM 4/FM 5 IPSR SST 7 UCB, May 5 th, 2006

SST Vibration Testing (Pictures of Probe 2 units) FM 4/FM 5 IPSR SST 8

SST Vibration Testing (Pictures of Probe 2 units) FM 4/FM 5 IPSR SST 8 UCB, May 5 th, 2006

SST Acceptance Level Dynamic Test SST Serial Number Test Date Following Initial Build Retest

SST Acceptance Level Dynamic Test SST Serial Number Test Date Following Initial Build Retest Date (Rework/Redesign) 13 Jan 05 Oct 11, 2005 (full-qual) 22 Apr 05 Nov 4, 2005 (workmanship) June 13, 2005 Nov 4, 2005 (workmanship) May 6 2005 Nov 7, 2005 (workmanship) Nov 7 2005 Not needed Dec 13 2005 Not needed 001, 002 003, 004 006, 008 007, 009 011, 012 005, 010 FM 4/FM 5 IPSR SST 9 UCB, May 5 th, 2006

SST Acceptance Level Dynamic Test Per UCB THEMIS Document THM-SST-PRC-002 • • • All

SST Acceptance Level Dynamic Test Per UCB THEMIS Document THM-SST-PRC-002 • • • All 3 Axes Sine Survey, 0. 5 G, 5 – 2000 Hz Sine Strength per Swales TM 2430 -Rev. D, 29 November 2004 Random – Per Swales Document TM 2430 -Rev. D – 12. 51 G RMS – 1 min duration per axis All Vibration Testing Performed at Quanta Laboratories Retesting (if required) • • ‘Workmanship Shake’ – Validate any design changes following original Flight build shake – Validate rework of any failures on previous vibration test Entire vibration protocol, single axis only Acceptance Sine Strength Specification FM 4/FM 5 IPSR SST Flight Unit SST 10 Acceptance Level Random Specification UCB, May 5 th, 2006

SST TVAC Testing SST Serial Number Test Date Following Initial Build Retest Date (Rework/Redesign)

SST TVAC Testing SST Serial Number Test Date Following Initial Build Retest Date (Rework/Redesign) 5 Jan 05 Not needed 28 Apr 05 Not needed Sept 7, 2005 Dec-3 -2005 (sensor 6 only) May 25, 2005 not needed Dec 3 2005 not needed Dec 20, 2005 to Jan 11, 2006 (8 cycles) not needed 001, 002 003, 004 006, 008 007, 009 011, 012 005, 010 FM 4/FM 5 IPSR SST 11 UCB, May 5 th, 2006

Thermal Profile Procedure: THM-SST-PRC-003 FM 4/FM 5 IPSR SST 12 UCB, May 5 th,

Thermal Profile Procedure: THM-SST-PRC-003 FM 4/FM 5 IPSR SST 12 UCB, May 5 th, 2006

SST -Magnetic cleanliness SST Magnetic Cleanliness Testing Status • All units have been tested

SST -Magnetic cleanliness SST Magnetic Cleanliness Testing Status • All units have been tested and are nominal. FM 4/FM 5 IPSR SST 13 UCB, May 5 th, 2006

SST -Magnetic cleanliness SST Sensor 07 • All units have been tested and are

SST -Magnetic cleanliness SST Sensor 07 • All units have been tested and are nominal. FM 4/FM 5 IPSR SST 14 UCB, May 5 th, 2006

SST -Magnetic cleanliness SST Sensor 09 FM 4/FM 5 IPSR SST 15 UCB, May

SST -Magnetic cleanliness SST Sensor 09 FM 4/FM 5 IPSR SST 15 UCB, May 5 th, 2006

SST -Magnetic cleanliness SST Sensor 11 FM 4/FM 5 IPSR SST 16 UCB, May

SST -Magnetic cleanliness SST Sensor 11 FM 4/FM 5 IPSR SST 16 UCB, May 5 th, 2006

SST -Magnetic cleanliness SST Sensor 12 FM 4/FM 5 IPSR SST 17 UCB, May

SST -Magnetic cleanliness SST Sensor 12 FM 4/FM 5 IPSR SST 17 UCB, May 5 th, 2006

SST Requirements SST Mission Requirements Fulfillment: • FM 1 MR fulfillment noted in THEMIS

SST Requirements SST Mission Requirements Fulfillment: • FM 1 MR fulfillment noted in THEMIS Verification Matrix (see MSE Presentation) • Integrated SST and component parts compliant with mission requirements FM 4/FM 5 IPSR SST 18 UCB, May 5 th, 2006

Open PFRs None FM 4/FM 5 IPSR SST 19 UCB, May 5 th, 2006

Open PFRs None FM 4/FM 5 IPSR SST 19 UCB, May 5 th, 2006

Recent PFRs PFR 169 • Found poor ion energy response in 2 sensors. (S

Recent PFRs PFR 169 • Found poor ion energy response in 2 sensors. (S 03 and S 08). Found only in sensors that had undergone electron testing. • Discovered that plasma discharges from the electron gun had inadvertently damaged adjacent ion detectors. (electron detectors where protected by foil that stopped all ions and never showed any damage. ) • Subsequent testing with the electron gun is done with the open (ion) detectors covered. Electron gun has also been refurbished. • Swapped affected sensors with spares (S 05 and S 10). • Replaced damaged open (ion) detectors in affected units. These are now the new spares. PFR is closed. FM 4/FM 5 IPSR SST 20 UCB, May 5 th, 2006

Results of Testing/Calibration • • Energy Threshold vs temperature measured and acceptable Energy resolution

Results of Testing/Calibration • • Energy Threshold vs temperature measured and acceptable Energy resolution acceptable (<13 ke. V at 5 C). Detector gain measured and is stable over temperature. Channel crosstalk measured and acceptable (<20 ke. V) Attenuator functions over full operational Temp range. Heater/Thermostat Functional at < -50 C *! Magnetic moments measured and deemed acceptable. End to End performance verified. • (*!) Noise susceptibility from BAU is very low now FM 4/FM 5 IPSR SST 21 UCB, May 5 th, 2006