Project Integration Management PMP Study Group Project Integration

  • Slides: 70
Download presentation
Project Integration Management PMP Study Group Project Integration Management PMP Prep Course – Project

Project Integration Management PMP Study Group Project Integration Management PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management Definition A subset of project management that includes: “The processes and

Project Integration Management Definition A subset of project management that includes: “The processes and activities needed to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups. ” PMBo. K® Guide, 4 th Edition, p. 71 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 2

Project Integration Management is. . . Primarily concerned with effectively integrating the processes among

Project Integration Management is. . . Primarily concerned with effectively integrating the processes among the Project Management Process Groups that are required to accomplish project objectives within an organization’s defined procedures. PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 3

Project Integration Management Processes 4. 1 Develop Project Charter 4. 2 Develop Project Management

Project Integration Management Processes 4. 1 Develop Project Charter 4. 2 Develop Project Management Plan 4. 3 Direct and Manage Project Execution 4. 4 Monitor and Control Project Work 4. 5 Perform Integrated Change Control 4. 6 Close Project or Phase PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 4

Project Integration Management Develop Project Charter Process Project Management Process Groups Knowledge Area Initiating

Project Integration Management Develop Project Charter Process Project Management Process Groups Knowledge Area Initiating 4. Project Scope Management 4. 1 Develop Project Charter Planning 4. 2 Develop Project Management Plan Executing 4. 3 Direct and Manage Project Execution Monitoring & Controlling 4. 4 Monitor and Control Project Work 4. 5 Perform Integrated Change Control Closing 4. 6 Close Project or Phase Across Project Management Process Groups PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 1 Develop Project Charter Definition: “The process of developing a

Project Integration Management 4. 1 Develop Project Charter Definition: “The process of developing a document that formally authorizes a project or a phase and documenting initial requirements that satisfy the stakeholder’s needs and expectations. ” PMBo. K® Guide, 4 th Edition, p. 71 PMBo. K® Guide, 4 th Edition, p. 74 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 6

Project Integration Management 4. 1. 1 Develop Project Charter Inputs Project 4. 1. 1.

Project Integration Management 4. 1. 1 Develop Project Charter Inputs Project 4. 1. 1. 1 Statement of Work A narrative description of product or services to be supplied by the project: • • • 4. 1. 1. 2 Business Case Business need Product scope description Strategic plan The facts that determine whether the project is worth the investment to achieve the project objective(s): Used to justify spending organizational assets (resources, time, money, etc. ) Used to select projects from among a list of potential projects 4. 1. 1. 3 Contract A contract from the customer’s acquiring organization is an input if the project is being done for an external customer PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 1. 1 Develop Project Charter Inputs Enterprise 4. 1. 1.

Project Integration Management 4. 1. 1 Develop Project Charter Inputs Enterprise 4. 1. 1. 4 Environmental Factors 4. 1. 1. 5 Organizational Process Assets External and internal environmental factors that influence the project: Government or industry standards Organization infrastructure Marketplace conditions Process related assets (such as plans, policies, procedures and guidelines) that can be used for the project. The organization’s standard and established policies and procedures Document and report templates Historical information (including lessons learned) PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management Enterprise Environmental Factors - Example PMP Prep Course – Project Integration

Project Integration Management Enterprise Environmental Factors - Example PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 9

Project Integration Management Organizational Process Assets - Example PMP Prep Course – Project Integration

Project Integration Management Organizational Process Assets - Example PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 10

Project Integration Management Project Selection Methodologies Benefit Measurement Methods Constrained Optimization Methods Compare and

Project Integration Management Project Selection Methodologies Benefit Measurement Methods Constrained Optimization Methods Compare and contrast projects against each other Mathematically models the project outcomes • Murder Board Peer Review Scoring Models • • Constrained Optimization Models Linear Programming Integer Programming Economic Models: • Dynamic Programming Present Value and Net Present Value • Multi-objective programming • • Internal Rate of Return Payback Benefit Cost Ratio PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 1. 2 Develop Project Charter Tools and Techniques Expertise provided

Project Integration Management 4. 1. 2 Develop Project Charter Tools and Techniques Expertise provided by any group or individual with specialized knowledge or training: Expert 4. 1. 2. 1 Judgment Within the organization Consultants Professional associations and industry groups Subject matter experts (SME) Project Management Office (PMO) PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 1. 3 Develop Project Charter Outputs • • 4. 1.

Project Integration Management 4. 1. 3 Develop Project Charter Outputs • • 4. 1. 3. 1 Project Charter • Formally authorizes the project Provides the Project Manager with the authority to apply organizational resources to project activities The project charter is issued by the project sponsor: Sponsor can be an individual or a project portfolio steering committee or the Project Management Office The sponsor must have the authority to fund the project PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management The Project Charter addresses: Project purpose or justification Measurable objectives and

Project Integration Management The Project Charter addresses: Project purpose or justification Measurable objectives and success criteria High level requirements High level project description High level risks Summary milestone schedule Summary budget Business Needs • Market Demand • Business Need • Customer Request • Technological Advance • Legal Requirement • Social Need PMBo. K® Guide, 4 th Edition, p. 75 -76 Project approval requirements Assigned Project Manager Sponsor(s) of the project with authority level PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 14

Project Integration Management The Project Charter (cont’d) The project cannot be started without a

Project Integration Management The Project Charter (cont’d) The project cannot be started without a charter because the charter: Formally recognizes the existence of the project Gives the project manager the authority to spend money and commit resources. Provides the high level requirements and expectations Links the project to the organization’s ongoing work PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 15

Project Integration Management 4. 1 Develop Project Charter Miscellaneous Facts Who can issue the

Project Integration Management 4. 1 Develop Project Charter Miscellaneous Facts Who can issue the Project Charter? A project initiator or sponsor external to the project at an organizational level appropriate to funding the project. • What factors are projects taken to address? • • • Market demand Business need Customer request Technological advance Legal or regulatory requirement Social need PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 1 Develop Project Charter Terms • Assumptions • • Constraints

Project Integration Management 4. 1 Develop Project Charter Terms • Assumptions • • Constraints Opportunity Cost Sunk Cost Law of Diminishing Returns Working Capital • • Factors that limit the project team’s options to complete the project and produce the required deliverables The benefit ($$$$) lost by selecting another project • Money already spent that cannot be recovered • Sunk costs are not considered when deciding whether to continue an effort • • • Depreciation Factors that are considered to be true, real or certain without proof or demonstration. Assumptions need to be identified, documented and validated Part of progressive elaboration of the project • Productivity and resources are not linked in a 1: 1 relationship At some point adding resources does not yield a corresponding increase in productivity The funds available for use by an organization Calculated by subtracting current liabilities from current assets Accounts for the fact that assets lose value over time. Types of depreciation: Straight line Accelerated PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 1 Develop Project Charter Data Flow Diagram PMBo. K® Guide,

Project Integration Management 4. 1 Develop Project Charter Data Flow Diagram PMBo. K® Guide, 4 th Edition, p. 74 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 18

Project Integration Management Practice Question: Inputs for a Project Charter include all of the

Project Integration Management Practice Question: Inputs for a Project Charter include all of the following EXCEPT: A. Detailed schedule B. Product scope description C. Business need D. Strategic plan PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 19

Project Integration Management Develop Project Management Plan Process Project Management Process Groups Knowledge Area

Project Integration Management Develop Project Management Plan Process Project Management Process Groups Knowledge Area Initiating 4. Project Scope Management 4. 1 Develop Project Charter Planning 4. 2 Develop Project Management Plan Executing 4. 3 Direct and Manage Project Execution Monitoring & Controlling 4. 4 Monitor and Control Project Work 4. 5 Perform Integrated Change Control Closing 4. 6 Close Project or Phase Across Project Management Process Groups PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 2 Develop Project Management Plan Definition: “The process of documenting

Project Integration Management 4. 2 Develop Project Management Plan Definition: “The process of documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans. ” PMBo. K® Guide, 4 th Edition, p. 78 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 21

Project Integration Management 4. 2. 1 Develop Project Management Plan Inputs 4. 2. 1.

Project Integration Management 4. 2. 1 Develop Project Management Plan Inputs 4. 2. 1. 1 Project Charter See Section 4. 1. 3. 1 Outputs from 4. 2. 1. 2 Planning Processes • • Enterprise 4. 2. 1. 3 Environmental Factors • • • 4. 2. 1. 4 Organizational Process Assets • • • Government of industry standards Project Management Information System (PMIS) Organizational structure Organizational culture Existing infrastructure Personnel administration policies and guidelines Standardized guidelines, work instructions, proposal evaluation criteria, and performance measurement criteria Project management plan template Change control procedures Project files from previous projects PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 2. 2 Develop Project Management Plan Tools and Techniques 4.

Project Integration Management 4. 2. 2 Develop Project Management Plan Tools and Techniques 4. 2. 2. 1 Expert Judgment When developing the project management plan use expert judgment to: • Decide which processes are needed for the project and to what degree do they need to be applied • Determine resources needed and the level of involvement to complete the project work • Develop the technical details to be included in the plan PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 2. 3 Develop Project Management Plan Outputs Project 4. 2.

Project Integration Management 4. 2. 3 Develop Project Management Plan Outputs Project 4. 2. 3. 1 Management Plan Integrates and consolidates all of the subsidiary management plans and baselines from the planning processes. It documents the outputs of the subsidiary management plans. It includes: Project management processes selected by the project management team The level of implementation of each selected process The tools and techniques to be used to accomplish the selected processes How the selected processes will be used to manage the project How work will be executed to accomplish the project objectives How changes will be monitored and controlled How configuration management will be performed How integrity of performance baselines will be maintained and used The need and technique for communication among stakeholders The selected project life cycle and associated project phases Key management reviews for content, extent and timing PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management The Project Management Plan must have: Buy in form all stakeholders

Project Integration Management The Project Management Plan must have: Buy in form all stakeholders Approved (with signatures) Realistic Formal PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 25

Project Integration Management The Project Management Plan Projects are managed to baselines: Schedule Baseline

Project Integration Management The Project Management Plan Projects are managed to baselines: Schedule Baseline Cost Baseline Scope Baseline PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 26

Project Integration Management 4. 2 Develop Project Management Plan Terms Stakeholder Persons and organizations

Project Integration Management 4. 2 Develop Project Management Plan Terms Stakeholder Persons and organizations such as customers, sponsors, performing organizations and the public, that are actively involved in the project, or whose interests may be positively or negatively affected by execution or completion of the project. They may also exert influence over the project and its deliverables. Documents not part of the project management plan that are used to manage the project such as: Project Documents Project Charter Contracts Statement of Work Kickoff Meeting A meeting of all parties to the project (customers, sellers, project team, senior management, agencies, functional management, sponsor) to make certain everyone is familiar with the details of the project and the people working on the project. It is held at the end of the planning process group, just before beginning work on the project. PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 2 Develop Project Management Plan Data Flow Diagram PMBo. K®

Project Integration Management 4. 2 Develop Project Management Plan Data Flow Diagram PMBo. K® Guide, 4 th Edition, p. 79 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 28

Project Integration Management Practice Question: As Project Manager your concern is to ensure the

Project Integration Management Practice Question: As Project Manager your concern is to ensure the project management plan integrates the following: A. Subsidiary management plans B. Outputs from the PMBOK planning processes C. Life cycles selected and the processes applied to each phase until project closure D. All of the above PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 29

Project Integration Management Direct and Manage Project Execution Process Project Management Process Groups Knowledge

Project Integration Management Direct and Manage Project Execution Process Project Management Process Groups Knowledge Area Initiating 4. Project Scope Management 4. 1 Develop Project Charter Planning 4. 2 Develop Project Management Plan Executing 4. 3 Direct and Manage Project Execution Monitoring & Controlling 4. 4 Monitor and Control Project Work 4. 5 Perform Integrated Change Control Closing 4. 6 Close Project or Phase Across Project Management Process Groups PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 3 Direct and Manage Project Execution Definition: “The process of

Project Integration Management 4. 3 Direct and Manage Project Execution Definition: “The process of performing the work defined in the project management plan to achieve the project’s objectives” PMBo. K® Guide, 4 th Edition, p. 83 PMBo. K® Guide, 4 th Edition, p. 84 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 31

Project Integration Management 4. 3 Direct and Manage Project Execution Directing and managing project

Project Integration Management 4. 3 Direct and Manage Project Execution Directing and managing project execution involves: Performing activities to accomplish project requirements Creating project deliverables Staffing, training and managing project team members Obtaining, managing, and using resources (materials, tools, equipment and facilities) Implementing the planned methods and standards Establish and manage project communication channels (external and internal) Generate project data (cost, schedule, progress and status) Issue change requests and adapt approved changes into the project Manage risk and implement risk response activities Manage sellers and suppliers Collect and document lessons learned Implement process improvements PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 32

Project Integration Management 4. 3 Direct and Manage Project Execution Directing and managing project

Project Integration Management 4. 3 Direct and Manage Project Execution Directing and managing project execution involves: (continued) Managing sellers and suppliers Adapting approved changes into the project’s scope, plans and environment Establishing and managing project communication channels, both external and internal to the project team Collecting project data and reporting cost, schedule, technical and quality progress, and status information to facilitate forecasting Collecting and documenting lessons learned Implementing approved process improvement activities PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 33

Project Integration Management 4. 3. 1 Direct and Manage Project Execution Inputs Project 4.

Project Integration Management 4. 3. 1 Direct and Manage Project Execution Inputs Project 4. 3. 1. 1 Management Plan Approved 4. 3. 1. 2 Change Requests Enterprise 4. 3. 1. 3 Environmental Factors 4. 3. 1. 4 Organizational Process Assets See Section 4. 1. 3. 1 • Corrective Actions • Preventive Actions Defect Repairs • Organizational, company or customer culture and structure • Existing infrastructure • • Personnel administration policies and guidelines Stakeholder risk tolerances Project Management Information System (PMIS) • Standardized guidelines and work instructions • Communication requirements and policies • • • Issue and defect management procedures Process measurement database Files and information from previous projects Issue and defect management database PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 3. 2 Direct and Manage Project Execution Tools and Techniques

Project Integration Management 4. 3. 2 Direct and Manage Project Execution Tools and Techniques 4. 3. 2. 1 Expert Judgment Project Management 4. 3. 2. 2 Information System (PMIS) Previously defined PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 3. 3 Direct and Manage Project Execution Outputs 4. 3.

Project Integration Management 4. 3. 3 Direct and Manage Project Execution Outputs 4. 3. 3. 1 Deliverables Information on the status of project activities being performed to accomplish the project work. This typically includes, but is not limited to, the following: Schedule progress showing status information Work 4. 3. 3. 2 Performance Information: Deliverables that have been completed and those not completed Schedule activities that have started and those that have been finished Extent to which quality standards are being met Costs authorized and incurred Estimates to complete the schedule activities that have started Percent physically complete of the in-progress schedule activities Documented lessons learned posted to the lessons learned knowledge base Resource utilization detail PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 3. 3 Direct and Manage Project Execution Outputs (cont’d) •

Project Integration Management 4. 3. 3 Direct and Manage Project Execution Outputs (cont’d) • 4. 3. 3. 3 Change Requests Project 4. 3. 3. 4 Management Plan Updates Project 4. 3. 3. 5 Document Updates • Corrective Action Preventive Action • Defect Repair Documentation Updates • Subsidiary project plans • Requirements • • • Stakeholder List Risks Register PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 3 Direct and Manage Project Execution Terms Corrective Action An

Project Integration Management 4. 3 Direct and Manage Project Execution Terms Corrective Action An action to bring expected future project performance into conformance with the project management plan Preventive Action An action to reduce the probability of negative consequences associated with project risks Defect An imperfection or deficiency in a project component where that component does not meet its requirements or specifications and needs to be either repaired or replaced. Defect Repair An imperfection or deficiency in a project component where that component does not meet its requirements or specifications and needs to be either repaired or replaced. Lessons Learned The learning gained from the process of performing the project. Also considered a project record to be included in the lessons learned knowledge base. PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 3 Direct and Manage Project Execution Terms An estimate, expressed

Project Integration Management 4. 3 Direct and Manage Project Execution Terms An estimate, expressed as a percent, of the amount of work that has been completed on an activity or a work breakdown component. Percent Complete 50/50 Rule: Task is 50% complete when it starts and gets credit for the remaining 50% upon completion 20/80 Rule: Task is 20% complete when it starts and gets credit for the remaining 80% upon completion 0/100 Rule: A task does not get credit for partial completion, only full completion Deliverable A unique and verifiable product, result or capability to perform a service that must be produced to complete a process, phase or project. PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management Practice Question: As the Project Manager for Go Green Airlines you

Project Integration Management Practice Question: As the Project Manager for Go Green Airlines you know that you need to manage Project Execution. Which is the best response to, define Direct and Manage Project Execution? A. Project Charter B. Quality Management Plan C. Perform activities to accomplish project requirements D. Managing people doing the work and implementing approved changes PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 40

Project Integration Management 4. 3 Direct and Manage Project Execution Data Flow Diagram PMBo.

Project Integration Management 4. 3 Direct and Manage Project Execution Data Flow Diagram PMBo. K® Guide, 4 th Edition, p. 84 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 41

Project Integration Management Monitor and Control Project Work Process Project Management Process Groups Knowledge

Project Integration Management Monitor and Control Project Work Process Project Management Process Groups Knowledge Area Initiating 4. Project Scope Management 4. 1 Develop Project Charter Planning 4. 2 Develop Project Management Plan Executing 4. 3 Direct and Manage Project Execution Monitoring & Controlling 4. 4 Monitor and Control Project Work 4. 5 Perform Integrated Change Control Closing 4. 6 Close Project or Phase Across Project Management Process Groups PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 4 Monitor and Control Project Work Definition: “The process of

Project Integration Management 4. 4 Monitor and Control Project Work Definition: “The process of tracking, reviewing, and regulating the progress to the meet the performance objectives defined in the project management plan. ” PMBo. K® Guide, 4 th Edition, p. 89 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 43

Project Integration Management 4. 4. 1 Monitor and Control Project Work Inputs 4. 4.

Project Integration Management 4. 4. 1 Monitor and Control Project Work Inputs 4. 4. 1. 1 Project Management Plan 4. 4. 1. 2 Performance Reports • Enterprise 4. 4. 1. 3 Environmental Factors • • • 4. 4. 1. 4 Organizational Process Assets • • Government or industry standards Company work authorization system Stakeholder risk tolerances Project Management Information Systems Organization communication requirements Financial controls procedures Issue and defect management procedures Risk control procedures Process measurement database Lessons learned database PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 4. 2 Monitor and Control Project Work Tools and Techniques

Project Integration Management 4. 4. 2 Monitor and Control Project Work Tools and Techniques 4. 4. 2. 1 Expert Judgment Previously defined PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 4. 3 Monitor and Control Project Work Outputs • 4.

Project Integration Management 4. 4. 3 Monitor and Control Project Work Outputs • 4. 4. 3. 1 Change Requests • • • 4. 4. 3. 2 Project Management Plan Updates Project Document 4. 4. 3. 3 Updates • Corrective action Preventive action Defect repair Schedule Management Plan Cost Management Plan • Quality Management Plan Baselines: Scope, Schedule, Cost • Forecasts • • • Performance Reports Issues log PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 4 Monitor and Control Project Work Terms A management methodology

Project Integration Management 4. 4 Monitor and Control Project Work Terms A management methodology for integrating scope, schedule and resources and for objectively measuring project performance and progress: Earned Value Management Performance is measured by determining the budgeted cost of work performed (the earned value) and comparing it to the actual cost of worked performed (the actual cost) Progress is measured by comparing the earned value to the planned value • Performance Measurement Baseline • An approved plan for the project work against which project execution is compared and deviations are measured for management control. The project measurement baseline typically integrates scope, schedule, and cost parameters of a project, but may also include technical and quality parameters. The project baseline may be changed by formally approved changes PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management Practice Question: If a Project Manager is concerned with the process

Project Integration Management Practice Question: If a Project Manager is concerned with the process of tracking, reviewing and regulating the progress to meet performance objectives as defined in the project management plan, which should she/he concentrate on: A. Communication plan B. Continuous monitoring C. Project management information system D. Scope management plan PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 48

Project Integration Management 4. 4 Monitor and Control Project Work Data Flow Diagram PMBo.

Project Integration Management 4. 4 Monitor and Control Project Work Data Flow Diagram PMBo. K® Guide, 4 th Edition, p. 90 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 49

Project Integration Management Perform Integrated Change Control Process Project Management Process Groups Knowledge Area

Project Integration Management Perform Integrated Change Control Process Project Management Process Groups Knowledge Area Initiating 4. Project Scope Management Planning 4. 1 Develop Project Charter 4. 2 Develop Project Management Plan Executing 4. 3 Direct and Manage Project Execution Monitoring & Controlling 4. 4 Monitor and Control Project Work 4. 5 Perform Integrated Change Control Closing 4. 6 Close Project or Phase Across Project Management Process Groups PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 5 Perform Integrated Change Control Definition: “The process of reviewing

Project Integration Management 4. 5 Perform Integrated Change Control Definition: “The process of reviewing all change requests, approving changes, and managing changes to the deliverables, organizational process assets, project documents, and the project management plan. ” PMBo. K® Guide, 4 th Edition, p. 93 PMBo. K® Guide, 4 th Edition, p. 95 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 51

Project Integration Management 4. 5 Perform Integrated Change Control includes the following: Identifying that

Project Integration Management 4. 5 Perform Integrated Change Control includes the following: Identifying that a change needs to occur or has occurred Influencing the factors that circumvent integrated change control so that only approved changes are implemented Reviewing, analyzing and approving requested changes Managing the approved changes by regulating the flow of requested changes Maintaining the integrity of baselines by releasing only approved changes Reviewing and approving all recommended corrective and preventive actions Controlling and updating the scope, cost, budget, schedule, and quality requirements based on approved changes Documenting the impact of requested changes Validating defect repair Controlling project quality to standards based on quality reports PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 52

Project Integration Management 4. 5 Perform Integrated Change Control The Project Manager should be

Project Integration Management 4. 5 Perform Integrated Change Control The Project Manager should be concerned with: Ensuring the change is beneficial Determining if change is needed Looking for alternatives to change Minimizing the negative impact of change Notifying stakeholders affected by the change PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 53

Project Integration Management 4. 5. 1 Perform Integrated Change Control Inputs 4. 5. 1.

Project Integration Management 4. 5. 1 Perform Integrated Change Control Inputs 4. 5. 1. 1 Project Management Plan 4. 5. 1. 2 Work Performance Information 4. 5. 1. 3 Change Requests Enterprise 4. 5. 1. 4 Environmental Factors • • Organizational 4. 5. 1. 5 Process Assets • • Project Management Information System Change control procedures Change approval and authorization procedures Process measurement database Project files Configuration management knowledge base PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 5. 2 Perform Integrated Change Control Tools and Techniques 4.

Project Integration Management 4. 5. 2 Perform Integrated Change Control Tools and Techniques 4. 5. 2. 1 Expert Judgment Previously defined Change Control Board • 4. 5. 2. 2 Change Control Meetings • • Roles and responsibilities defined in the change control procedures Membership on the board will include major stakeholders The customer may be included for projects being done under contract Reviews change requests Approves or rejects change requests PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management Who can approve changes? Change to Project Charter Project Sponsor who

Project Integration Management Who can approve changes? Change to Project Charter Project Sponsor who signed/approved the Project Charter. The Project Manager can provide input. Changes to Project Baselines or any Constraints The Change Control Board or Sponsor needs to be involved. The Project Manager can recommend options. Changes within the Project Plan Project Manager can make the change if the change is within the Project Manager’s authority and does not require changes to any project baselines. PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 56

Project Integration Management The Steps for Making Changes Evaluate for impact on the Project

Project Integration Management The Steps for Making Changes Evaluate for impact on the Project Constraints: Evaluate impact Create Options Get internal buy in Get customer buy in (if necessary) Change approved or rejected • Scope • Quality • Schedule • Budget • Resources • Risk Adjust project management plan and baselines Notify stakeholders affected by change Manage project to the new project management plan and baseline PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 57

Project Integration Management 4. 5. 3 Perform Integrated Change Control Outputs • Approved Change

Project Integration Management 4. 5. 3 Perform Integrated Change Control Outputs • Approved Change Requests Corrective Actions 4. 5. 3. 1 Change Request Status Updates • • 4. 5. 3. 2 Project Management Plan Updates 4. 5. 3. 3 Project Document Updates Preventive Actions Defect Repair Rejected Change Requests Validated Defect Repair Approved Change Requests are INPUTS for Directing and Managing Project Execution PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management Configuration Management A documented procedure used to apply technical and administrative

Project Integration Management Configuration Management A documented procedure used to apply technical and administrative direction and surveillance to: Identify and document the functional and physical characteristics of an item or system Control any changes to such characteristics Record and report the change and its implementation status Audit the items and system to verify conformance to requirements PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 59

Project Integration Management 4. 4 Perform Integrated Change Control Terms Configuration Identification Providing the

Project Integration Management 4. 4 Perform Integrated Change Control Terms Configuration Identification Providing the basis from which the configuration of products is defined and verified, products and documents are labeled, changes are managed, and accountability is maintained. Configuration Status Accounting Capturing, storing, and accessing configuration information needed to manage products and product information effectively. Configuration Verification and Auditing Establishing that the performance and functional requirements defined in the configuration documentation have been met. Change Control Board All requested changes must be either accepted or rejected by some authority within the project management team or an external organization representing the initiator, sponsor, or customer. Oftentimes a Change Control Board is established to approve and reject changes. The roles and responsibilities of the Change Control Board are defined in the configuration and change control procedures. PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 5 Perform Integrated Change Control Data Flow Diagram PMBo. K®

Project Integration Management 4. 5 Perform Integrated Change Control Data Flow Diagram PMBo. K® Guide, 4 th Edition, p. 96 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 61

Project Integration Management Practice Question: A change control process should be created: A. As

Project Integration Management Practice Question: A change control process should be created: A. As needed per the project plan B. By the steering committee C. As a formal documented procedure D. Only if changes are expected PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 62

Project Integration Management Develop Project Management Plan Process Project Management Process Groups Knowledge Area

Project Integration Management Develop Project Management Plan Process Project Management Process Groups Knowledge Area Initiating 4. Project Scope Management 4. 1 Develop Project Charter Planning 4. 2 Develop Project Management Plan Executing 4. 3 Direct and Manage Project Execution Monitoring & Controlling 4. 4 Monitor and Control Project Work 4. 5 Perform Integrated Change Control Closing 4. 6 Close Project or Phase Across Project Management Process Groups PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 6 Close Project or Phase Definition: “The process of finalizing

Project Integration Management 4. 6 Close Project or Phase Definition: “The process of finalizing all activities across all of the Project Management Process Groups to formally complete the project or phase” PMBo. K® Guide, 4 th Edition, p. 99 PMBo. K® Guide, 4 th Edition, p. 100 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 64

Project Integration Management 4. 6. 1 Close Project or Phase Inputs 4. 6. 1.

Project Integration Management 4. 6. 1 Close Project or Phase Inputs 4. 6. 1. 1 Project Management Plan 4. 6. 1. 2 Accepted Deliverables Organizational 4. 6. 1. 3 Process Assets Scope Verification: Formal acceptance of the completed project deliverables • • • Closure guidelines, requirements and procedures Historical information Lessons learned database PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 6. 2 Close Project or Phase Tools and Techniques 4.

Project Integration Management 4. 6. 2 Close Project or Phase Tools and Techniques 4. 6. 2. 1 Expert Judgment Previously defined PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 6. 3 Close Project or Phase Outputs Final Product, 4.

Project Integration Management 4. 6. 3 Close Project or Phase Outputs Final Product, 4. 6. 3. 1 Service, or Result Transition of the project’s (or phase’s) product or result to: • • • Organizational 4. 6. 3. 2 Process Assets Updates • • The ongoing organization, or The next phase of the project Lessons Learned Corporate Knowledge Base Project Files Project or phase closure documents Historical information PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0

Project Integration Management 4. 6 Close Project or Phase Data Flow Diagram PMBo. K®

Project Integration Management 4. 6 Close Project or Phase Data Flow Diagram PMBo. K® Guide, 4 th Edition, p. 100 PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 68

Project Integration Management Practice Question: Once the project is complete, the complete set of

Project Integration Management Practice Question: Once the project is complete, the complete set of project records should be put in which of the following: A. Project archives B. Iron Mountain C. Document Imaging system D. Returned to the project sponsor PMP Prep Course – Project Integration Management - PMBOK 4 th Edition – Version 1. 0 69

Project Integration Management Good Luck!! PMP Prep Course – Project Integration Management - PMBOK