Premier Ponds Wildlife Inc Employee Ladder Jerry Puckett

  • Slides: 33
Download presentation
Premier Ponds & Wildlife, Inc.

Premier Ponds & Wildlife, Inc.

Employee Ladder • Jerry Puckett • Sarah Puckett President-CEO & PEC Instructor Vice President-Human

Employee Ladder • Jerry Puckett • Sarah Puckett President-CEO & PEC Instructor Vice President-Human Resources-Accounting • Roy Biles HSE Coordinator/Finance-Special Project Coordinator & PEC Instructor • Joseph Morales Field Supervisor-Operations • Robert Lumpkins Assistant HSE Coordinator/Company Liaison • Teri Wilson Secretary-Treasurer • Scott Puckett Technical Support • Kaeleigh Rilling Office Assistant

Company Contact List Jerry Puckett Kaeleigh Rilling President-CEO & PEC Instructor Vice President. Human

Company Contact List Jerry Puckett Kaeleigh Rilling President-CEO & PEC Instructor Vice President. Human Resources. Accounting HSE Coordinator/ Finance-Special Project Coordinator & PEC Instructor Field Supervisor. Operations Assistant HSE Coordinator/ Company Liaison Office Assistant Teri Wilson Scott Puckett Secretary-Treasurer Technical Support Sarah Puckett Roy Biles Joseph Morales Robert Lumpkins • jerry@jpconstruction-services. com • sarah@jpconstruction-services. com • roy@jpconstruction-services. com • joey@jpconstruction-services. com • robbie@jpconstruction-services. com • kaeleigh@jpconstruction-services. com

Business History • Started Pond Liner Installations in 2006 in recreational ponds. • Installed

Business History • Started Pond Liner Installations in 2006 in recreational ponds. • Installed our first Frac Pond for Petrohawk Energy in March 2009 in the Eagle Ford Shale. • Have installed an excess of 600 pond liners during this time frame. • Currently on staff are 12 full time employees; • 6 part time employees; • Up to 30+ temporary employees.

Description of Services • Frac Pit Liner Installation of all shapes & sizes. •

Description of Services • Frac Pit Liner Installation of all shapes & sizes. • Liner repairs, both above and below water level. • Water Safety (Ropes & Floats) Installation. • Water Transfer Tube Installation. • Certified Diver Inspections on RRC permitted pits.

JERRY PUCKETT (Company President)

JERRY PUCKETT (Company President)

CEO/President BIO • Jerry A. Puckett • Over 40 years of Oilfield experience •

CEO/President BIO • Jerry A. Puckett • Over 40 years of Oilfield experience • Worked for Coastal States/Lo Vaca Gathering, Valero Energy. • Frac Pit Lining, Repair, Safety Ropes and Floats, Water Transfer Sleeves, and Inspections.

CEO/President BIO (continued) • • • College Graduate Married for 40 + years Two

CEO/President BIO (continued) • • • College Graduate Married for 40 + years Two children, both college graduates Four grand children Hobbies: Fishing, Golf, Hunting

Liner Installation Procedure • Evaluate Condition of Work Site • Visually Inspect Equipment •

Liner Installation Procedure • Evaluate Condition of Work Site • Visually Inspect Equipment • Enter and Start Up Track Hoe • Spotter and Helper Install Proper Rigging on Track Hoe to Lay Out Material • Spotter and Rigger Insert Rig in Roll of Plastic • Lay Out Roll of Plastic; 1 st Piece Edge Along Footer Trench • Align Installers Along Edge of Material and Unfold Material Down Berm • Install 2 nd Roll of Plastic and Align Edge with 1 st Roll; Repeat process Trim and Weld 1 st and 2 nd Roll • Install Each Remaining Roll; Align with Previous Installed Roll; Trimming and Welding • Install Final Edge in Footer Trench; Trim All Poly and Insert Poly in All Perimeter Trenches • Examine Entire Bottom and All Seams • Make Any Repairs as Required Using Blower or Extruder • Measure Depth of Pond and Mark on Liner; Backfill Trenches and Level Berm; Clean Up Trash, Excess Plastic; Tie Down Extra Material on Trailer Along With Securing Rigging on Trailer • Make Head Count, Survey Property for Trash, Exit Property; Observe Speed Limit

Beginning of Liner Installation

Beginning of Liner Installation

Insert Spreader Bar in Roll of Plastic and Lay Out 1 st Roll Along

Insert Spreader Bar in Roll of Plastic and Lay Out 1 st Roll Along the Footer Trench

Align Installers Along the Edge of Plastic and Unfold the Material Down the Berm

Align Installers Along the Edge of Plastic and Unfold the Material Down the Berm

Trim and Weld the Edges of Each Roll Of Plastic

Trim and Weld the Edges of Each Roll Of Plastic

(CONTINUE THE LAYOUT AND PULL OUT PROCESS UNTIL ALL ROLLS ARE INSTALLED- TRIM AND

(CONTINUE THE LAYOUT AND PULL OUT PROCESS UNTIL ALL ROLLS ARE INSTALLED- TRIM AND WELD EDGES OF PLASTIC)

Liner Installation In Progress

Liner Installation In Progress

Liner Installation in Progress

Liner Installation in Progress

Install Final Edge in Footer Trench, Trim and Insert Plastic in all Perimeter Trenches

Install Final Edge in Footer Trench, Trim and Insert Plastic in all Perimeter Trenches

Examine Entire Bottom and All Seams

Examine Entire Bottom and All Seams

Measure Depth of Pond and Mark the Liner

Measure Depth of Pond and Mark the Liner

Water Safety Installation DESCRITION OF SYSTEM Material used will be a 3/4 inch floating

Water Safety Installation DESCRITION OF SYSTEM Material used will be a 3/4 inch floating poly rope, tied to 3 inch eye bolt anchored in schedule 40, two inch galvanized six foot long metal posts, concreted in two foot deep holes on the top of the berms of the pond in the four comers. A galvanized metal cap is placed on top of each installed post. The ropes shall be installed on a comer to opposite comer layout. Six inch swimming pool floats shall be placed on the rope at 20 foot intervals using 24 inch cable ties. Four throw ring life buoys will be installed on a hook bolted to each of the comer posts. Finally upon completion, “no swimming” signs, and “caution hot water”(if applicable) signs shall be installed on a separate metal sign post. SCOPE The contractor shall provide all labor, materials, equipment and incidentals required to provide a complete rope and float safety system. MATERIALS High visibility ¾ inch floating poly ropes. Six foot long, schedule 40 two inch steel galvanized pipe tubes will be used for the comer and sign post, 6" swimming pool rope floats, and safety throw ring life buoys. INSTALLATION The contractor shall drill post holes at a min. depth of 2' in the comers of the top of the frac pond berms about 4 feet from water's edge of a full pond. Ropes shall then be run from comer to the opposite comer the entire length of the pond. Once ropes are installed, the floats will be installed at 20' increments. If water exist in the pond, floatation devices such as a boat or kayak may be required. Throw ring Lifebuoys (30") are then installed on hooks on each post, and an additional post shall be installed at the nearest point where ingress is established at the pond for the “no swimming“ signs. EQUIPMENT Post hole digger Kayak or other suitable floatation device Approved PFD Cable ties for securing floats to rope

Water Safety Installation (WSI)

Water Safety Installation (WSI)

Water Safety Installation (WSI)

Water Safety Installation (WSI)

Water Transfer Tube Installation • • • Evaluate Condition of Work Site Inspect Equipment

Water Transfer Tube Installation • • • Evaluate Condition of Work Site Inspect Equipment Load Poly on Spool Trailer Lay Poly Spool Cut Poly Set Butt Ends in Welding Machine Shave Butt Ends of Poly Weld Butt Ends of Poly Clean Up Trash, Excess Poly; Load up Equipment Make Head Count, Survey Property for Trash, Exit Property; Observe Speed Limit

Water Transfer Tube Installation

Water Transfer Tube Installation

Water Transfer Tube Installation

Water Transfer Tube Installation

Water Transfer Tube In Use

Water Transfer Tube In Use

Water Transfer Tube Installation

Water Transfer Tube Installation

Water Transfer Tube Testing During Fracturing

Water Transfer Tube Testing During Fracturing

Pond Inspection in Progress

Pond Inspection in Progress

Diver Repairing Pond Liner in Progress

Diver Repairing Pond Liner in Progress

Material Found and Removed During Inspection

Material Found and Removed During Inspection

Customer Service & Safety • Customer Satisfaction is our # 1 priority. • All

Customer Service & Safety • Customer Satisfaction is our # 1 priority. • All safety measures are enforced preinstallation, during installation, and post installation. • Employees on all job sites are Safeland/OSHA certified. • We are members of the ISNetworld community. • We are members of the DISA community.

Premier Ponds & Wildlife, Inc. is dedicated to providing a complete Frac Pond Liner

Premier Ponds & Wildlife, Inc. is dedicated to providing a complete Frac Pond Liner System including installation, maintenance, repairs, and inspections in a safe and ecological friendly manner.