AGENDA 2 Non binding – information 1. Fluxys als gasbedrijf 2. Groen gas voor

AGENDA 2 Non binding – information 1. Fluxys als gasbedrijf 2. Groen gas voor Belgium 3. Groene certificaten

FLUXYS: SHAREHOLDERS WITH LONG-TERM INVESTMENT OUTLOOK Publigas (Belgian municipalities) 77. 53% 0. 43% Employees

FLUXYS: SHAREHOLDERS WITH LONG-TERM INVESTMENT OUTLOOK Publigas (Belgian municipalities) 77. 53% 0. 43% Employees & Management Non binding – information Caisse de dépôt et placement du Québec 19. 91% 2. 13% Federal Holding and Investment Company

FLUXYS: TRANSPORT SYSTEM OPERATOR IN BELGIUM 200 industriële eindverbruikers 19 warmtekrachtkoppelingen 18 interconnectiepunten 121

FLUXYS: TRANSPORT SYSTEM OPERATOR IN BELGIUM 200 industriële eindverbruikers 19 warmtekrachtkoppelingen 18 interconnectiepunten 121 mld. m³/j ingangscapaciteit Vervoer voor de Belgische markt 16 mld. m³/j 18 elektriciteitscentrales Netten van 17 distributienetbeheerders 70. 000 km Lage druk Grens-tot-grens vervoer naar buurnetten 80 mld. m³/j uitzendcapaciteit Aardgasverbruik België: ~ 17 mld. m³/j 4 Non binding – information 3, 2 miljoen Huishoudens 100. 000 KMO’s

BELGIUM : TRANSMISSION INFRASTRUCTURE LNG NETHERLANDS ZANDVLIET NORWAY ZELZATE UNITED KINGDOM Our infrastructure HILVARENBEEK

BELGIUM : TRANSMISSION INFRASTRUCTURE LNG NETHERLANDS ZANDVLIET NORWAY ZELZATE UNITED KINGDOM Our infrastructure HILVARENBEEK ZEEBRUGGE Loenhou t Antwerpen Sint-Niklaas Brugge NORWAY / GERMANY Mechelen Gent Genk Winksele FRANCE • 4000 km pipelines – 20 physical interconnections DILSEN ‘S-GRAVENVOEREN Aalst Brussels Kortrijk NORWAY / GERMANY Berneau ALVERINGEM • LNG Terminal, with a deliverability of 9 BCM/y • 700+ MCM storage volume in Loenhout RUSSIA / GERMANY Liège Tournai EYNATTEN Verviers Namur 431 TWh transport Charleroi High calorific gas Mons Low calorific gas Physical interconnection LNG terminal Compressor stations Blending stations Storage 5 Non binding – information Distribution 93 TWh BRAS BLAREGNIES FRANCE SPAIN ITALY LUXEMBOURG Bastogne Libramont Arlon PÉTANGE LUXEMBOURG Transit 59% Domestic Industry 42 TWh 41% Power 45 TWh

AGENDA 6 Non binding – information 1. Fluxys als gasbedrijf 2. Groen gas voor

AGENDA 6 Non binding – information 1. Fluxys als gasbedrijf 2. Groen gas voor Belgium 3. Groene Certificaten

FLUXYS ACTIVELY SUPPORTS BIOMETHANE IN BELGIUM First biomethane injection in DSO grid on 11

FLUXYS ACTIVELY SUPPORTS BIOMETHANE IN BELGIUM First biomethane injection in DSO grid on 11 th November 2018 • Other projects in the pipeline • To be connected to gas grid in cooperation between DSO’s and Fluxys Green gas Register connecting green production with conscious energy users • Creating Belgian market for Guarantees of Origin further valorizing green gas Fluxys supporting bio-LNG in the Zeebrugge terminal (see next slides) 7 Non binding – information

AS WELL AS HYDROGEN Hydrogen: the new energy carrier? • Power-to-Gas could enable storage

AS WELL AS HYDROGEN Hydrogen: the new energy carrier? • Power-to-Gas could enable storage of intermittent renewable energy • Gas grids represent the biggest batteries available today • At first, injection in NG grid can be done up to 2%vol without any impact. Large volumes being studied Hy. Off. Wind: First large scale P 2 G installation in Belgium • Collaboration between Fluxys, Parkwind and Eoly • Outcome feasibility study expected in 2019 • Subsidies have been granted by the federal Fund for Energy Transition 8 Non binding – information

BIOGAS SITUATION IN BELGIUM • • • Existing Biogas plant were build around 10

BIOGAS SITUATION IN BELGIUM • • • Existing Biogas plant were build around 10 years ago Business model was based on production of green-electricity from CHP Support is limited to 10 or 15 years and by 2020 -2025 new support schemes (Groene stroom certificaten) are ending Biogas producer are now looking at Biomethane upgrading but need some support or risk to close (- 1 TWh electricity and – 3 TWh heat) While the potential is up to 10 TWh 9 Non binding – information

WHY GREEN GAS Green gasses biomethane tot -90% Green Hydrogen tot -23% tot -90%

WHY GREEN GAS Green gasses biomethane tot -90% Green Hydrogen tot -23% tot -90% tot -99% CO CO 2 2 GHG Natural gas: already an important benefit compared to other fossil fuels GHG CO NOx tot -99% Particals SO 2 2 GHG Air Qualtiy Emissies: of natuaral gas compared to diesel gasoil [Roland Berger – Thinkstep] and reduction of green gasses Natural gas as transition fuel can offer sustainable benefits mostly on Air quality, and can evolve to green gases to further counter CHG emissions 10 Information – non binding

AGENDA 11 Non binding – information 1. Fluxys als gasbedrijf 2. Groen gas voor

AGENDA 11 Non binding – information 1. Fluxys als gasbedrijf 2. Groen gas voor Belgium 3. Groene certificaten

VALUE CHAIN OF GREEN GAS The Green Gas value chain is split in two

VALUE CHAIN OF GREEN GAS The Green Gas value chain is split in two Sub-Chains with different behavior but still more or less linked (depending on the need of “mass balance”) q. The Gas chain follows the existing market rules (balancing, …) as for Natural gas Gas Balancing & Allocation Mass – balancing Green Gas Green The market favours Mass Balance Registry & GO Support Book & Claim q. The Green chain needs a register and Guarantees of Origin (proof of origin & often proof of sustainability) v Clients often want GO’s for “image” reasons (and in some regions for renewable support schemes) v Producers need GOs as an additional income stream (and in some regions production support schemes) 12 Non binding – information

DEMONSTRATION PROJECT AROUND GREEN GAS REGISTER The Demonstration Project is a voluntary and temporary

DEMONSTRATION PROJECT AROUND GREEN GAS REGISTER The Demonstration Project is a voluntary and temporary scheme from GAS. BE (association of TSO/DSO) with relevant parties around the biomethane injection in IOK Merksplas The consumer requires a “Proof of Sustainability” (Po. S) with a indication of the CO 2 equivalent reduction of the production plant The consumer requires a “Proof of Origin” (Po. O) with the feedstocks and production flows DSO/TSO Metering Creation GOs GO Pending Trading GOs Consumption GOs 13 Non binding – information AUDITOR of Po. O Po. S Operational as from Jan 2019 TRADERS GO Validated CONSUMER GU OR ARA IGI NTE N E Producer Code Amount Po. O Po. S

CONVERSION OF GREEN GAS GO’S TO GO’S FOR GREEN HEAT Picture with permission and

CONVERSION OF GREEN GAS GO’S TO GO’S FOR GREEN HEAT Picture with permission and regards to EDF Luminus VEA Fluxys WKK Warmte Biomethaan Waterstof, Groen warmte GO HOW Groen gas GO VREG bekrachtigd Garanties van oorsprong 14 Recent Flanders Decree should allow transfer from green gas to green heat Information – non binding AIB tradable market Fluvius PV Groen Elec GO