Status of the IAEA safety standards and Relation to the CRAFT project Monika Kinker Radioactive Waste and Spent Fuel Management Unit Division of Radiation, Transport and Waste Safety - NSRW IAEA International Atomic Energy Agency
Structure of the Safety Standards IAEA 2
RW in the Safety Standards 2010 2011 2009 Fundamental Safety Principles Classification 2008 2006 Small Generators RW Storage DS 454 Management Systems 2012 Spent Fuel Storage FCFs HLW L/ILW Reactors DS 447 DS 448 (2012? ) Safety Case & Assessment Predisposal IAEA DS 284 3
Facility-, Activity-Specific NPPs Storage “Small Generators” Storage RRs Small Amounts DS 448 L/ILW– Mgmt of RW from Reactors R&D Facilities Medicine, industry, agriculture, research and education U/MOX Fuel Fabrication Centralized RWM Facilities Vitrification Plants SNF Storage of Spent Nuclear Fuel DS 447 – HLWof Mgmt RW from FCFs Reprocessing Plants DS 371 IAEA 4
Current Structure DS 447, 448 1. Introduction 2. Protection of Human Health & the Environment 3. Roles & Responsibilities • • • Government Regulatory Body Operating Organization Integrated Approach to Safety 4. • • • Safety and Security Interdependences Management System Safety Case and Safety Assessment 5. • Links to DS 284 IAEA Steps in the Predisposal Management of RW 6. • e. g. , waste min, clearance, characterization, processing, storage, etc Development and Operation of Predisposal RWM Facilities & Activities 7. • • Lifecycle issues, Consideration of normal/accident conditions decommissioning, emergency response Appendices: Specific Examples of Safety Considerations (Facility/Process) Appendix: Key properties of SNF declared as waste (DS 448) Annex or Appendix? : Facility-Specific Waste Management Plan Annex: Development of Specifications for Waste Packages 5
Safety Standards: Predisposal RWM Safety Case, Safety Assessment 2009 (2012? ) Safety Case, Assessment Predisposal DS 284 IAEA 6
IAEA Terminology regarding the Safety Case, Safety Assessment … • GSR Part 5, DS 284: Safety Case • A collection of arguments and evidence in support of the safety of a facility or activity. This will normally include the findings of a safety assessment and a statement of confidence in these findings. • GSR Part 4 , DS 284: Safety Assessment 1. Assessment of all aspects of a practice that are relevant to protection and safety; includes siting, design & operation of the facility. This normally includes risk assessment and probabilistic SA. 2. Analysis to predict the performance of an overall system and its impact, where the performance measure is the radiological impact or some other global measure of the impact on safety. IAEA 7
DS 284: Safety Guide for SC and SA 1. Introduction 2. Demonstrating the Safety of Predisposal Management 3. 4. 5. 6. 7. of Radioactive Waste Objectives and Development of the Safety Case for Predisposal Safety Assessment Specific Issues (Evolution, Graded Approach, Defence in Depth, Reliability, Lifetime, LTS) Documenting and Using the Safety Case & Assessment Regulatory Review Process Predisposal DS 284 ANNEX A ANNEX B ANNEX C ANNEX D IAEA Examples Of Hazards And Initiating Events Topical Issues for The SA Review Template Of Regulatory Review Report SADRWMS Project Flowcharts 8
DS 284: Safety Case Components, Process ste Sy nt me ge na Ma of ion cat pli Stakeholder and Regulatory Involvement m Ap IAEA 9
Safety Assessment: GSR Part 4, DS 284 GSR Part 4 DS 284 environmental impact Non radiological Impact Scenarios Models Calculations Site and Engineering IAEA Radiological Operational Safety Management System Safety Assessment 10
DS 284: Proposal to June 2010 WASSC for Approval • In order to provide additional guidance on the level of depth and detail warranted for safety cases, it was proposed that the IAEA would develop illustrative safety reports with example safety cases -> CRAFT PROJECT IAEA 11
International Intercomparison and Harmonization Projects • CRAFT (successor to SADRWMS) • SADRWMS Methodology and SAFRAN Tool • Illustrative examples to complement SG (DS 284) • PRISM • • Safety case Barrier performance WAC Uncertainty • GEOSAF • Regulatory expectations throughout development and operation • Review process • Assessment – engineering, site, radiological impact, integration • Working Group for the Dual Use Cask for Spent Nuclear Fuel • Safety case • extended periods of storage and meeting transport requirements IAEA 12
SADRWMS Project Safety Assessment Driving Radioactive Waste Management Solutions Objectives: 1. 2. EXAMINE the application of safety assessment methodology (ISAM, ASAM) DEVELOP, document • Safety Assessment Methodology • Regulatory Review • ---> DS 284… 3. INTEGRATE methodology into software tool (SAFRAN) IAEA Safety Case & Assessment Predisposal DS 284 13
IAEA 14
CRAFT (Complimentary Safety Reports: Development and Application to Waste Management Facilities) 3 - 4 Year Project • Next Plenary Meeting June 2013 Objectives: 1. 2. 3. APPLY DS 284, SADRWMS methodology & SAFRAN Tool PROVIDE a forum for application of the methodology and SAFRAN tool DEVELOP, document Safety Reports illustrating application of DS 284 • • IAEA Facility/process specific Safety Case Process/Regulatory Review 15
Status of the Project • 2 Technical Meetings (May 2011, June 2012) • Working Groups Agreed • Process Specific Cases: Processing/Storage, Legacy • Safety Case Process/Regulatory Interactions • Application WGs developing Safety Assessments (SAFRAN) • Regulatory WG developing guidance for review of work by application WGs • Next TM scheduled for 17 -21 June 2013 • Present WG Work against DS 284, SADRWMS • Begin development of Safety Cases IAEA 16
Proposed Template A. SAFETY CASE B. SAFETY ASSESSMENT 1. SAFETY CASE CONTEXT 1. 2. Safety Strategy SADRWMS flowcharts ASSESSMENT CONTEXT Purpose, Philosophy, Approaches, Regulatory Framework, Endpoints, Time Frame 2. FACILITY DESCRIPTION Specific Aspects 3. DEVELOPMENT, JUSTIFICATION OF SCENARIOS Hazard Identification, Screening Scenario Identfication (normal, DBAs, BDBAs) 4. FORMULATION OF MODELS 5. CALCULATIONS, ANALYSIS management of uncertainties 6. ANALYSIS OF RESULTS purpose, scope, demonstration of safety, graded approach 3. Facility Description 4. Safety Assessment Overview/Highlights 5. Management Of Uncertainties 6. Iteration, Design Optimization 7. ID of Safety Measures 8. Limits, Conditions, & Controls 9. Integration of Arguments C. FINDINGS AND CONCLUSIONS IAEA 17
IAEA Thank you! 18