Overview on CPWD DSR 2018 For Road Work, Building Works, Horticulture ETC G. M.

Overview on CPWD DSR 2018 For Road Work, Building Works, Horticulture ETC G. M. AGATKAR Sr. INSTRUCTOR/WORKS

ADOPTION OF CPWD SOR(DSR) RLY. BD VIDE L. NO. 2018/CE-2/USSOR/1/W&M DT. 06. 12. 2019

ADOPTION OF CPWD SOR(DSR) RLY. BD VIDE L. NO. 2018/CE-2/USSOR/1/W&M DT. 06. 12. 2019 HAVE DECIDED TO ADOPT CPWD DELHI DSR 2018, ANALYSIS OF RATES (AOR) AND CPWD SPECIFICATIONS FOR EXECUTION OF ALL CIVIL ENGINEERING WORKS RELATED TO BUILDING WORK, ROAD WORKS AND HORTICULTURE WORKS.

FOLLOWING CPWD DOCUMENTS TO BE ADOPTED. 1. DSR 2018 VOL. I 2. DSR 2018

FOLLOWING CPWD DOCUMENTS TO BE ADOPTED. 1. DSR 2018 VOL. I 2. DSR 2018 VOL. II 3. DSR HORTICULTURE AND LANDSCAPING. 4. SPECIFICATION 2019 VOL. I 5. SPECIFICATION 2019 VOL. II 6. PLINTH AREA RATES 2019

TRANSITION FROM USSOR 2010 TO CPWD DSR MAY BE CARRIED OUT AS UNDER. A.

TRANSITION FROM USSOR 2010 TO CPWD DSR MAY BE CARRIED OUT AS UNDER. A. CPWD DSR IS PUBLISHED FROM CPWD HEADQUARTERS AT NEW DELHI AND APPLICABLE ALL OVER INDIA WITH SUITABLE FACTOR “BUILDING COST INDEX” B. BCI IS WORKED OUT AS PER ANNEXURE IV OF PLINTH AREA RATES 2019 BASED ON THE CONCURRENT RATES OF GEOGRAPHICAL AREA FOR VARIOUS COMPONENTS. C. AS PER PREVALENT SYSTEM OF CPWD BCI IS DERIVED BY ALL ZONAL HEADS OF CPWD (CE) FOR DIFFERENT PLACES IN THEIR JURISDICTION. D. BUILDING COST INDEX FOR CPWD DSR 2018 IS 118 AS PER CPWD PLINTH AREA RATES 2012(BASE 100).

E. HOD OF THE CPWD SHALL ADOPT BCI OF THE RESPECTIVE ZONE OR WORK

E. HOD OF THE CPWD SHALL ADOPT BCI OF THE RESPECTIVE ZONE OR WORK OUT THE SAME DULY UPDATING THE RATES IN BCI (ANNEX. IV OF PAR 2020) WITH CONCURRANCE OF ASSOCIATE FINANCE. F. THE DEPARTMENTAL ADMIN OF HEAD OF CIVIL ENGINEERING DEPARTMENT IN IREPS HAS BEEN AUTHORISED TO UPDATE “BCI” AS APPROVED BY CIVIL ENGINEERING DEPARTMENT, ON IREPS TIME TO TIME. G. ALL CPWD DOCUMENTS : DSR, AOR, SPECIFICATIONS ARE AVAILABLE ON https: CPWD. GOV. IN/DOCUMENTS/CPWD_PUBLICATION. ASPX. HOWEVER, ANY CHANGE OR NEW GUIDELINES RELATED TO CPWD DSR, AOR AND SPECIFICATIONS SHALL BE EFFECTIVE ON INDIAN RAILWAYS ONLY WHEN UPLOADED BY MINISTRY OF RAILWAYS WEBSITE.

H. SINCE ADOPTION OF CPWD DSR ON INDIAN RAILWAYS IS NEW EXERCISE , RAILWAYS

H. SINCE ADOPTION OF CPWD DSR ON INDIAN RAILWAYS IS NEW EXERCISE , RAILWAYS MAY ALSO CONSIDER THE LAR OF CPWD FOR SIMILAR WORKS FOR EVALUATION OF RAILWAY TENDERS, TILL SUFFICENT LARS WITH CPWD DSR FOR RAILWAY WORKS ARE AVAILABLE. I. RAILWYS ARE AVISED TO FINALISE “BCI” FROM TIME TO TIME AND ADOPT CPWD DSR 2018 AND CPWD SPECIFICATIONS FOR EXECUTION OF CIVIL ENGINEERING WORKS RELATED TO BUILDING WORKS, ROAD WORKS AND HORTICULTURE ETC.

DSR 2018 v DSR 2018 IS BASED ON PREVAILING MARKET RATES OF MATERIALAS IN

DSR 2018 v DSR 2018 IS BASED ON PREVAILING MARKET RATES OF MATERIALAS IN NEW DELHI AS ON 01. 10. 2018 AND LABOUR RATES W. E. F. 01. 10. 2018 ISSUED BY GOVT. OF INDIA /GOVT. OF DELHI WHICHEVER IS HIGHER. v NS ITEMS TO BE ADOPTED IF REQUIRED WITHOUT ADDITION OF COST INDEX. v IT IS TO BE READ ALONG WITH CPWD SPECIFICATION 2019 VOL. I AND VOL. II WITH UPTO DATE CORRECTION SLIPS. v IT IS BILINGUAL IN TWO VOLUMES.

DSR 2018 v THE EFFECT OF GST ON WORKS CONTRACT HAS BEEN INCORPORATED IN

DSR 2018 v THE EFFECT OF GST ON WORKS CONTRACT HAS BEEN INCORPORATED IN ALL ITEMS. v ADDITION OF NEW TECHNOLOGY MATERIALS. v THE COST INDEX FOR DSR 2018 IS 118 WITH REFERENCE TO PAR 2012 HAVING THE BASE 100 AS ON 01. 10. 2012.

AOR 2019 v AOR IS BASED ON CURRENT MARKET RATES OF MATERIAL AT DELHI

AOR 2019 v AOR IS BASED ON CURRENT MARKET RATES OF MATERIAL AT DELHI PREVAILING AS ON 01. 10. 2018 v THE EFFECT OF GST ON WORKS CONTRACT HAS BEEN INCORPORATED IN ALL ITEMS. v SUNDRIES HAVE BEEN CONSIDERED AS 2. 0 TIMES BASED ON COST INDEX OF DELHI AS ON 01. 10. 2018(118)WITH BASE AS PER PAR 2012 AS 100.

PLINTH AREA RATE 2019 v PLINTH AREA RATES ARE BEING PUBLISHED BY CPWD FROM

PLINTH AREA RATE 2019 v PLINTH AREA RATES ARE BEING PUBLISHED BY CPWD FROM TIME TO TIME IS COMPREHENSIVE AND USEFUL TECHNICAL DOCUMENT TO ARRIVE AT A PRELIMINARY COST OF A PROJECT W. R. T. ALL KINDS OF BUILDINGS LIKE OFFICES/COLLEGES/HOSTELS/HOSPITALS AND RESIDENTIAL BUILDINGS. v APART FROM CPWD ENGINEERS, THIS PUBLICATION IS USED BY MOST OF THE ENGINNERING ORGANISATIONS AND BUILDERS IN THE COUNTRY.

v NEW PLINTH AREA RATES 2019 ARE PREPARED WITH 01. 04. 2019 RATES BEING

v NEW PLINTH AREA RATES 2019 ARE PREPARED WITH 01. 04. 2019 RATES BEING CONSIDERED AS BASE 100. v RATES FOR OFFICE BUILDING, SCHOOL BUILDING AND COLLEGE/INSTITUTIONS ARE MERGED INTO NON RESIDENTIAL BUILDINGS. v THE RATES FOR HOSPITALS ARE MERGED INTO RESIDENTIAL BUILDINGS.

PAR COMPRISES OF FOLLOWING ANNEXTURES v ANNEXURE I: NEW PAR FOR NON RESIDENTIAL /RESIDENTIAL

PAR COMPRISES OF FOLLOWING ANNEXTURES v ANNEXURE I: NEW PAR FOR NON RESIDENTIAL /RESIDENTIAL BUILDINGS IN RCC FRAMED AND LOAD BEARING STRUCTURE ALONGWITH SERVICES AND DEVELOPMENT OF SITE COMPONENTS. v ANNEXTURE II: SPECIFICATIONS OF RESIDENTIAL BUILDINGS , SCALE OF AMENITIES AND WATER SUPPLY FITTINGS AND ELECRTICAL INSTALLATIONS IN GPRA AND SPECIFICATION FOR NON RESIDENTIAL BUILDINGS. v ANNEXURE III: GUIDELINE FOR WORKING OUT PLINTH AREA FROM PLANS.

v ANNEXURE IV: PROFORMA FOR CALCULATING COST INDEX FOR FUTURE COST INDICES WITH BASE

v ANNEXURE IV: PROFORMA FOR CALCULATING COST INDEX FOR FUTURE COST INDICES WITH BASE 100 ON 01. 04. 2019 INDICATING REVISED WEIGHTAGE. v ANNEXURE V “ PAR PROVISIONS FOR SPECIALISED E&M WORKS ON 01. 04. 2019 BUILDING COST INDEX v BUILDING COST INDEX NOTIED TWICE IN A YEAR ON 1 st OF APRIL AND 1 st OF OCTOBER ABOVE THE PLINTH AREA RATE OF F 01. 04. 2019 (AT BASE RATE 100)

New Technologies and Materials With a view to give boost to make in India

New Technologies and Materials With a view to give boost to make in India initiative of the Government, new technology items have been added in New Technologies and Materials sub Head. These new items are included for a period of two years and then performance shall be reviewed. Following are the items added under this sub head: 1. Bamboo mat corrugated sheet (BMCS), Bamboo mat ridge cap(BMRC), false ceiling of Phenol Bamboo mat board, wall paneling with Phenol bonded Bamboo mat board (item no. 26. 6 a to e ).

2. EPS cement sandwich light weight solid core panels (item no. 26. 49). 3.

2. EPS cement sandwich light weight solid core panels (item no. 26. 49). 3. Non Asbestos fiber reinforced aerated sandwich wall/roof/floor light weight solid core panels (item no. 26. 50). 4. GFRG items (item no. 26. 51 to 26. 61) 5. Speed floor system (Item no. 26. 62 to 26. 64). 6. Factory made fast track modular system (Item no. 26. 65 to 26. 66)

7. External thermal insulation in composite system (Item no. 26. 67) 8. Precast solid

7. External thermal insulation in composite system (Item no. 26. 67) 8. Precast solid cement concrete blocks and paver blocks made 12335 of C & D waste (Item no. 26. 68 to 26. 72) 9. Prefab/Precast technology (Item no. 26. 73 to 26. 80) 10. Scaffolding net (Item no. 26. 81)12112