LCLS-II Helium Vessel Production CM FDR Outline: • LCLS-II Helium Vessel Design • • Cryogenic Lines Weld Joints Alternative Design Investigated Cost Differential with Cavity Vendors • Drawing Packages • Helium Vessel • Bi-Metallic Transition • Bellow • Dressed Cavity Engineering Peer Review (15 -April-2014) • Specific to Helium Vessel • Bi-Metallic Transition Qualification • Cavity Dressing and Testing • TB 9 AES 027, TB 9 AES 018, TB 9 AES 021, and TB 9 AES 035 • VTS and HTS 2
LCLS-II Helium Vessel Design • • Driven by Past ILC Cavity Experience Cryogenic Line Modifications 3
LCLS-II Helium Vessel Design • Weld Joint Configurations 4
LCLS-II Helium Vessel Design • XFEL Vessel 5
LCLS-II Helium Vessel Design • Modified XFEL Vessel Investigated as Alternative Design 6
LCLS-II Helium Vessel Design • Modified XFEL Vessel Investigated as Alternative Design 7
LCLS-II Helium Vessel Design • Production Dressed Cavity Cost Differential (Cost % Supplied by F. Marhauser) LCLS-II Design Modified XFEL Design Potential Vendors Were Asked to Cost Both Designs • Cost Differential of Helium Vessel Between Two Potential Vendors Was Less Than +/- 1% of Overall Dressed Cavity Procurement Cost • One Vendor Had Increase Cost of LCLS-II Design of 0. 04% • One Vendor Had Reduction of Cost of LCLS-II Design by 1. 36% 8
Drawing Packages • LCLS-II Production Helium Vessel • • • Helium Vessel 100% Complete and Released Four Have Been Procured and 16 Additional Under Fabrication for p. CM Drawings can be Explored in Teamcenter or Supplied in PDF Format 9
Drawing Packages • LCLS-II Production Bi-Metallic Transitions • Bi-Metallic Transition (Large) – 20 Procured for p. CM • • Bi-Metallic Transition (Small) – 40 Procured for p. CM • • Drawing Complete, Needs Small Modification Before Release Drawing Complete and Released Drawings can be Explored in Teamcenter or Supplied in PDF Format 10
Drawing Packages • LCLS-II Production Helium Vessel Bellows • • Bellows 100% Complete and Released – 20 Procured for p. CM Drawings can be Explored in Teamcenter or Supplied in PDF Format 11
LCLS-II Dressed Cavity Peer Review • Review of Prototype Dressed Cavity – April 15, 2014 • • • No issues with helium vessel More work to qualify Bi-metallic transition - Completed Production Helium Vessel is the Same • Long-Short Cavity or Short-Short Cavity has no Influence on Helium Vessel Design • Bi-Metallic Transition Qualification • • • Cold shock test sample Charpy impact test (Room Temp. and 4 K) Tensile test (Room Temp. and 4 K) FEA analysis (Room Temp. and 2 K) Many 2 K Tests Performed on Dressed Cavities at Fermilab, Jefferson Lab, and Cornell 12
Cavity Dressing and Testing • Prototype Cavity Dressing – Same Procedure for Production Dressed Cavities • • Four Cavities Successfully Dressed – TB 9 AES 027, TB 9 AES 018, TB 9 AES 021, and TB 9 AES 035 Four Cavities Successfully 2 K Tested in Vertical and Horizontal Test Cryostats with Helium Vessels Performing as Expected. 13
Conclusion • LCLS-II Production Helium Vessel Design and Drawings Complete • Vessel Successfully Reviewed and Approved in Accordance with Fermilab ES&H Manual 5031. 6 (Dressed Niobium SRF Cavity Pressure Safety) • All Components Have Been Successfully Cold (2 K) Tested (Including Lever Tuner and Magnetic Shields) • The LCLS-II Helium Vessel Design Will be Used in the p. CM and is Compatible with Using the LCLS-II Tuner and Magnetic Shields for both Prototype and Production Cryomodules 14
LCLS-II Helium Vessel Production CM FDR Thank You! 15
LCLS-II Helium Vessel Production CM FDR Back-Up Slides • Bi-Metallic Transition Qualification • Cold shock test sample Test Results Courtesy of Donato Passarelli 16
LCLS-II Helium Vessel Production CM FDR Back-Up Slides • Bi-Metallic Transition Qualification • Charpy impact test 2. 5 Test Results Courtesy of Donato Passarelli 17
LCLS-II Helium Vessel Production CM FDR Back-Up Slides • Bi-Metallic Transition Qualification • Tensile test Test Results Courtesy of Donato Passarelli 18
LCLS-II Helium Vessel Production CM FDR Back-Up Slides • Bi-Metallic Transition Qualification • FEA analysis – Large transition joint Test Results Courtesy of Donato Passarelli 19
LCLS-II Helium Vessel Production CM FDR Back-Up Slides • Bi-Metallic Transition Qualification • FEA analysis – Small transition joint Test Results Courtesy of Donato Passarelli 20
- Chuck grimm
- Alir proses produksi multimedia
- Liquid helium production
- Tn dams
- Mbti innovateur
- Fdr
- Fdr political cartoons
- Fdr three rs
- Fdr dies truman becomes president
- Hoover v. fdr: responses to the great depression
- Wows fdr
- Fdr q value
- Fdr
- Fdr died
- Criticism of fdr
- George cassutto
- Nlra poster
- Fdr vps
- Fdr
- Enoxoparine
- Fdr