Connevans and the fm Genie an inside story



























- Slides: 27
Connevans and the fm. Genie – an inside story –
fm. Genie Thank you for buying an fm. Genie radio aid. The fm. Genie is a revolutionary new product which we are sure will give you many years of use. This presentation takes you behind the scenes to introduce Connevans and meet some of the staff who produce the system.
Your fm. Genie tour guide My name is David Evans, I am the Managing Director of Connevans Limited. As M. D. I hold the overall responsibility for the running of Connevans
When did Connevans start? My mother and father started Connevans Limited in 1961. In those days the company produced language teaching systems. It was in the late 1970’s that Connevans business changed to the manufacture and supply of equipment for deaf people.
The management team The Connevans board of Directors are committed to the production, supply and support of equipment for deaf people. Let me introduce my co-directors. . .
Constance Evans Connie Evans, my mother, now in her 80’s is still kept updated on what is happening in the company. And before you ask, you are quite correct, it is her name in ‘Connevans’.
John Popplestone John is responsible for customer field visits and support alongside his varied in-house operational responsibilities.
Mary Cann Mary, my sister, has responsibility for customer services. Should you require additional information on a product Mary is the person to talk with.
Gareth Pont Gareth has responsibility for the design of your fm. Genie and is the lead engineer for the project.
Designer Gareth testing some of the first of the fm. Genie units
The Design Team Bernard & Chris, members of the design team with particular responsibility for writing and debugging over 5000 lines of computer code for the fm. Genie software
Test & Inspection Robert – responsible for the testing and inspection of fm. Genies.
Production Atul – a member of the production team working on the fm. Genie
Bob – member of the production team working on the fm. Genie
Stuart – member of the production team working on the fm. Genie
Elaine – member of the production team who normally works on case assembly
fm. Genie cases fm. Genie case sub-assemblies waiting for tested circuit boards
Bertha & Bertha Too The printed circuit boards(PCBs) have most of their components placed by robot. We have two robotic assembly machines, Bertha and Bertha Too (named by my children!).
PCB assemblies The printed circuit boards are assembled by the robot in a biscuit of 12, we then cut them out and hand assemble the rest of the components.
The large square 68 pin integrated circuit is the computer chip. The red buttons are the switches under the front panel buttons.
Printed circuit board sub-assemblies waiting to be tested – maybe yours?
Some fm. Genie tested receivers waiting for a transmitter to spend their life with.
Rosi – with a handful of fm. Genie flashes. She is actually our graphic designer who does our cartoons, drawings and does the layout design for our catalogue and instruction booklets.
Wendy - responsible for the stores and making sure that the correct items go into parcels. This is a box of accessories for Hampshire – Harry who runs our despatch team was hiding out of camera shot!
The finished fm. Genie
The fm. Genie system
Thankyou for watching our presentation. We hope you found it interesting. Should you require any further information on the fm. Genie or any other products supplied by Connevans, please contact us.



























