WELCOME TO MECHANICAL www utwente nlgome ENGINEERING Lisa





















- Slides: 21
WELCOME TO MECHANICAL www. utwente. nl/go/me ENGINEERING Lisa Gommer Programme director
IN THIS PRESENTATION 1. MSc ME programme at the UT 2. Career prospects 3. Admission 4. Questions 5. Speclisations
1. MECHANICAL AT UNIVERSITY OF ENGINEERING • WHAT IS MECHANICAL ENGINEERING? TWENTE • THE STUDY PROGRAMME
WHAT IS MECHANICAL A VERY BROAD DISCIPLINE ENGINEERING?
WHAT IS MECHANICAL A VERY BROAD DISCIPLINE ENGINEERING?
1 st & 2 nd YEAR HIGH-TECH SYSTEMS AND MATERIALS ENERGY AND FLOW DESIGN AND MANUFACTURING AERONAUTICS ROBOTICS PERSONALISED HEALTH TECHNOLOGY MAINTENANCE ENGINEERING AND OPERATIONS SPECIALISATIONS
THE MSC ME STUDY PROGRAMME FIRST YEAR SECOND YEAR Specialization courses 30 EC Choose 6 out of 12 Internship Thesis 15 EC 45 EC Elective courses 30 EC Option for interdisciplinary focus: 3 courses outside of ME programme In all specialisations: Course “Frontiers in …. ”
THE MSC ME STUDY PROGRAMME EXTRA OPTION: DOUBLE DEGREE WITH ITA (BRAZIL) • double degree master programme (120 ec) • cooperation between the University of Twente and the Instituto Tecnológico de Aeronáutica (ITA) • Completion will result in two master degrees: • Master of Science in Mechanical Engineering from UT • Master of Science in Aeronautics and Mechanical Engineering from ITA • Duration: 2 years / 2 semesters at each university. More info: https: //www. utwente. nl/en/me/master_programme/double-degree/
3. CAREER PROSPECTS WHAT TO DO AFTER YOU GRADUATE?
ORGANIZATIONS WHERE OUR GRADUATES NOW WORK
Ph. D (4 years) PDEng MSc (2 years) BSc (3 years) (2 Years) BROADEN YOUR KNOWLEDGE BY PURSUING A PHD OR PDENG
4. ADMISSION CRITERIA FOR BSC AND HBO GRADUATES
ADMISSION CRITERIA FOR BSC STUDENTS BSC MECHANICAL ENGINEERING BSC OTHER TECHNICAL STUDIES • Direct admission to the MSc ME • Admission after following: • Pre-master courses and/or • Obligatory BSc courses within the master and/or • Obligatory MSc courses combined with self study of missing BSc knowledge https: //www. utwente. nl/en/education/master/how-to-apply/
ADMISSION CRITERIA FOR UT BACHELORS DETAILED INFORMATION DIRECTLY AVAILABLE FOR THESE PROGRAMMES • • • Advanced Technology Applied Physics Biomedical Engineering Civil Engineering Electrical Engineering Industrial Design Grab the handout for your BSc programme Or visit www. utwente. nl/en/me/rulesregulations/admission-ut-bachelors/
Differences between HBO and WO Different level: more abstract, fundamental, higher teaching speed Same discipline, BUT Transition professional: scientific, reflection, methods, approach, generalization Knowledge from practice and industry (possible dispensation for internship)
ADMISSION FOR HBO STUDENTS FOLLOWING A PRE-MASTER DESIGNED FOR BASIC KNOWLEDGE OF MECHANICAL ENGINEERING SATISFACTORY FOR ADMISSION TO ALL MSC ME SPECIALIZATIONS Top students at hbo FOR WHOM Recommended: Mathematics / Physics / English at ‘vwo’ level Recommended: average grade for relevant courses ≥ 7. 5 Finalized hbo-programme in related programme or during minor HOW 30 EC in pre-master courses as pre-master or minor Obligatory BSc courses within the Master instead of internship
THE PRE-MASTER PROGRAMME FOR HBO ‘WERKTUIGBOUWKUNDE’ STUDENTS DESIGNED FOR BASIC KNOWLEDGE OF MECHANICAL ENGINEERING A SELECTION OF COURSES FROM BSC ME (30+19 EC) Together with BSc ME students Lots of mathematic s Specifically for hbo students Academic research skills Extending basic knowledge Thermo dynamics System analysis Elasticity theory Possible individual adaptation s
5. QUESTIONS?
• High-Tech Systems and Materials dr. ir. Jurnan Schilder: j. p. schilder@utwente. nl • Energy and Flow prof. dr. ir. Kees Venner: c. h. venner@utwente. nl • Design and Manufacturing dr. ir. Tom Vaneker: t. vaneker@utwente. nl QUESTIONS ABOUT • Aeronautics prof. dr. ir. Kees Venner: c. h. venner@utwente. nl OUR SPECIALIZATIONS? • Robotics prof. dr. ir. Herman van de Kooij: h. vanderkooij@utwente. nl • Personalised Health Technology prof. dr. ir. Bart Koopman: h. f. j. m. koopman@utwente. nl • Maintenance Engineering & Operations dr. Alberto Martinetti: a. martinetti@utwente. nl
IF YOU HAVE ANY OTHER QUESTIONS FEEL FREE TO CONTACT US • Lisa Gommer, programme director e. m. gommer@utwente. nl • Monique Duyvestijn, student adviser master students m. j. b. duyvestijn@utwente. nl • Adelien Heutink, master coordinator





















