United Nations Economic Commission for African Centre for

  • Slides: 22
Download presentation
United Nations Economic Commission for African Centre for Statistics Session 5: Progress Report for

United Nations Economic Commission for African Centre for Statistics Session 5: Progress Report for Phase I of African Project on SNA (actions, achievements, challenges) Katalin Bokor Economic Statistics and National Accounts Section African Centre for Statistics AGNA meeting 12 -15 May 2015

Outline of the presentation • I. Actions and achievements – – – Country plans

Outline of the presentation • I. Actions and achievements – – – Country plans and follow-up actions (Pillar 1) Capacity building (Pillar 2) Institutional strengthening (Pillar 3) Compiling technical documents and practical guidebooks (Pillar 4) Advocacy (Pillar 5) Monitoring, evaluation, and reporting (Pillar 6) • II. Challenges – Countries’ needs for training, TA and financial assistance – Challenges and actions to resolve issues African Centre for Statistics

I/1. Country plans and actions • As of March 2015, 22 countries reported to

I/1. Country plans and actions • As of March 2015, 22 countries reported to have already formulated country plans – Algeria, Benin, Burkina Faso, Burundi, Cameroon, Egypt, Ethiopia, Kenya, Lesotho, Liberia, Mali, Morocco, Mauritius, Nigeria, Uganda, South Africa, South Sudan, Swaziland, Tanzania, Tunisia and Zimbabwe • 16 countries are currently elaborating country plans – Angola, Botswana, Central African Republic, Congo, Cote d’Ivoire, Gabon, Gambia, Ghana, Madagascar, Mauritania, Mozambique, Senegal, Seychelles, Sierra Leone, Togo and Zambia African Centre for Statistics

I/1. Country plans and actions (Cont’d) Figure 1: Activities that have been incorporated in

I/1. Country plans and actions (Cont’d) Figure 1: Activities that have been incorporated in the national action plans and have been followed up Data collection and processing GDP (P) by industries ISIC rev 4 and CPC rev 2 38 24 38 23 38 21 GDP (P) by institutions GDP (E) 32 26 31 21 Production and generation of income accounts Sector accounts up to financial accounts Included in national action plan 34 23 Sector accounts up to capital accounts Employment matrix 36 27 Quarterly GDP SNA boundaries 37 25 SUT IT tool for compilation 37 28 28 30 24 22 23 21 Follow-up action taken 30 28 African Centre for Statistics

I/1. Country plans and actions (Cont’d) • Most countries have already taken one or

I/1. Country plans and actions (Cont’d) • Most countries have already taken one or more of the following actions: – Strengthening the institutional framework and management structure for national accounts; – Adhering to international classifications (activities, products, etc. ); – Harmonizing with other statistical systems such as the balance of payments, public finances, etc. ; – Administering statistical operations including censuses, surveys, studies, etc. ; – Improving conditions to access different data sources; – Updating the business register; – Conducting training for national accountants; – Changing to a new base year and software for compilation of national accounts. African Centre for Statistics

I/1. Country plans and actions (Cont’d) Figure 2: Timeline of transitioning to the 2008

I/1. Country plans and actions (Cont’d) Figure 2: Timeline of transitioning to the 2008 SNA Period Number of countries Percentage (%) 2010 -2013 2014 2015 2016 2017 2018 To be decided Total 6 6 11 7 2 2 10 44 14 14 25 16 5 5 23 100 African Centre for Statistics

I/1. Country plans and actions (Cont’d) • Survey on countries’ needs assessment (Dec 2014

I/1. Country plans and actions (Cont’d) • Survey on countries’ needs assessment (Dec 2014 – March 2015) • Survey on partners’ assistance provision (April-May 2015) Matching demands to supply African Centre for Statistics

I/2. Capacity building • AFRISTAT: strategy based to implement the 2008 SNA in its

I/2. Capacity building • AFRISTAT: strategy based to implement the 2008 SNA in its Member States – Progressive approach to consolidate knowledge and correct shortfalls – Six pillars: » (i) help Member States to migrate with success from the 1993 SNA to the 2008 SNA; » (ii) reinforce institutional and organizational capacity of national accounts sections; » (iii) assist countries to put in place an operational and efficient system to produce and analyse national accounts; » (iv) develop an operational system for the publication of national accounts; » (v) assist and monitor the implementation of the 2008 SNA; and » (vi) coordinate assistance with other partners. African Centre for Statistics

I/2. Capacity building • Training Workshop on the Implementation of the 2008 SNA (2123

I/2. Capacity building • Training Workshop on the Implementation of the 2008 SNA (2123 January 2014, Nouakchott, Mauritania) – By ECA SRO-NA and ECA ACS. – 31 participants from NSOs, Ministries of Planning and Central Banks of 11 francophone African countries. • Training on the System of Environmental-Economic Accounting (SEEA) – By ECA in collaboration with GIZ and the United Nations Statistical Division – (i) an online training over 8 weeks and 5 modules during September. November 2014; – (ii) an on-site workshop on 2 -5 February 2015 in Addis Ababa, Ethiopia. – 20 African countries have participated and completed the online training course and on-site training workshop. African Centre for Statistics

I/2. Capacity building • Seminar on Supply and Use Table (10 -14 November 2014

I/2. Capacity building • Seminar on Supply and Use Table (10 -14 November 2014 in Mauritius) – By IMF AFRITAC South • Workshop on the preparation of quarterly national accounts (1923 January 2015 in Bamako, Mali) – By IMF AFRITAC Central, AFRITAC West and AFRISTAT – National accountants from 9 Member States. • Seminar on quarterly GDP (16 -20 March 2015 in Mauritius) – By IMF AFRITAC South African Centre for Statistics

I/3. Institutional strengthening • ECA launched a “community of practice” on the compilation of

I/3. Institutional strengthening • ECA launched a “community of practice” on the compilation of supply and use tables as well as the use of administrative data in national accounts. • The purpose is to produce country contributions, in the form of case studies and sharing country experience for the two technical documents and practical guidebooks. African Centre for Statistics

I/4. Compiling technical documents • Exhaustive survey on the use of administrative data in

I/4. Compiling technical documents • Exhaustive survey on the use of administrative data in the compilation of national accounts carried out among African countries – December 2013 -January 2014 – 46 responses • Expert Group Meeting (EGM) on Administrative Data – By ECA in collaboration with the Sub-Regional Office for Eastern Africa (SRO-EA) – 23 -27 June 2014, Kigali – 16 countries African Centre for Statistics

I/4. Compiling technical documents (Cont’d) • Expert Group Meeting (EGM) on Supply and Use

I/4. Compiling technical documents (Cont’d) • Expert Group Meeting (EGM) on Supply and Use Tables – ECA in collaboration with the Sub-Regional Office for Southern Africa (SROSA) – 2 -6 June 2014, Port Louis – 25 countries • Drafts of Guidebook of administrative data and Handbook on supply and use table (SUT) are being finalized. African Centre for Statistics

I/4. Compiling technical documents (Cont’d) • AFRISTAT: – Member States are validating a Methodological

I/4. Compiling technical documents (Cont’d) • AFRISTAT: – Member States are validating a Methodological Guide on the Production of National Accounts in AFRISTAT Member States (According to the 2008 SNA) – On-going work on a Methodological Guidebook on the Retropolation of National Accounts African Centre for Statistics

I/6. Monitoring, evaluation, and reporting • Inaugural Meeting of the CSC in September 2013:

I/6. Monitoring, evaluation, and reporting • Inaugural Meeting of the CSC in September 2013: CSC will meet every 6 month during Phase I, and once a year in Phase II of the Project • To. Rs of the CSC were established during its Inaugural Meeting held in September 2013 in Addis Ababa. • 2 nd CSC Meeting (or the Friends of the Chair of the CSC) was held on 2 -4 April 2014 in Addis Ababa • 3 rd CSC Meeting convened on 8 -9 December 2014 in Tunis African Centre for Statistics

I/6. Monitoring, evaluation, and reporting (Cont’d) • Progress report template for the African Project

I/6. Monitoring, evaluation, and reporting (Cont’d) • Progress report template for the African Project endorsed by the Friends of the Chair meeting – Updated on a biannual basis by the Secretariat – Presented to both AGNA and the CSC • As part of the transition to Phase II of the project, consultation with stakeholders about the experience, progress and gaps observed so far – Report will be circulated African Centre for Statistics

II/1. Challenges Figure 3: Training needs of countries (by activity and planned date for

II/1. Challenges Figure 3: Training needs of countries (by activity and planned date for moving to 2008 SNA) 7 Quarterly GDP Sector accounts up to financial accounts 5 7 Employment matrix 7 GDP (P) by institutions 8 6 Data Collection and processing 6 ISIC rev 4 and CPC rev 2 6 6 GDP (P) by industries 6 Already moved 12 5 2015 -2018 5 8 4 7 5 9 4 8 5 9 5 GDP (E) 5 10 8 SUT 5 14 6 Production and generation of income accounts IT tool for compilation 5 16 SNA boundaries Sector accounts up to capital account 17 4 10 2 7 4 4 4 Undecided African Centre for Statistics

II/1. Challenges Figure 4: Technical assistance needs of countries (by activity and planned moving

II/1. Challenges Figure 4: Technical assistance needs of countries (by activity and planned moving date) Sector accounts up to financial accounts SNA boundaries Quarterly GDP Employment matrix GDP (E) Sector accounts up to capital account Data Collection and processing SUT GDP (P) by institutions Production and generation of income accounts IT tool for compilation ISIC rev 4 and CPC rev 2 GDP (P) by industries Already moved 9 18 6 7 4 17 15 9 12 11 11 10 9 2015 -2018 5 3 14 6 6 6 7 7 6 5 7 5 4 9 9 11 8 6 Undecided 4 4 3 2 4 3 3 2 African Centre for Statistics

II/1. Challenges Figure 5: Financial assistance needs of countries (number of countries by activity)

II/1. Challenges Figure 5: Financial assistance needs of countries (number of countries by activity) African Centre for Statistics

II/2. Challenges and actions to resolve issues 1. Institutional coordination: – – Avoid duplication

II/2. Challenges and actions to resolve issues 1. Institutional coordination: – – Avoid duplication of activities, improve communication Secretariat has proposed to the three pan-African institutions (Af. DB, AUC, ECA) to sign a Memorandum of Understanding (Mo. U) to assist African countries to implement the 2008 SNA 2. Reporting mechanism: – – A template has been developed to provide stakeholders a tool to follow the progress made Stakeholders are invited to report biannually to the Secretariat on activities African Centre for Statistics

II/2. Challenges and actions to resolve issues 3. Supporting countries to play a key

II/2. Challenges and actions to resolve issues 3. Supporting countries to play a key and central role in the project – the report on the needs assessment of countries is expected to help to match countries’ individual needs to partners capacity for assistance provision. 4. Financial resource mobilization – the expected Mo. U can help pan-African institutions to show their engagement for the project and pool together resources African Centre for Statistics

United Nations Economic Commission for African Centre for Statistics Thank you Participants are invited

United Nations Economic Commission for African Centre for Statistics Thank you Participants are invited to: • Comment on the progress that has been made • Comment on challenges not mentioned above • Provide advice on how to improve and strengthen the implementation of the Project