TQCD for LHC Simone Montesano ENSTI 15 Sep20

  • Slides: 10
Download presentation

TQCD for LHC Simone Montesano - EN/STI 15 -Sep-20 S. Montesano - Reunion ICL

TQCD for LHC Simone Montesano - EN/STI 15 -Sep-20 S. Montesano - Reunion ICL Machine LHC 2

Status • The ECR LHC-TEC-EC-0001 EDMS n. 1329235 requested space reservation for 2 Cherenkov

Status • The ECR LHC-TEC-EC-0001 EDMS n. 1329235 requested space reservation for 2 Cherenkov detectors in LHC: • • TECDV. 5 L 7. B 1 – start DCUM 19889. 1664 TECDH. 4 L 7. B 1 – start DCUM 19980. 4224 The names of the devices was recently changed to TQCD (T because it intercepts the beam, Quartz Cherenkov Detector). We would like to start working on these devices: • • • Similar devices (i. e. same functionality) installed in SPS (TQCD. 51991) and in preparation for TT 20 (TQCD. 210271) New design for LHC to be prepared by the end of 2016 Installation could be requested for the YETS 2017 -2018 15 -Sep-20 S. Montesano - Reunion ICL Machine LHC 3

Input needed • Available space • • Vacuum constraints Ambient condition (temperature, humidity) •

Input needed • Available space • • Vacuum constraints Ambient condition (temperature, humidity) • • Space available around the beam pipe Transversal view of the tunnel, path for optical fibres CV contacted Radiation environment • FLUKA team contacted 15 -Sep-20 S. Montesano - Reunion ICL Machine LHC 4

Detector principle 15 -Sep-20 S. Montesano - Reunion ICL Machine LHC 5

Detector principle 15 -Sep-20 S. Montesano - Reunion ICL Machine LHC 5

Current devices Bellow TQCD. 51991 Optical window (quartz) Motor Optical fibres TQCD. 210271 Photomultiplier

Current devices Bellow TQCD. 51991 Optical window (quartz) Motor Optical fibres TQCD. 210271 Photomultiplier box 15 -Sep-20 S. Montesano - Reunion ICL Machine LHC 6

Space availability Optical fibres: length? Tunnel section at TECGV. 6 L 7. B 1

Space availability Optical fibres: length? Tunnel section at TECGV. 6 L 7. B 1 Nicolas Joannon 15 -Sep-20 Photomultiplier box S. Montesano - Reunion ICL Machine LHC 7

TECDH. 4 L 7. B 1 Nicolas Joannon 15 -Sep-20 S. Montesano - Reunion

TECDH. 4 L 7. B 1 Nicolas Joannon 15 -Sep-20 S. Montesano - Reunion ICL Machine LHC 8

TECDV. 5 L 7. B 1 Nicolas Joannon 15 -Sep-20 S. Montesano - Reunion

TECDV. 5 L 7. B 1 Nicolas Joannon 15 -Sep-20 S. Montesano - Reunion ICL Machine LHC 9