RPC DCS structure ECS DCS HCAL Access handling Functionality (FSM) Alarm handling PVSS +

RPC DCS structure ECS DCS HCAL Access handling Functionality (FSM) Alarm handling PVSS + FW DAQ ECAL MU TK CSC RPC DT Logging Barrel Config. TRG …. Pixel Detector Endcap HV Cu LV Cu T Cu Subsystem HV Du LV Du T Du Device Physical device 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 2

RPC DCS Physical devices Muon DCS RPC Barrel Wheel +2 Wheel +2 DT CSC

RPC DCS Physical devices Muon DCS RPC Barrel Wheel +2 Wheel +2 DT CSC HV LV T RPC Endcap gas cool rack ext. DCS nodes Local DAC node with 5 partitions one per wheel 9/13/2021 FEC XDAQ EASY system 12 crates 20 crates 300 sensors 80 boards 60 boards 10 ADC 480 ch. 720 ch. P. Paolucci & G. Polese - INFN di Napoli About 5000 FEBs 3

RPC FSM structure • Each single element of the structure, in the FSM approach,

RPC FSM structure • Each single element of the structure, in the FSM approach, is a different parts of the detectors, structured as logical software units, arranged in a tree-like structure. • Each logical unit is characterized by a set of well defined states. • The RPC states machine is not yet in place but the structure is ready and it will be implemented as soon as 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli possible 4

RPC DCS software status I RPC DCS is developed as a hierarchy where every

RPC DCS software status I RPC DCS is developed as a hierarchy where every object is represented as a node of the tree, following the CMS structure. Its architecture has been developed using the PVSS II and SMI++ toolkit in the JCOP framework. PVSS II version 3. 0 and Framework release 2. 0. 9 All the parameters and variables (HV, LV and T) of the CAEN mainframe SY 1527 are linked, by OPC server, to a set of PVSS datapoint through of the Framework configuration facilities. 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 5

RPC DCS software status II All the panel actions have been developed with custom

RPC DCS software status II All the panel actions have been developed with custom scripts. Naming and color framework conventions are respected !! All structures have been tested using, in a first time, an ad hoc simulator and then the SY 1527 Power Supply. Alarm conditions on HV and LV devices have been set. PVSS archiving has been used waiting for the framework interface with Oracle. 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 6

Main RPC DCS panel • The RPC panel is under construction and it will

Main RPC DCS panel • The RPC panel is under construction and it will include some sub-panel to set values for the whole RPC system; • The status of the RPC node is also our top level status; • Access to the Wheel node (panel). We are investigating the possibility to set alarms on some datapoints (Imon, Vmon…. ) where the ranges are related to other datapoints (I 0 set, V 0 set…) 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 7

HV Wheel node • The wheel panel contains info about the parent and the

HV Wheel node • The wheel panel contains info about the parent and the children nodes with the relative state condition. • The alarm status of every RPC is defined by the framework colors. • Wheel name is an external variable • All objects will be clickable. 9/13/2021 The Set/Monitor panel provide the possibility to give a look at all the wheel channels. P. Paolucci & G. Polese - INFN di Napoli 8

Set/Monitor button Tab menu for select device type The most relevant parameters and the

Set/Monitor button Tab menu for select device type The most relevant parameters and the relative conditions are shown here. The status of each channel has been set with the relative color: OK, Tripped, Overcurrent, Over. Voltage, Under. Voltage, Ramp. Up, Ramp. Down 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 9

Wheel Global setting From the Global settings panel it is possible to set the

Wheel Global setting From the Global settings panel it is possible to set the values of all the HV and LV channels of the wheel and switch ONOFF all the channels of the selected wheel. 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 10

Channel Details Left Click Details panel shows all the variables of the selected channel,

Channel Details Left Click Details panel shows all the variables of the selected channel, its position in the wheel, alarm conditions, the VMON/IMON history plots and allow to set every 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 11 single parameters of this channel.

Sector Node The Sector node has 8 children (RPC chambers). Some parameters and the

Sector Node The Sector node has 8 children (RPC chambers). Some parameters and the status of each RPC are shown here. 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 12

Chamber Node Summary alarm with possibility of masking whole chamber. • Fully description of

Chamber Node Summary alarm with possibility of masking whole chamber. • Fully description of a chamber. • We have implemented the possibility to mask/unmask each single element using the left click of the element status. • Simple Info about temperature value and sensor status. 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 13

Devices (Leafs) Set and confirm values for all channel parameters Possibility of mask/unmask and

Devices (Leafs) Set and confirm values for all channel parameters Possibility of mask/unmask and acknowledge each single parameter or all together Additional panel for switch the state of the channel and load settings from the hardware 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 14

To be Done ü A PVSS prototype is almost ready (dec 04) and is

To be Done ü A PVSS prototype is almost ready (dec 04) and is in test with a SY 1527 (HV and LV boards) system; ü An EASY system (HV, LV and ADC) has been installed in Naples in November 04 and is under test with Lab. VIEW; ü Move to the EASY hardware system (when ? ? ); ü Implement the RPC State Machine (Jan 05); ü Thing about the Archiving and the Mass configuration; ü Be ready for the RPC DCS period to spend at CERN with the JCOP people (March 05) 9/13/2021 P. Paolucci & G. Polese - INFN di Napoli 15