RPC project organization 20112012 P. Paolucci

RPC project organization 20112012 P. Paolucci

RPC Institution Board IB Rules are written in the CMS constitution All the Institution

RPC Institution Board IB Rules are written in the CMS constitution All the Institution leaders are member of the RPC IB We meet at least 4 times (CMS week) National representative can be invited ? Yes Managers and experts can be invited to discuss special arguments • IB chairman will be vote in the March CMS week and he will follow all these aspects: • • • – Meeting organization – Work very close to the PM – Special issue (papers, conferences……) 7/12/10 RPC IB - Pigi Paolucci 2

Introduction Steps toward the new RPC project organization • Today – – – Endorse

Introduction Steps toward the new RPC project organization • Today – – – Endorse RPC project organization chart Endorse deputies PM Endorse new RC Endorse deputy RC and TC Open call for the IB, EB, CC, Upgrade, Steering chairmen • January 19 th – Deadline for chairmen nominations – Deadline for DPG, TC, RC & Upgrade LV 3 coordinators • March CMS week – Vote chairmen – Endorse the full list of DPG, TC, RC & Upgrade coordinators 7/12/10 RPC IB - Pigi Paolucci 3

Conference Committee Editorial board chairman Istitution Board chairman Resource manager P. Paolucci Project Manager

Conference Committee Editorial board chairman Istitution Board chairman Resource manager P. Paolucci Project Manager P. Paolucci Steering committee deputy/deputy DPG Run Coordinator Tech. Coordination Upgrade D. Piccolo K. Bunkowski G. Pugliese deputy S. Buontempo deputy Resp. deputy 7/12/10 RPC IB - Pigi Paolucci 4

Project Manager Resource manager (P. Paolucci) Steering committee (P. Paolucci) deputy/deputy DPG Run Coordinator

Project Manager Resource manager (P. Paolucci) Steering committee (P. Paolucci) deputy/deputy DPG Run Coordinator Tech. Coordinator S. D. Piccolo K. Bunkowski G. Pugliese deputy Buontempo deputy Online new Physic Valid Tool Resp. K. Bunkowski new Maint & repar Resp. CAF Resp. Elect. Coord. new Paolucci Offline D. Piccolo Detector & trigger analysis C. Carillo P 5 Resp. new Gas Resp. Upgrade new Resp. …………. 7/12/10 RPC IB - Pigi Paolucci Resp. 5

2011 -2012 LV 2 Positions to endorse today • Deputies Project Manager G. Pugliese

2011 -2012 LV 2 Positions to endorse today • Deputies Project Manager G. Pugliese (Bari) and M. Tytgat (Ghent) • Run Coordinator: L. Benussi (LNF) Deputy Run Coordinator: March 2011 • Tech. Coordinator: S. Buontempo (Napoli) Deputy Technical Coordinator: A. Dimitrov (Sofia) 7/12/10 RPC IB - Pigi Paolucci 6

DPG organization chart • New DPG organization chart (2011 -2012) based on 4 correlated

DPG organization chart • New DPG organization chart (2011 -2012) based on 4 correlated sectors: Online – Offline – Physic validation tools (new) – detector & trigger analysis (new) • We would like to endorse the chart today • Define and endorse all the responsibilities at the first 2011 DPG meeting – Korea interest in DQM (Korea Univ. ) and Trigger analysis (SKK Univ. ) – What about all the other people interested in participating to the RPC analysis ? 7/12/10 RPC IB - Pigi Paolucci 7

Online K. Bunkowski Configuration K. Bunkowski DPG Run Coordinator (G. (D. Piccolo) K. Bunkowski

Online K. Bunkowski Configuration K. Bunkowski DPG Run Coordinator (G. (D. Piccolo) K. Bunkowski Pugliese) deputy Offline Piccolo Local Reco C. Carrillo Detector & trigger analysis Resp. Detector perfomance Phys Valid Tool Resp. DQM Cimmino Calabria Detector DB Software. Validation/ Data Certification J. Gho Trigger perfomance Resp. Run Quality Korea Simulation Trigger DB Pavlov Calibration Streams M Szlepper Maggi Noise tools Costantini Data. Base DCS WBM Berzano Upgrade Simulation 7/12/10 Skims Tupputi Covered RPC IB - Pigi Paolucci Manpower 8 needed Not covered

Technical Coordination S. Buontempo A. Dimitrov Mainten. & repair. (RE, RE) Anton & Hassan

Technical Coordination S. Buontempo A. Dimitrov Mainten. & repair. (RE, RE) Anton & Hassan Test Beams Nicolas cooling Ian Gas Luigi Documentati on Anton Trigger Karol /Warsaw Equipment Data. Base ? Electronics Pigi/? DCS ? Covered 7/12/10 Manpower 9 needed Not covered

Action Items DPG • Run quality criteria definitions • Endcap efficiency studies (working point,

Action Items DPG • Run quality criteria definitions • Endcap efficiency studies (working point, muongraphy, HV scans) Run coordination • CAF organization (instruction update, DQM efficiency debug, WBM debut) • P 5 Operation manager duties Technical coordination • CAEN board test setup at 904 (Hassan) • Distribution board production and plan (F. Loddo) 7/12/10 RPC IB - Pigi Paolucci 10

Steering Committee • Task Force: Run quality criteria (M. Maggi, D. Piccolo, A. Cimmino,

Steering Committee • Task Force: Run quality criteria (M. Maggi, D. Piccolo, A. Cimmino, Taejong) Endcap efficiency studies (D. Piccolo……. ) • Goals definition at the first DPG meeting in Jan. • Be-weekly Report at PDG • Deadline (report) for March CMS week 7/12/10 RPC IB - Pigi Paolucci 11

DPG Not covered tasks DPG 2011 (FTE) 2012 (FTE) WBM 0. 7 0. 3

DPG Not covered tasks DPG 2011 (FTE) 2012 (FTE) WBM 0. 7 0. 3 Berzano* + ? Offline DB 1. 0 0. 5 ? DCS 0. 7 0. 3 ? Upgrade Sim 0. 5 ? Run quality 0. 5 0. 3 ? Detector perf. 2 2 Calabria + ? Trigger perf. 2 2 Warsaw + ? DQM 1 1 A. Cimmino + ? Noise 0. 3 + 0. 5 S. Costantini + ? 7/12/10 RPC IB - Pigi Paolucci 12

TC covered tasks DPG 2011 (FTE) 2012 (FTE) TC Buontempo RB 1. 0 Anton

TC covered tasks DPG 2011 (FTE) 2012 (FTE) TC Buontempo RB 1. 0 Anton RE 1. 0 Hassan Gas 0. 5 Luigi Cooling 0. 3 Ian Trigger 2 2 Karol + ? Electronic 0. 4 Pigi + ? DB 0. 7 0. 3 ? Test Beam 0. 3 + 0. 5 ? 7/12/10 RPC IB - Pigi Paolucci 13

2011 Manpower/Expert Resident at CERN (>40%) • • • • Korea Univ: Taejong (70%),

2011 Manpower/Expert Resident at CERN (>40%) • • • • Korea Univ: Taejong (70%), Mee Hee Cho (50%), Hyung Chul Kim (30%) SKK Univ: Chandigar: Mumbai BARC: Pavia: China: Sofia Univ: Dimitrov INRNE: Stoianov Egypt: Ghent: Costantini, Cimmino, Zaganidis, Phd Napoli: Buontempo, Paolucci, Carrillo LNF: Benussi, Piccolo Uniandes: Ocampo, Gomez, Phd ? Pakistan: Horani, Shahzad Brussels: Van Doninck, Luc Van Lancker Bari: Pugliese, Iaselli, Maggi, Colaleo, Calabria, Lusito, Tupputi 7/12/10 RPC IB - Pigi Paolucci 14

2011 Manpower/Expert (not resident) • • • • Korea Univ: SKK Univ: Chandigar: Mumbai

2011 Manpower/Expert (not resident) • • • • Korea Univ: SKK Univ: Chandigar: Mumbai BARC: Pavia: Vitulo China: Sofia Univ: Litov, Pavlov, Petkov, Hadjiisk INRNE: Stoianov, Genchev, Sultanov Egypt: Ghent: Tytgat Napoli: Fabozzi LNF: Bianco Uniandes: Pakistan: Horani, Shahzad, Saleh Brussels: Luc Van Lancker Bari: Abbrescia 7/12/10 RPC IB - Pigi Paolucci 15

Conclusion • We have a lot to work to organize our project for the

Conclusion • We have a lot to work to organize our project for the next two years of data tacking. • Steering committee has to help us in solving problems. • Planning and setting priorities is crucial. • New meeting organization • New organization chart 7/12/10 RPC IB - Pigi Paolucci 16