Plan and status of WIGOS Implementation MYANMAR RA

  • Slides: 23
Download presentation
Plan and status of WIGOS Implementation MYANMAR RA II WIGOS Workshop 6 -8 November

Plan and status of WIGOS Implementation MYANMAR RA II WIGOS Workshop 6 -8 November 2018, Beijing, China

Outline Introduction to the country Organization of DMH Status 1 Status 2 Status 3

Outline Introduction to the country Organization of DMH Status 1 Status 2 Status 3 Status 4 Current issue Plan 1 Plan 2 Conclusion

MYANMAR China Population 54, 013, 647 (Oct 30, 2018) Total land area 653, 290

MYANMAR China Population 54, 013, 647 (Oct 30, 2018) Total land area 653, 290 km 2 36. 8% of the population is urban Bangladesh Coastline Thailand 1, 930 km (1200 mi) Longest river Ayeryarwady Largest lake Indawgyi lake Dry March to April Rainy June to October Winter November to February Myanmar (formerly Burma) is a Southeast Asian nation of more than 100 ethnic groups, bordering India, Bangladesh, China, Laos and Thailand. Yangon (formerly Rangoon), the country's largest city, is home to bustling markets, numerous parks and lakes, and the towering, gilded Shwedagon Pagoda, which contains Buddhist relics and dates to the 6 th century.

Total staff of DMH 848

Total staff of DMH 848

Status 1 Project name: The Project for Establishment of Disastrous Weather Monitoring System Period/

Status 1 Project name: The Project for Establishment of Disastrous Weather Monitoring System Period/ budget : 2013 - 2018 / 3, 842, 000 Japanese Yen Donated by : JICA Three radar in remote site , radar receiving system in head office and 30 of Automatic weather system

VSAT Radar network Kyaukphyu Mandalay Yangon Composite

VSAT Radar network Kyaukphyu Mandalay Yangon Composite

Improved accuracy of weather observation data from instrument and radars record/reports of maintenance (surface

Improved accuracy of weather observation data from instrument and radars record/reports of maintenance (surface observation) Daily/weekly/monthly/annual reports on radar Daily and monthly physical check Clean AWS tower base Cut grass around tower Check for damage on tower Clean solar panel Check for ants and other pests Check data logger screen Clean outside and inside enclosure 30 AWS stations

Status 2 Project name : International Development Association (IDA) Immediate Response Mechanism (IRM) MYANMAR

Status 2 Project name : International Development Association (IDA) Immediate Response Mechanism (IRM) MYANMAR and the United Nations office for project Services(UNOPS) Period : 2017 Automatic weather observation system Flood Early Warning System 90 10 Web Forecaster tool : COROBOR systems Keep Metadata AWS (Met and Hydro) stations and ASOS 20 stations

Status 3 Project name : Modernization of Forecasting and Warning System for Natural Disaster

Status 3 Project name : Modernization of Forecasting and Warning System for Natural Disaster in MYANMAR Donated by : Korea Meteorological Administration(KMA) and Korea Meteorological Industry Promotion Agency(KMIPA) Duration/budget : 2017 -2019 / 4 million US Dollars Automatic Synoptic Observation System (ASOS) - 20 already installed 20 on going to install Total - 40 ASOS station Display of ASOS 20 stations

Status 4 Three of tide observation stations Sittwe moulmein Haing gyi kyun Currently Hydro

Status 4 Three of tide observation stations Sittwe moulmein Haing gyi kyun Currently Hydro observation stations 74

https: //www. moezala. gov. mm

https: //www. moezala. gov. mm

Currently issues -No database ( we keep data with portable Hard drive currently) -No

Currently issues -No database ( we keep data with portable Hard drive currently) -No data quality monitoring system -No upper air observation -No calibration lab -No lighting detection -Different projects, different systems , others( to be integrated system)

PLAN 1 is on going Hydromet Observation and Information Systems Modernization of the project

PLAN 1 is on going Hydromet Observation and Information Systems Modernization of the project “ Ayeyarwady Integrated River Basin Management Project” (AIRBM) Automatic weather Stations Calibration Lab Upper air Server room Data center Meteorological observation station 39 Hydro observation station 17 Agro meteorological observation station 1 supplementary 1 1 (Yangon) 2 ( Yangon and Mandalay) 1 (Head office in Nay Pyi Taw)

Integrated end-to-end observation and production system JICA KOREA CHINA IRM RIMES others AWS RADAR

Integrated end-to-end observation and production system JICA KOREA CHINA IRM RIMES others AWS RADAR Satellite GTS

From an old –fashioned manual observation network to a modern and automated monitoring system

From an old –fashioned manual observation network to a modern and automated monitoring system Manual stations Automatic stations 155 around 250 Manual observation should be automated by 2020.

PLAN 2 Project name : The Project for Enhancing Capacity of Weather Observation and

PLAN 2 Project name : The Project for Enhancing Capacity of Weather Observation and Forecasting in MYANMAR Period : Donated by: 2019 - 2020 JICA -To develop operation and maintenance guidelines of three meteorological radars for obtaining reliable data -To identify issues in operation and maintenance of automatic weather observation and surface observation systems at the pilot stations -To develop manuals of regular inspection, calibration and maintenance of weather observation equipment -To establish traceability method of observation equipment and to develop manuals -To conduct tracing on radar data analysis -To conduct training on method to obtain reliable meteorological radar data using automatic weather observation data and other weather data. -To improve QPE information continuously -To conduct training on utilization of new Himawari. Cast for weather forecasting -To introduce weather guidance system

Conclusion - Manual observation should be automated by 2020. - Total AWS station over

Conclusion - Manual observation should be automated by 2020. - Total AWS station over 200 - database - data quality monitoring system - upper air observation - calibration lab - lighting detection network - All different system will be integrated system Future issue - Maintenance fee

Thank you papaswe 03@gmail. com

Thank you papaswe 03@gmail. com

Outline I. III. IV. V. VI. Introduction to the country and the NMHS Physical

Outline I. III. IV. V. VI. Introduction to the country and the NMHS Physical context of the country National requirements for observations Summary of national observing capabilities Status of National implementation of WIGOS Other remarks

Physical context of the country (with pictures, maps – 1 or 2 slides maximum)

Physical context of the country (with pictures, maps – 1 or 2 slides maximum) I. III. IV. V. VI. Surface area, Mountains, Lakes, Rivers, Coast Other relevant factors

National requirements for observations (1 or 2 slides maximum) I. National priority application areas

National requirements for observations (1 or 2 slides maximum) I. National priority application areas • • II. Health? Agriculture? Hydrology? Transports? … Most relevant measurements: • • Temperature, humidity, precipitation, wind Pressure, radiation, …

Summary of national observing capabilities (preferably maps – 2 or 3 slides in total)

Summary of national observing capabilities (preferably maps – 2 or 3 slides in total) Networks description (current and planned) Map of meteorological/climatological operational stations (identifying the technology used): • o o o • Surface observing stations Precipitation stations Upper-air/radiosonde stations Weather Radars Lightning detection networks Map of other surface operational stations: o Hydrological stations o Sea stations o Atmospheric composition and other stations

Status of National implementation of WIGOS (1 or 2 slides maximum) I. III. IV.

Status of National implementation of WIGOS (1 or 2 slides maximum) I. III. IV. National Observing Strategy adopted/approved; National WIGOS Implementation Plan adopted/approved ; National WIGOS governance mechanism: in place; National WIGOS partnership agreements for integration and opensharing of observations from NMHSs and non-NMHSs sources: in place ; V. OSCAR/Surface being populated and updated with WIGOS metadata for which observations are exchanged internationally I. Number of reporting stations updated by Member in OSCAR/Surface. II. Number of reporting stations in OSCAR/Surface with all mandatory metadata. III. Number of staff trained in OSCAR/Surface. VI. WIGOS Station Identifiers: implemented VII. WIGOS Data Quality Monitoring System (WDQMS): national process in place, for acting on quality problem information received from WDQMS; VIII. National focal points nominated (WIGOS NFP and OSCAR/Surface NFP)