NTTML AT A GLANCE • Established in 2010. Commenced Production in 2012. • Factory

NTTML AT A GLANCE • Established in 2010. Commenced Production in 2012. • Factory in Gazipur (one hour away from the Zia International Airport) • Own Power Plant (18 mw/day) & Water Plant • $30 Million Revenue in 2013 • Capacity of 70 Tons of Terry and 25 Tons Dyed Yarn per day • Biggest producer of Terry Towels in Bangladesh • Latest production technology in use • • Dobby Looms Jacquard Looms Electrical Dobby with Terry Motion Direct warping • • Sectional warping Sizing Spinning Printing (Max. 6 colors. 5 Ton Capacity)

Month-wise Sales Performance (2014) 6 5. 01 5 4 3 3. 34 2. 2

Month-wise Sales Performance (2014) 6 5. 01 5 4 3 3. 34 2. 2 2. 18 2. 37 January February March 4. 01 3. 28 2 1 0 April Revenue (In Million USD) May June July (Projected)

Product range BATH TOWEL TERRY RUG BEACH TOWEL KITCHEN TOWEL SPA TOWEL WASH CLOTH

Product range BATH TOWEL TERRY RUG BEACH TOWEL KITCHEN TOWEL SPA TOWEL WASH CLOTH ROBE BATH MAT ü ü SOLID DYED YARN DYED VELOUR EMBROIDERY ü ü ü Ring Spun Combed Egyptian Organic Supima

Our Booth at Heimtextil 2014

Our Booth at Heimtextil 2014

Project Status • Infrastructure § Started Operation from Mid-2012 § Fully operational factory §

Project Status • Infrastructure § Started Operation from Mid-2012 § Fully operational factory § 100000 SQM land § 2 dormitories § 2 Production Sheds • Consumption § Gas: 0. 30 cubic meter/ KW § Water: 200 cubic meter/hour § Yarn: 50 tons/day • Logistics § Covered Van: 46 § Fork Lift: 06 § Ramp: 01

Project Status • Utility § Generator: 10 § Capacity : 18 MW § Present

Project Status • Utility § Generator: 10 § Capacity : 18 MW § Present productivity: 14. 4 MW § Boiler : 08 § Capacity: 72 tons § Present Productibity: 54 tons/day § 13 air compressors for all kinds of production facilities § Capacity: 53040 cubic meter/ hour § 7. 5 MW from the Govt. as backup § Hot water recovery plant. § Condensed steam recovery plant.

Spinning • The machines yield approximately 250 metric tons daily • Equipped with Ring

Spinning • The machines yield approximately 250 metric tons daily • Equipped with Ring Frame and Open-End or Rotor facilities can offer carded, combed and compacted yarns). • Total 400, 000 spindles

Preparatory • Warping M/C: 11 • Capacity: 63 tons/day • Present Productivity: • Sizing

Preparatory • Warping M/C: 11 • Capacity: 63 tons/day • Present Productivity: • Sizing M/C: 09 • Capacity: 63 tons/day • Present Productivity: 32 tons/day

Doubling & Twisting • • Total Machine: 34 Total Spindle: 4688 Capacity: 15 tons/day

Doubling & Twisting • • Total Machine: 34 Total Spindle: 4688 Capacity: 15 tons/day Present Productivity: 12 tons/day

Weaving • • • Total Loom: 246 AIR JET LOOM Total capacity: 50 tons/day

Weaving • • • Total Loom: 246 AIR JET LOOM Total capacity: 50 tons/day Present productivity: 40 tons/day Capacity utilization: 80% In Process: 74 more AIR JET Loom Future Plan: 100 tons/day

Wet Processing • Total machine(Soft Flow): 16 • J-Box: 2 • Capacity: 70 tons/day

Wet Processing • Total machine(Soft Flow): 16 • J-Box: 2 • Capacity: 70 tons/day • Present Productivity: 35 tons/day • Capacity utilization: 50% • Hydro extractor: 05 • Rope Opener: 02 • Stenter Machine: 01 • Loop dryer: 03 • Future Plan: 100 tons/ day

Yarn Dyeing • • • Total machine: 37 Total capacity: 25 tons/day Present productivity:

Yarn Dyeing • • • Total machine: 37 Total capacity: 25 tons/day Present productivity: 12 tons/day Capacity utilization: 48% RF dryer: 03

Stitching • • Total Machine: 651 Total capacity: 45 tons/day Present productivity: 35 tons/day

Stitching • • Total Machine: 651 Total capacity: 45 tons/day Present productivity: 35 tons/day Capacity utilization: 77. 77%

Quality • ISO 9001 -2008 & 14001 -2008 is under implementation. • Well defined

Quality • ISO 9001 -2008 & 14001 -2008 is under implementation. • Well defined startup process procedure and we maintain this. • Zero Tolerance approach in final inspection. • Final inspection with calibrated final Inspector • Process control using tools (process approach, process mapping, SIPOC, SPC). • Fully established traceability procedure. Traceability Procedure

Lab & Testing Facility • • • • Color fastness to wash (Gyro wash,

Lab & Testing Facility • • • • Color fastness to wash (Gyro wash, James Heal, England). Shrinkage and Durability (Washcator, Jams Heal, England) Auto dispenser. Color fastness to saliva testing machine. Color fastness to rubbing (James Heal, England). Universal strength tester (Titan, James Heal, England). Sample dyeing Machine Sample padding mangle Mini dryer Mini tumbler Precision Balance Light box (Verivide) Spectrophotometer for color assessment & recipe preparation. Auto Dispenser

Biological Effluent Treatment Plant • Capacity: 6000 m 3/day • Digital control from a

Biological Effluent Treatment Plant • Capacity: 6000 m 3/day • Digital control from a central control room • BOD sensor with incubator ( For BOD test) • Spectrophotometer (For COD test) • Thermo reactor (For COD test) • Microscope ( For Bacteria analysis) • Multi-meter (For TDS, p. H, DO, Temperature etc) • Precision balance

Our Suppliers (Machineries)

Our Suppliers (Machineries)

OUR CERTIFICATIONS Factory Approved By: IKEA, H&M, Kmart, Target, HEMA, Dollarama, Lidl, Primark, Kik,

OUR CERTIFICATIONS Factory Approved By: IKEA, H&M, Kmart, Target, HEMA, Dollarama, Lidl, Primark, Kik, Otto, Zeeman, Rusta, Matalan, La Redoute, Bonprix

COMPLIANCE: ENVIRONMENT Panta-Rei Biological Effluent Treatment Plant (255 M 3 / hour capacity) Reduce

COMPLIANCE: ENVIRONMENT Panta-Rei Biological Effluent Treatment Plant (255 M 3 / hour capacity) Reduce pollution / Reduce energy consumption / Prevent soil contamination • • Digital control from a central control room. BOD sensor with incubator ( For BOD test). Spectrophotometer (For COD test). Thermo reactor (For COD test). Microscope ( For Bacteria analysis). Multi-meter (For TDS, p. H, DO, etc). Precision balance.

Compliance: Social • Ensure Minimum wage • Women Empowerment • Casual Leave • Earned

Compliance: Social • Ensure Minimum wage • Women Empowerment • Casual Leave • Earned Leave • Festival Leave • Medical Leave • Maternity leaves • Day care center for infants • Medical Facility • Living accommodations for plant workers • Hygienic dining facility & pure drinking water for all employees • Timely salary disbursement through ATM cards to all employees • Training Center for human development • Noise Level Tracking and Monitoring • Gratuity • Group Insurance • No Child Labor • Motivation factor – Loan, Advance Payment, Performance Bonus, Attendance Allowance

WHY US? • High Quality at Competitive Prices • Product diversity & strength •

WHY US? • High Quality at Competitive Prices • Product diversity & strength • Highly Compliant Factory • Committed to environment • Motivated Workers • Trained Management • Continued investment on technology DUTY FREE ACCESS IN:

THANK YOU! For more info, please visit: http: //www. nomangroup. com Or you can

THANK YOU! For more info, please visit: http: //www. nomangroup. com Or you can email: Monzur@nttml. com