Hardware Commissioning Coordination within MPE Félix Rodriguez-Mateos 9/25/2020 Status Report TE-MPE 1

Hardware Commissioning Coordination within MPE Félix Rodriguez-Mateos 9/25/2020 Status Report TE-MPE 1

Contents List of Main Activities • Major progress in 2014 • Outlook into 2015

Contents List of Main Activities • Major progress in 2014 • Outlook into 2015 • 9/25/2020 Status Report TE-MPE 2

List of Main Activities • • • Coordination for the reinstallation and Individual System

List of Main Activities • • • Coordination for the reinstallation and Individual System Tests of the Quench Protection and Energy Extraction Systems Help the Coordination of the CSCM Tests (Copper Stabilizer Continuity Measurements) Assistance at Group Level to Powering Tests • • Daily follow-up of advances and tracking of open issues Resource Loaded Planning, with permanent updating in order to anticipate on potential/actual problems Monitoring progress and weekly meetings across MPE Sections and Group Leader Office Interface to LS 1 Coordination and Hardware Commissioning Coordination 9/25/2020 Status Report TE-MPE 3

Coordination? I hope it is not seen this way … Hardware Commissioning meeting on

Coordination? I hope it is not seen this way … Hardware Commissioning meeting on my 9/25/2020 Status Report TE-MPE 4

Resource-Loaded Planning MPE has conducted an optimization of resources in order to cope with

Resource-Loaded Planning MPE has conducted an optimization of resources in order to cope with the challenging requirements given by the LHC General Schedule without addition of any delays to the Commissioning phase. The plots shown are the result of reallocation of tasks among two of the Group’s QPS Teams. Prepared in collaboration with M. Bernardini & K. Foraz, EN-MEF 9/25/2020 Status Report TE-MPE 5

Where are we at a glance … 12 23 34 45 56 67 78

Where are we at a glance … 12 23 34 45 56 67 78 81 1. 5 k. V RB CSCM started 9/12 NC, RB@ warm RB/IT/IPQ IT CSCM Completed ELQA AT COLD POWERING • • • IST completed for 13 k. A and 600 A Energy Extraction Systems during the Short Circuit Tests campaign Re-installation and connection of DYPB racks (yellow racks) in all sectors was completed on time IST for Quench Protection System advancing very well along with the needs for every new sector under powering tests 9/25/2020 • • CSCM tests have been performed successfully in all eight sectors (see slides from Arjan) Five sectors are in Powering Phases I or II Status Report TE-MPE 6

12 23 34 45 56 67 78 81 RB/RQ Installation of n. QPS 1

12 23 34 45 56 67 78 81 RB/RQ Installation of n. QPS 1 3 1 1 1 1 0. 5 2 0. 5 1 1 1 0. 5 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0. 25 1 1 1 1 0 0 0 1 1 T 3 1 1 2 2 2 1 1 0 0 0 0 1 1 1 0. 5 1 1 0 0 1 0. 5 T 3 2 1 0 0 Update firmware i. QPS Update firmware n. QPS 1 1 4 4 1 1 1 1 0 UPS test done (heater redund. verified) 1 1 1 0 0 0. 5 1 1 0 0 0 0 1 1 0 0 Debugging-communication (BS boards running) Warm BB measurements Check loop controller - disconnect EE+PIC Check C leads protection Interlock tests (DS, BS, CL) Configuration for CSCM (running a macro) Reconnect EE+PIC CSCM tests After CSCM, disconnect PIC+EE T T T Reconfigure sector for normal operation (macro) Detector settings by software Heater trigger verification + voltage verification Interlock tests i. QPS Interlock tests n. QPS Connect PIC+EE QD tested and ready Switch ON HDS, Check heaters, unlatch n. QPS trigger, 300 V test, analysis, 900 V test (triggered by i. QPS), analysis HDS tested and ready Connection to PIC of QD and EE Remote download of coeff (QPS) T T Progress in RB/RQ circuits

Outlook into 2015 Courtesy of M. Bernardini & K. Foraz, EN-MEF 9/25/2020 Status Report

Outlook into 2015 Courtesy of M. Bernardini & K. Foraz, EN-MEF 9/25/2020 Status Report TE-MPE 8

… but we remain optimistic CSCM 600 A IPD IPQ IT RB/RQ TOTAL ACTUAL

… but we remain optimistic CSCM 600 A IPD IPQ IT RB/RQ TOTAL ACTUAL MAN. DAYS 160 98 8. 4 13. 7 14. 5 198. 8 TOTAL MAN. DAYS 160 176 26. 6 30. 4 42 300 % OF COMPLETION 100 56 32 45 35 66 493. 4 735 67 • Remaining: 240 person days for 8 weeks • This figure is confirmed by EN-MEF planning