WP 5 Case studies ESSnet SAE project meeting

  • Slides: 5
Download presentation
WP 5 – Case studies ESSnet SAE project meeting Neuchatel, 7 -8 July 2011

WP 5 – Case studies ESSnet SAE project meeting Neuchatel, 7 -8 July 2011

Time line WP 5 June 2010 Stocktaking round July 2010 (Wiesbaden) Overview of case

Time line WP 5 June 2010 Stocktaking round July 2010 (Wiesbaden) Overview of case studies Q 4 2010 Jan 2011 Case study planning and preparations Start case studies Heerlen meeting Reporting state of affairs “month 16” = April 2011 Draft report (for Eurostat) Neuchatel meeting Advanced draft report Oct 2011 Final report WP 5 Neuchatel 2011 – ESSnet SAE, WP 5 1

Draft WP 5 reports • 1 st draft, 12 May 2011 Contributions from France,

Draft WP 5 reports • 1 st draft, 12 May 2011 Contributions from France, Italy, Netherlands, Norway, Spain, Switzerland • 2 nd draft, 4 July 2011 Updates from these NSI’s (Germany and Poland still missing) • Still to come • General introduction, discussion and conclusion • Final versions of all case study reports Neuchatel 2011 – ESSnet SAE, WP 5 2

WP 5 schedule 2011 • Case study first drafts to NL < 15 April

WP 5 schedule 2011 • Case study first drafts to NL < 15 April 2011 • Draft report for Eurostat < 30 April 2011 • Advanced drafts < Neuchatel meeting, July • Final case study reports to NL < 30 Sep 2011 • Final WP 5 report ready < month 22 (31 Oct) Neuchatel 2011 – ESSnet SAE, WP 5 3

Issues • • Do not use page numbers Format of contributions: latex or Word?

Issues • • Do not use page numbers Format of contributions: latex or Word? +/- uniform in length: number of pages? Reviewing each others contributions? Neuchatel 2011 – ESSnet SAE, WP 5 4