Interferometry FP 6 FP 7 Alain Chelli LAOG






















- Slides: 22
Interferometry: FP 6 & FP 7 Alain Chelli, LAOG and Jean-Marie Mariotti Center Andreas Quirrenbach, U Heidelberg on behalf of the European interferometric community OPTICON Meeting, June 2006, Edinburgh, June 2006 1
Activities in FP 6 Alain Chelli Andreas Quirrenbach Edinburgh, June 2006 2
Integrating interferometry into mainstream astronomy Ø Objectives • • • Maintain & reinforce european interferometry Generate a long term european vision Integrate new countries Formation/exchange of students/investigators Make the VLTI an end-to-end service instrument Edinburgh, June 2006 3
Participants: 14 countries+ ESA + ESO (> 20 labs) Ø Ø Ø Ø Universität Wien (Austria) Universitè de Liège (Belgium) Academy of Sciences (Czech Republic) Jean-Marie Mariotti Center for Interferometry, JMMC (France) Max-Planck-Institut für Astronomie (Germany) Konkoly Observatory (Hungary) Technion (Israel) Torino University (Italy) Nederlandse Onderzoekschool Voor Astronomie, NOVA (The Netherlands) Torun University (Poland) Porto University (Portugal) Universidad Autonoma Madrid (Spain) Observatoire de Genève (Switzerland) University of Cambridge (United Kingdom) European Space Agency European Southern Observatory Edinburgh, June 2006 4
6 th Framework Program Integrated Infrastructure Initiatives (I 3) OPTICON PC: Gerry Gilmore / PS: John Davies JRA 4 PC: Chelli Network 5 PC: A. Quirrenbach Marie-Curie Program PC: P. Garcia Euro-Interferometry Initiative (EII) Executive Board (JRA 4+N 5+MC boards) Scientific Council (1 representative per country) Chair: T. Henning MOU Edinburgh, June 2006 5
Network # 5 “Integrating interferometry into mainstream astronomy” PC: Andreas Quirrenbach (U. Heidelberg) (http: //www. strw. leidenuniv. nl/~eurinterf) WP 1: Exchange visitor program WPL: Andrej Niedzelski (Torun) 260 K€ WP 2: Working groups WPL: S. Wolf (MPIA) WP 3: Modeling & Technology WPL: Jean Surdej (U. Liege) Edinburgh, June 2006 ~ 10 exchange programs per year 2 WG: Radiative transfer & Stellar Atmosphere Asteroseismology Objective: Initiate science case & technology roadmap for next-generation facility 6
Joint Research Activity # 4 “Integrating interferometry into mainstream astronomy” PC: Alain Chelli (LAOG) (http: //eii-jra 4. ujf-grenoble. fr) 500 K€ WP 1 Advanced Instruments (2 nd Generation VLTI Instruments) 500 K€ WP 1. 1: Concepts to Feasibility WPLs: Uwe Graser (Heidelberg) & Denis Mourard (OCA) WP 1. 2: Cophasing & fringe tracking WPL: Mario Gai (Torino) Objective: Prepare 2 nd generation of VLTI instruments WP 2: Off-line data reduction Software WPL: Gilles Duvert (LAOG) SPM: Gerard Zins (LAOG) Objective: facilitate the use of modern interferometric facilities such as ESO’s VLTI to a non specialist end user Edinburgh, June 2006 7
Advanced instruments: preparing VLTI 2 instruments Ø 6 Concept studies (01/2004 -06/2005) • 4 Infrared multi-beams combiners • 2 visible instruments Ø 2 (+1) instruments selected by ESO for phase A Edinburgh, June 2006 8
Software: making the VLTI an end-to-end service instrument WP 2: Off-line Data Reduction Software WP 2. 1: Management & User Support WP 2. 2: Integration WP 2. 3: Model-fitting WP 2. 4: Astrometry 1 st Prototype used at the Gouttelas summer school (June 2006) WP 2. 5: Image Reconstruction Edinburgh, June 2006 9
Marie-Curie program 06/2006 Observations and data reduction with the VLTI Gouttelas, France 2007 Circumstellar disks and Planets CAUP, Portugal 2007 AGN’s Arcetri, Italy 2008 PRIMA Siofok, Hungary Edinburgh, June 2006 10
Major Meetings Ø 5 major meetings • • • JRA 4 Kick-off (Nice 01/2004) Science cases (JENAM 08/2004) Technology roadmap (JENAM, 08/2005) Joint EII/ESO workshop (Garching, 04/2005) Joint ARENA/JRA 4 workshop (Nice, 05/2006) Ø EII Scientific Council • 12 meetings since its creation in 2002 Edinburgh, June 2006 11
Major Achievements Ø Integrated and Expanded European interferometric community including Central Europe Ø Jump-started VLTI 2 nd generation instruments Ø 1 st prototype user-friendly software being used at Gouttelas summer school Ø Initiated science case and technology roadmap for next-generation facility Edinburgh, June 2006 12
Interferometry in FP 7 Andreas Quirrenbach Alain Chelli Edinburgh, June 2006 13
Top-Level Goals Ø Build on success of FP 6 Ø Exploit current instrumentation to the fullest • Networking (exchange visits, working groups) • User-friendly data reduction and analysis tools Ø Support advances in VLTI instrumentation • 2 nd and 3 rd generation instruments Ø Prepare next-generation ground-based facility • Build science case • Conceptual design options • Develop critical technologies Ø Support space-based interferometry • Nulling technology • General science potential Edinburgh, June 2006 14
Proposed FP 7 Networking Activities Ø Fizeau Exchange Visitors Program Ø WG on science case for next-generation interferometer Ø WG on potential of Antarctica for interferometry (link with ARENA) Ø WG on Darwin science preparation Ø WGs on Interferometry and astrophysics • E. g. , asteroseismology, radiative transfer, fundamental stellar parameters Ø WG on VLTI instruments Ø Conference series: Applications of interferometry to astrophysics Edinburgh, June 2006 15
Proposed FP 7 JRA Activities (1 of 2) Ø Advanced user-friendly data reduction software Ø Second-generation data processing for VLTI Ø Optimized fringe tracking Ø Contribution to 2 nd-generation VLTI instruments (? ) Ø Studies of 3 rd-generation VLTI instruments Edinburgh, June 2006 16
Proposed FP 7 JRA Activities (2 of 2) Ø Guided optics (fibers, integrated optics) Ø Nulling technology (link with ESA) Ø Detectors (single-pixel, energy resolution) Ø Multi-beam co-phasing Ø Array design concepts Ø Beam transport concepts Ø Beam combination technology Ø Interferometer end-to-end modeling Edinburgh, June 2006 17
JRA Deliverables Ø Fully operational user-friendly software packages Ø Prototypes for key technologies (guided optics, nuller, single-pixel detector) Ø Realistic conceptual design(s) of nextgeneration interferometer Edinburgh, June 2006 18
Indicative Budget Ø Networking activities: Ø Software & algorithms: Ø Key technology development: Ø Next gen. conceptual design: Ø Post 2 nd gen. VLTI instruments: € 775, 000 € 1, 200, 000 € 1, 800, 000 € 850, 000 € 500, 000 Ø Grand total: € 5, 125, 000 Ø EU Funding only; cost-sharing not included Edinburgh, June 2006 19
Principal Interfaces Ø ESO (VLTI) and ESA (Darwin) • Leave programmatics to ESO/ESA • Support community and science cases Ø ELTs • Technology synergies (co-phasing, mirror and telescope manufacturing, …) Ø ARENA (Interferometry in Antarctica) • Through dedicated network • Deal mostly with specifics for interferometry • Leave specifics of Antarctica for ARENA Ø High-Time-Resolution JRA • Specialized detectors (few pixels, energy resolution) Edinburgh, June 2006 20
Activities outside OPTICON Ø Summer School Series • Marie Curie Program Ø Large Ground-Based Interferometer design study • • Preparation in FP 6/FP 7 Coordination with US (Decadal Review), others Timing depending on FP 7 funding opportunities Would seek OPTICON endorsement Edinburgh, June 2006 21
Programmatic Questions Ø Number of participants in FP 6 is large • Success! Many groups are contributing, interferometric community is growing • Management is difficult, accounting is tedious and expensive Ø Preparation of next-generation facility • Design-study proposal to FP 7 • Need to be ready in 2008 (? ) – which level of maturity is required? • Relation to roadmaps (ESFRI, Astronet) • Interface with OPTICON activities Edinburgh, June 2006 22






















