High power tests of Linac 4s PIMS cavity

  • Slides: 12
Download presentation
High power tests of Linac 4's PIMS cavity (Pi Mode Structure) Rolf Wegner 12

High power tests of Linac 4's PIMS cavity (Pi Mode Structure) Rolf Wegner 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner

PIMS RF behaviour 100% 68. 5% measured absolute relative Qsuperfish QHFSS no TR, T,

PIMS RF behaviour 100% 68. 5% measured absolute relative Qsuperfish QHFSS no TR, T, WR 28697 19657 23152 20800 105. 8% 89. 8% QHFSS TR: 2%, T: 1%, WR: 2% ZT 2 superfish [MΩ/m] ZT 2 HFSS no add. losses [MΩ/m] ZT 2 HFSS 5% add. losses [MΩ/m] ZT 2 summary [MΩ/m] 21994 20800 33. 243 22. 771 29. 550 28. 073 26. 5(scaled) 22. 771 26. 5(scaled) 94. 6% 116% WG-T not copper plated 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 2

PIMS conditioning day TRF 2010 [h] 2. 11. 3. 11. 2 6 4. 11.

PIMS conditioning day TRF 2010 [h] 2. 11. 3. 11. 2 6 4. 11. 6 5. 11. 8. 11. 2 4 9. 11. 5 com. setup multipactor modulator roof, temp. sens. trigger, temp. Ppeak Tpulse vacuum X-ray axis [μs] [mbar] [m. Sv/h] X-rayext [μSv/h] 1 k. W 1. . 10 k. W 800 25 5 · 10 -6 8 · 10 -6 0 0 max ~ 750 k. W 12 d. Bm 180 8 · 10 -6 12 14 max 300 500 4 · 10 -6 15 17 20 30 9. 7 d. Bm 800 8 · 10 -7 17 36 10. 11. 3 12 d. Bm 800 1 · 10 -6 25 44 sum 28 cavity conditioned to Ppeak~ 750 k. W, frep=2 Hz, Tpulse=800 μs 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 3

PIMS conditioning - signals 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner

PIMS conditioning - signals 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 4

PIMS conditioning - signals 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner

PIMS conditioning - signals 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 5

PIMS conditioning - signals cell 1 – green cell 4 – yellow cell 7

PIMS conditioning - signals cell 1 – green cell 4 – yellow cell 7 – blue reflected – red 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 6

PIMS conditioning - signals cell 1 – green cell 4 – yellow cell 7

PIMS conditioning - signals cell 1 – green cell 4 – yellow cell 7 – blue reflected – red 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 7

PIMS conditioning - signals cell 1 – green cell 4 – yellow cell 7

PIMS conditioning - signals cell 1 – green cell 4 – yellow cell 7 – blue reflected – red 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 8

PIMS amplitude modulation cell 1 – green cell 4 – yellow cell 7 –

PIMS amplitude modulation cell 1 – green cell 4 – yellow cell 7 – blue reflected – red 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 9

PIMS frequency modulation cell 1 – green cell 4 – yellow cell 7 –

PIMS frequency modulation cell 1 – green cell 4 – yellow cell 7 – blue reflected – red 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 10

PIMS frequency modulation 20 m. Sv/h on axis 12 -Nov-2010 High power tests of

PIMS frequency modulation 20 m. Sv/h on axis 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 11

PIMS conditioning - outlook • this week: opening of bunker => visits, installation of

PIMS conditioning - outlook • this week: opening of bunker => visits, installation of adaptable short circuit, • until Nov. 26 th: re-conditioning – raise of Ppeak to 0. 8 … 1 MW in cavity • preparation for high avg. power test (cooling, transport to SM 18, installation) • copper plating of waveguide-cavity connection • temperature & cooling tests • tests in SM 18 should be finished end December / mid January 12 -Nov-2010 High power tests of PIMS cavity Rolf Wegner 12