HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010
In Summary • HPS Setup HPS relies on a high rate, forward spectrometer, with good acceptance. Si microstrip detectors provide precision vertexing and tracking inside a 1 Tesla dipole. A Pb. WO 4 crystal EM calorimeter provides fast triggering and electron ID. A muon detector provides a complementary trigger, and doubles the statistics at high mass. September 20, 2010 2
In Summary • 100 % CEBAF duty cycle, excellent beam quality, plus >40 MHz readout capability gives HPS access to the high luminosity data sets needed to search for heavy photons. • The Silicon Vertex Tracker will provide 1% x p (Ge. V/c) momentum and ~1 mm vertex resolution, continuous readout, and 2 ns timing capability. • The Pb. WO 4/Shashlyk Ecal will provide the trigger and electron ID using 250 MHz FADCs. • DAQ can handle a 50 k. Hz trigger rate, 250 MB/sec data transfer rate. It’s build on Jlab FADCs and SLAC ACTA SVT readout. September 20, 2010 3
In Summary • GEANT 4 Monte Carlo has been used to determine trigger rates and establish tracking and vertexing performance for physics events in the presence of full beam backgrounds. • Detailed estimates of the HPS physics reach show: HPS will search a unique small coupling region of heavy photon parameter space with unparalleled sensitivity, obtained by combining invariant mass and decay vertex information. At the same time, using invariant mass information alone, HPS will explore the region of moderate couplings over the mass range 50 -1000 Me. V. Sensitivity to decay vertices gives HPS the unique opportunity to discover “true muonium”. September 20, 2010 4
So, What does it Cost? Costing Assumptions • “Donations” lower the HPS cost Fermilab ~150 Hamamatsu Si microstrip detectors SLAC 18 D 36 H Magnet JLab Pb. WO 4 crystals, magnets, power supplies, DAQ infrastructure, Data Storage Collaborators Engineering and design for Ecal and Muons • Lab Indirects have been included in Labor Rates • Contingencies have been included Engineering Designs Needed SLAC 30% Labor 35% M&S 10 -15% Costed items JLab 20% Labor Many Systems Already Engineered 25% M&S 10 -15% Costed items • HPS makes use of ongoing Jlab R&D for 12 Ge. V Upgrade Detectors
Costing Methodology : HPS WBS September 20, 2010 6
Beamline • Items √Chicane magnets and quads (J) √Magnet power supplies (J) √Analyzing magnet (S) Girders, BPMs, Harps, Correctors Support Stands Beam Pipes and Windows Refurbish Analyzing Magnet Power Cables Installation • Engineering and Design. 4 FTE • Technician 1. 6 FTE TOTAL September 20, 2010 $590 k 7
Silicon Vertex Tracker • Items √Si microstrip sensors (F) Sensor modules CF Support Box Vacuum Chamber Readout Cables Power, Vacuum, Temp Systems • Engineering and Design 0. 6 FTE • Technician 0. 7 FTE TOTAL September 20, 2010 $830 k 8
ECal • Items √Pb. WO 4 crystals/APDs/amps (J) √Shashlyk towers or Pb Glass (J) Pb. WO 4 Connection Board & Motherboards PMTs for Shashlyk or Pb Glass Cables and Connectors Temp Enclosure Box Vacuum Box Support Stand • Engineering and Design* 1. 0 FTE • Technician (fab and test). 25 FTE TOTAL $260 k * Engineering and Design by JLab User. September 20, 2010 9
Muon System • Items √HV supplies (J) Fe Absorber Scintillator and Fibers PMTs and dividers Cables and splitters Support Stand • Engineering and Design* • Technician TOTAL 1. 0 FTE 0. 1 FTE $180 k * Engineering and design by JLab User September 20, 2010 10
Ecal and Muon DAQ and Trigger • Items √Discriminators, TDCs, and crates (J) FADCs Crate Trigger Processor Board Sub System Processor Board Trigger Interface Board Signal Distribution Board CPU Board VXS Crates Cables and Misc • Engineering and Design 0. 1 FTE • Technician 0. 3 FTE TOTAL $600 k September 20, 2010 11
SVT DAQ • Items Hybrid and APV 25 s Readout Board Trigger Interface Board ATCA Crate CPU Board Server • Engineering and Design • Technician TOTAL September 20, 2010 0. 9 FTE 0. 6 FTE $650 k 12
Total Costs Breakdown by Sub System Beamline & Installation Vertex Tracker ECal Muon Ecal DAQ/Trigger SVT DAQ TOTAL September 20, 2010 $ 590 k 830 k 260 k 180 k 600 k 650 k $3110 k JLab 405 k 0 k 260 k 180 k 600 k 0 k SLAC 185 k 830 k 0 k 650 k $1445 k $1665 k 13
Total Manpower Breakdown In FTE years Note: This is the manpower breakdown assumed in the costing. We expect a much larger contribution from physicists and grad students in the actual construction, testing, and installation phases of the experiment. September 20, 2010 14
Schedule before Shutdown Goal: Take beam Spring 2012 Understand beam control, trigger rates, and occupancies. Test critical assumptions and Monte Carlo simulations. Have time, before the 12 Ge. V data taking, to react to surprises. Steps: • 2011 Spring (during CLAS photon calibration and running) Test FADCs and readout Test SVT detector module and readout • 2011 Downtime (May-November, 2011) Install major beamline items: magnet, vac chambers • Spring 2012 Complete beamline installation Install detectors Commission DAQ Commission beam, check quality and stability Test trigger and occupancy calculations, detector performance 1 Week Test Run September 20, 2010 15
Schedule after Shutdown • Downtime mid 2012 -end 2013| Remove HPS beamline for CLAS decommissioning and eventual re-installation Evaluate performance; React to surprises Analyze Test Run Data • Major Data Taking in the 12 Ge. V Era. Detailed plan being developed. Re-install and re-commission HPS Take HPS data for ~3 months. Run at several energies to optimize reach and mass range. Take HPS true muonium data for ~1. 5 months September 20, 2010 16
Conclusions • Total HPS estimated cost $3. 1 M. Considerable savings from Fermilab donation, use of existing Jlab and SLAC apparatus, and engineering and design by collaborators. • Goal is to install HPS in Spring 2012 for test run. Major data taking would take place in the 12 Ge. V era. • Being ready in Spring 2012 is possible, but depends on funding being ready soon to begin ED&I on long leadtime items. Hybrid design, beamline design, vac chamber construction need keep alive funds ~now. Major funding needed ~Jan 2012 September 20, 2010 17
Illuminating Dark Matter • Searching for heavy photons provides Jlab with an exciting and topical research program with the potential for fundamental discoveries. • Heavy photon searches must be pursued aggressively if this potential is to be realized. • HPS extends the search into a unique range of heavy photon parameter space with unparalleled sensitivity, exploiting both separated vertex and invariant mass signatures. September 20, 2010 18