Freestock/Floor Stock Vendor Managed Inventory -Endries- Dax Tripp, Jeffrey Howell, Tiffanie Martin, Ben Ruby,

Freestock/Floor Stock Vendor Managed Inventory -Endries- Dax Tripp, Jeffrey Howell, Tiffanie Martin, Ben Ruby, Alice Cook Dr. Jimenez, Wes Olive, Psyche Bryant May 5, 2015 1

Problem Statement What is the Current Problem? Out of all the orders that affected

Problem Statement What is the Current Problem? Out of all the orders that affected Schedule Attainment in December 2014, 13% were related to Freestock/Floor stock Stock-Outs What is Freestock/Floor Stock? Freestock/Floor Stock Typically Comprise Commonly used Fasteners which are Hardware that Adjoin Objects using Screws, Bolts Among Other Components Philips Freestock/Floor Stock Components List Currently Also Includes Wire, Glue, Tape, Bags Among Others Impact of Not having the Correct Mixture of Freestock/Floor Stock Components? • Missed Customer Orders • Assembly Downtime • Firefighting • Confusion on Replenishment Process • Ownership of Process 2 Goal: Reduce stock outs by 25% Confidential DMAIC presentation template

Define Utilized Six Sigma Tools: SIPOC Process to Identify Scope of the Process our

Define Utilized Six Sigma Tools: SIPOC Process to Identify Scope of the Process our Project will Address Suppliers Inputs Process Outputs Decision Tree for Scope of Project 3 DMAIC presentation template Confidential Customers

Measurement Data Gathered • Process Chart – 3. 8% Value Added • DPR –

Measurement Data Gathered • Process Chart – 3. 8% Value Added • DPR – Customer Attainment • Endries Annual Usage – Usage, Lead Time, VMI… • Philips Item Master – 43% Alignment • Bin Measurements – 23% within 20% EOH 4 DMAIC presentation template Confidential

Freestock Issues Stock Outs and Current Process • Endries VMI Classification • Months Usage

Freestock Issues Stock Outs and Current Process • Endries VMI Classification • Months Usage • Lead Time • Component Type • Philips VMI Classification • Annual Usage 5 DMAIC presentation template Confidential

Analyze Design of Experiments to Verify Root Causes for Stock Outs Analysis of variance

Analyze Design of Experiments to Verify Root Causes for Stock Outs Analysis of variance table [Partial sum of squares - Type III] • Significant factors have p -values < 0. 05 • R 2 = 0. 79 – Adj R 2 = 0. 4 • Most significant factor is the interaction between Lead Time and Annual Usage. 6 DMAIC presentation template Source Model A-Endries VMI B-Item Master SC C-Months Usage D-Annual Usage E-Lead Time F-Component Screw DE AC CD CE AE AD Residual Cor Total Std. Dev. Mean C. V. % PRESS Sum of p- value df Mean Square F Value Squares Prob > F 13197. 52 41 Rank of Significance 321. 89 2. 03 0. 039 model is significant 722. 27 1 722. 27 4. 56 0. 0442 7 819. 39 1 819. 39 5. 17 0. 0331 6 415. 14 1 415. 14 2. 62 0. 1198 34. 52 1 34. 52 0. 22 0. 6453 47. 27 1 47. 27 0. 3 0. 5905 31. 64 1 31. 64 0. 2 0. 6594 1732. 64 10. 93 0. 0032 1 1198. 89 7. 56 0. 0117 2 1198. 89 1 1198. 89 7. 56 0. 0117 2 1164. 52 1 1164. 52 7. 35 0. 0128 4 848. 27 1 848. 27 5. 35 0. 0304 5 708. 89 1 708. 89 4. 47 0. 046 8 3486. 59 22 158. 48 16684. 11 63 12. 59 6. 33 198. 94 Confidential 29506. 38 R-Squared Adj R-Squared Pred R-Squared 0. 791 0. 4016 -0. 7685 Adeq Precision 7. 226

Analyze Solutions • Desirability at 0. 949 if usage set at < 500. •

Analyze Solutions • Desirability at 0. 949 if usage set at < 500. • Desirability reduced to 0. 7 if annual usage required to be > 500. 7 DMAIC presentation template Confidential

Improve Solution: Develop Criterion for Each Category Freestock. VMI Kanban System Freestock Purchase Information

Improve Solution: Develop Criterion for Each Category Freestock. VMI Kanban System Freestock Purchase Information Philips Manufacturing Facility 8 DMAIC presentation template Replenish Bin(s) Confidential Vendor Distribution Center

Improve Using Six Sigma Tools: RACI Chart to Clarify Roles and Responsibilities Responsible Accountable

Improve Using Six Sigma Tools: RACI Chart to Clarify Roles and Responsibilities Responsible Accountable Process Map for Source Code Conversion 9 DMAIC presentation template Consulted & Informed Material Flow for Based on Source Code Confidential

Control Dashboards Dashboard to Track Stock-Outs & Performance – Stock-Outs by Week, – Stock-Outs

Control Dashboards Dashboard to Track Stock-Outs & Performance – Stock-Outs by Week, – Stock-Outs by Source Code/Criteria § Read-Out of Components with Highest Impact and by Criteria – % of Components Seen by Both Parties 10 DMAIC presentation template Confidential

Control Measuring System • Statistical Proof that Methods Implemented have dropped Stock. Outs •

Control Measuring System • Statistical Proof that Methods Implemented have dropped Stock. Outs • We Expect this Trend to Continue as Components are Addressed 11 DMAIC presentation template Confidential

Collaborating With A Special Thank you to: Philips Members • • • Texas State

Collaborating With A Special Thank you to: Philips Members • • • Texas State University Members Chris Venicx – Plant Manager Wes Olive – Supply-Chain Manager Psyche Bryant – Assembly/Manufacturing Mgr. Felipe Caldeira – Industrial Engineer Francisco Gutierrez – Senior Industrial Engineer • Dr. Jesus Jimenez – Industrial Engineering Capstone Faculty Advisor Additional Thanks • • • 12 DMAIC presentation template Dr. Tongdan Jin – Industrial Engineering Professor Dr. Clara Novoa – Industrial Engineering Professor Dr. Eduardo Perez – Industrial Engineering Professor Confidential