CALYPSO Project FINAL MEETING PROJECT SEMINAR University of
- Slides: 26
CALYPSO Project FINAL MEETING PROJECT SEMINAR University of Malta, Valletta Campus, Old University Building, St Paul Street, Valletta 29 August 2013 Beyond CALYPSO – Prospects for the future GIUSEPPE CIRAOLO FULVIO CAPODICI and ALBA ABBATE Calypso Project Sicilian Focal Point - UNIPA INFO: www. capemalta. net/calypso
FRAMEWORK 1. The installation process of the Pozzallo HF antenna, within the Pozzallo Port was a long and complex task from several point of view 2. More than 15 authorizations have been obtained by ARPA before to start the installation 3. The role of the UNIPA Focal Point was crucial to take care and to follow all these processes (from technical and administrative point of view) 4. All the bureaucratic processes are clear now 5. The experiences and the lessons learnt during last 28 months will be useful in the future to speed up NEW future installations (if any)
The Pozzallo HF installation The Pozzallo HF antenna completed the CALYPSO HF network The installation has been completed on 13 th of August
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF installation
The Pozzallo HF system: first data first radial map (August 13, 2013) Some radial map reached the Malta island after few acquisition days The system seems acquiring data correctly (but not calibrated yet)
The Pozzallo HF system: actions to be performed 1) Antenna Pattern Measurements (APM) (ARPA + CUTGANA + Qualitas) 2) Integration and combination of the Pozzallo HF data within the Malta combine station, to produce surface velocities maps on the whole area at hourly scale 3) Drifters release (validation) 4) ADCP survey (validation)
Expected improvement Including the third HF system will: - Increase the monitored surface - Improve the data quality and the reliability of the measurements
Expected use of the system The CALYPSO network will be maintained up for at least 5 years During this period CALYPSO data will be useful in: - improving the reliability of sea currents forecasting - oil spill chain response (forecasting of the oil fate and mitigation) INITIAL OIL SPILL POSITOIN FUTURE OIL SPILL POSITOIN INITIAL SEA STATE CALYPSO REMOTE SENSING FUTURE SEA STATE FUTURE WEATHER OIL SPILL MITIGATION Other applications - search and rescue - sea fishing - boat routing
Why CALYPSO in the Malta channel Oil spills in the 1999 -2004 period: 18. 947 spills
Why CALYPSO in the Malta channel Oil spills in the 1999 -2004 period: 18. 947 spills
OIL SPILL MONITORING USING REMOTE SENSING (COSMO-SKYMED) s°VV (d. B) Low Winds or currents -10 -15 Suspected oil -20 -25 -30 7– June 2010
OIL SPILL MONITORING USING REMOTE SENSING (COSMO-SKYMED) s°VV (d. B) -10 winds Suspected oil Winds? Suspected oil 29– June 2010 -15 -20 -25 -30
MALTA CHANNEL FROM COSMO-SKYMED s°VV (d. B) -10 winds Currents or other false positive oil -15 -20 -25 -30 10– Jul. 2010
OIL SPILL MONITORING USING REMOTE SENSING (COSMO-SKYMED) s°VV (d. B) -10 -15 -20 -25 Suspected oil -30 9– Aug. 2010
Future expansion of the System CALYPSO 2: to extend the CALYPSO coverage 3 hypotheses for the next HF system position Scoglitti Advantages: Gela redundancy increased coverage Licata better quality of the maps
Future expansion of the System
Future expansion of the System DREAMING A FULL HF COVERAGE FOR THE SICILIAN COAST
Conclusions • • • The system management for the next 5 year will require a certain effort from economical point of view (and not only) An amount of 8 -10 thousand € per year is required to maintain the Pozzallo system (frequency authorization, insurance, system maintenance, energy supply, internet connection) Periodic field survey would be needed to test the accuracy of the system An agreement on the use of theadata by external customer is Meeting Ragusa 21 Novembre 2011 needed New funds have to be found to finance and expand the network INFO: www. capemalta. net/calypso
Acknowledgements For their support to the project I sincerely thank: • All the project sicilian partners (ARPA, CNR, CUTGANA) • Dr. Aldo Vernengo of the Demanio Marittimo – Regione Siciliana • Cdr Paolo Cafaro and Cdr Marco Mancini of the Comando Generale Guardia Costiera - ROME • Cdr Andrea Tassara and Capt. Marco Tognazzoni of the Capitaneria di Porto di Pozzallo Meeting a Ragusa • Dr. Giovanni Arnone 21 Novembre and Dr. 2011 Vincenzo Falgares of the Regione Siciliana • The STC and ADG staff INFO: www. capemalta. net/calypso
Acknowledgements And last but not least… my special thank to these two guys… FULVIO ALBA . . because their inexhaustible energy, effort and perseverance INFO: www. capemalta. net/calypso
CALYPSO Project FINAL MEETING PROJECT SEMINAR University of Malta, Valletta Campus, Old University Building, St Paul Street, Valletta 29 August 2013 THANKS FOR LISTENING GIUSEPPE CIRAOLO Meeting a Ragusa giuseppe. ciraolo@unipa. it 21 Novembre 2011 INFO: www. capemalta. net/calypso
- Oil spill
- Calypso curve
- Calypso construction
- Calypso program
- Zeiss calypso
- Zeiss calypso
- Calypso caa
- Calypso
- Calypso role in the odyssey
- Calypso architecture
- Calypso spi
- Odyssey history channel
- Commandant de la calypso
- Hogeschool utrecht bouwkunde
- Final meeting
- Final meeting
- For today's meeting
- Today meeting or today's meeting
- What is meeting and types of meeting
- Types of meeting
- Project seminar presentation
- Project management seminar
- Project seminar presentation
- Final year project methodology
- Freak the mighty final project
- Final project due
- Biology final project