Target station concept The switching yard is not part of WP 4, it is

Target station concept The switching yard is not part of WP 4, it is being studied within WP 3 ESSnu. SB annual meeting, 7. 11. 2018 2

Objectives: • Adapt the EUROnu designed target station to the ESSnu. SB requirements •

Objectives: • Adapt the EUROnu designed target station to the ESSnu. SB requirements • the target • hadron collector (Horn) • Power Supply Units • Investigate the possibility of using a solenoid based hadron collector • Optimise the facility structure • Simulate the neutrino beam Tasks: Task 4. 1 Coordination of the Target Station study (AGH) Task 4. 2 Adapt the EUROnu design target station to the ESSnu. SB requirements (AGH, CNRS, Uni. Ge) Task 4. 3 Target integration (AGH, CNRS, CERN) Task 4. 4 Optimization of the horn-type hadron collector (CNRS, AGH, CERN) Task 4. 5 Horn current pulse generator (CNRS) Task 4. 6 Alternative hadron collector (UU, CERN) ESSnu. SB annual meeting, 7. 11. 2018 3

Deliverables and milestones Task Delive Partner's Dead rable Year Description of task responsibility/ lines

Deliverables and milestones Task Delive Partner's Dead rable Year Description of task responsibility/ lines Milest Name one D 4. 1 M 24 2019 Optimised design of the magnetic horn (M 24) AGH Evaluation of an alternative hadron collector D 4. 2 M 28 2020 AGH (M 28) Design of the pulse generator and of the horn D 4. 3 M 36 2020 AGH cooling system (M 36) D 4. 4 M 45 2021 Design of the target station (M 45) AGH Review of the 1 st year achievements, MS 1 M 12 2018 CNRS deliverables & costs (M 12) MS 5 M 18 2019 Design of the hadron collection device (M 18) AGH First estimation of neutrino beam intensity MS 7 M 24 2019 AGH (M 24) Review on interim milestones, deliverables & MS 9 M 24 2019 CNRS costs (M 24) Review of the 3 rd year milestones, MS 13 M 36 2020 CNRS deliverables & costs (M 36) MS 17 M 42 2021 Final design of target station (M 42) AGH Cost and performance evaluation complete MS 18 M 42 2021 CNRS (M 48) 4

Detailed tasks and progress status T 4. 1. 1 T 4. 1. 2 T

Detailed tasks and progress status T 4. 1. 1 T 4. 1. 2 T 4. 1. 3 T 4. 2. 1 T 4. 2. 2 T 4. 1. 3 T 4. 2. 4 T 4. 2. 5 T 4. 3. 1 T 4. 3. 2 T 4. 3. 3 Adapt the EUROv design target AGH/CNRS/UNI station to the ESSnu. SB GE requirements Target station concept for ESSnu. SB AGH/CNRS Horn electrical system CNRS Safety CNRS Optimization of the horn type AGH/CNRS/CERN hadron collector Performance CNRS Stress levels in the horn and AGH assessment of its lifetime Horn cooling cystem AGH/CNRS Horn support structure AGH Safety CNRS Horn current pulse generator CNRS Pulse generator CNRS Electrical power supply (Strip line CNRS connector to the horn) Safety CNRS ESSnu. SB annual meeting, 7. 11. 2018 Status done underway underway 5

T 4. 4. 1 T 4. 4. 2 T 4. 5. 1 T 4.

T 4. 4. 1 T 4. 4. 2 T 4. 5. 1 T 4. 5. 2 T 4. 5. 3 T 4. 6. 1 T 4. 6. 2 T 4. 6. 3 T 4. 6. 4 T 4. 6. 5 T 4. 6. 6 T 4. 6. 7 T 4. 7. 1 T 4. 7. 2 T 4. 7. 3 T 4. 7. 4 T 4. 8 Alernative hadron collector Performance Design issues Target performance and neutrino beam simulation Simulation Geant 4/FLUKA Packed bed target (Baseline) Graphite target (Second Option) UU/CERN UU UU underway CNRS AGH/CNRS/CERN/ Target Integration UNIGE Definition of target integration AGH/UNIGE concept Stress levels in the granular target AGH Target longevity AGH Target cooling AGH Target material Issues UNIGE/CERN Safety CNRS/CERN Feasibility of graphite target AGH (Second option) Target station facility AGH/CNRS/CERN Target station layout AGH/CNRS/CERN Electrical power plant CNRS Cooling plant AGH Global safety CNRS Cost evaluation CNRS ESSnu. SB annual meeting, 7. 11. 2018 underway 6

WP 4 meetings are held regularly (5 video meetings held so far) Presentations of

WP 4 meetings are held regularly (5 video meetings held so far) Presentations of WP 4 during conferences and workshops: Presentations specifically devoted to WP 4 P. Cupial „ESSnu. SB Target Station”, 7 th High Power Targetry Workshop, Facility for Rare Isotope Beams (FRIB), East Lansing, 4 -8. 06. 2018 M. Dracos „The ESSnu. SB Target and Horn Studies and Future Developments”, Nu. Fact 2018, Blacksburg, Virginia, 12 -18. 08. 2018 WP 4 issues were also part of several other presentations this year ESSnu. SB annual meeting, 7. 11. 2018 7

Recruitment of posdocs: Two postdoc positions are currently open within WP 4, both with

Recruitment of posdocs: Two postdoc positions are currently open within WP 4, both with application deadline of 30. 11. 2018: Postdoc at CNRS , Strasbourg, France, in the field of neutrino physics Postdoc at AGH UST, Krakow, Poland, in the field of computational mechanics or the design of high-power targetry The announcements have been posted on the ESSnu. SB webpage (essnusb. eu/site/jobs-2/) as well as European and national forums ESSnu. SB annual meeting, 7. 11. 2018 8

Technical presentations to be made during the WP 4 Sessions: Wednesday morning: P. Cupial

Technical presentations to be made during the WP 4 Sessions: Wednesday morning: P. Cupial „Introduction to WP 4 studies” (AGH, Krakow) N. Vassilopoulos „Present Status of Super Beam” (IHEP, Beijing) P. Cupial „Transient Temperature, Thermal Stress and Natural Frequency for Spheres: Analytical vs. Finite Element Analysis” (AGH, Krakow) Wednesday afternoon: M. Koziol „ 3 D Analysis of the Horn Under Magnetic and Thermal Excitation” (AGH, Krakow) E. Baussan „Target Station” (CNRS, Strasbourg) P. Poussot „Power Supply” (CNRS, Strasbourg) Thursday morning: M. Olvegard „Alternative Methods for Hadron Collection: Status and Plan (University of Uppsala) E. Baussan „Safety” (CNRS, Strasbourg) E. Noah „ The Baby Mind Project” (University of Geneva) ESSnu. SB annual meeting, 7. 11. 2018 9

Thank you ESSnu. SB annual meeting, 7. 11. 2018 10

Thank you ESSnu. SB annual meeting, 7. 11. 2018 10