Status of the FMD Outer ring Inner ring
- Slides: 11
Status of the FMD Outer ring Inner ring FMD 1 FMD 2 FMD 3 Børge Svane Nielsen Niels Bohr Institute Technical Forum, 8 March 2007 Børge Svane Nielsen, NBI 1
Test beam results 680 Me. V e- beam test at ASTRID ring, Aarhus University, DK e- beam 5 FMD modules (5120 channels) Technical Forum, 8 March 2007 Børge Svane Nielsen, NBI 2
FMD 3 cone FMD 3 support cone also supports the beam pipe by 4 tensioned wires Test with final cone and wire mechanism shows <10 um deformations. Technical Forum, 8 March 2007 Mock-up beam pipe support ring. Børge Svane Nielsen, NBI 3
Digitizer cards and RCU bus cables Digitizer cards on detector based on TPC FEC design, (designed at NBI) 3 ALTROs + Board Contr. 2 versions (inner, outer) 3 m bus cable to RCU gave many problems, until we changed from 40+50 ‘standard’ ALTRO bus to 50+80 twisted pair cables. 40 bit signal + 10 grounds Technical Forum, 8 March 2007 adaptor Børge Svane Nielsen, NBI 40 bit signal + 40 grounds 4
Test after assembly Test of noise (pedestal width) for half inner ring (5 modules, 5120 strips) after final assembly Pattern understood from strip and printed circuit lengths All S/N above 20 Technical Forum, 8 March 2007 Børge Svane Nielsen, NBI 5
FMD 2 support Mounting flap IP Honeycomb detector mounting plates FMD support is a relatively simple carbon fibre sandwich structure cylinder. Technical Forum, 8 March 2007 Børge Svane Nielsen, NBI 6
Assembly of FMD 3 Technical Forum, 8 March 2007 Børge Svane Nielsen, NBI 7
Completed FMD 3 Both halves of FMD 3 were completed last week Technical Forum, 8 March 2007 Børge Svane Nielsen, NBI 8
… and then FMD 2 Both halves of FMD 2 to be/were completed this morning Technical Forum, 8 March 2007 Børge Svane Nielsen, NBI 9
Conclusions Ø FMD 3 and FMD 2 detectors ready to ship tomorrow Ø Very small rate of single strip failures (<<0. 1%) Ø Signal/noise well above TDR value Ø Commissioning with final power supplies, DAQ, DCS and Trigger starting next Monday at Point 2. Ø Installation mid-April (FMD 3) and early May (FMD 2) ½ FMD 3 ½ FMD 2 (without detectors) Technical Forum, 8 March 2007 Børge Svane Nielsen, NBI 10
… at CERN Ongoing: cabling of FMD 3 Arrival of detector at P 2: Saturday Starting next week: commissioning in TPC clean room at P 2 - CAEN HV available - CAEN LV should arrive next week - temporary cooling system Installation April 23 rd (FMD 3) - need to work out access - area should be cleaned Technical Forum, 8 March 2007 Børge Svane Nielsen, NBI 11
- Inner ring and outer ring
- Inner defender and inner guide examples
- Tfl anatomie
- Fmd
- Fmd
- Outer product
- Which type of wave can penetrate the outer and inner core?
- Inner scale outer scale protractor
- What are the 3 main layers of the earth? *
- Modelica inner outer
- The brittle, rocky outer layer of earth
- What separates the inner planets and outer planets