Senior Geography Project State of the Prospect Creek










- Slides: 10
Senior Geography Project State of the Prospect Creek (Carramar) Ecosystem Manish Chandra, Year 11.
Primary research • • • Soil p. H – 6. 5 Temperature – 10 to 20 degrees Celsius today Water temperature – 17 degrees Celsius Topsoil depth – 3 cm Humidity – 75% Ground cover – creek side is 90% Vegetation height – 17 m approx. Canopy cover – near creek is 70% Wind speed – 11 knots • http: //wind. willyweather. com. au/nsw/greater-western-sydney/prospect-creek--lansdowne-bridge. html live info statistics on rainfall, wind speed, humidity, swell, weather , temperature.
Primary research cont. Native • • • Cockatoos Lorikeets Magpies Kookaburras Eucalypts introduced • • • Dogs Cats Pine trees Various fruit trees Myna birds
Primary research Questionnaire Do you think there should be more bins on the paths? Do think the local council could do a better job in maintaining the creek? What do you think about all the pollution in the creek? Do you think the Fairfield council is saving ecosystems?
Secondary research http: //www. fairfieldcity. nsw. gov. au/default. asp? i. Nav. Cat. Id=2181&i. Sub. Cat. Id=2194 - Creek Care program established in 2001 to keep the creeks in the Fairfield area unpolluted and maintained. • ‘The core components of the Creek Care Program consist of two elements: bush regeneration and waterways litter control. Fairfield City Council has increased resource allocation and funding to more than $0. 56 million in the 2005/2006 financial year to sustain these core components of the program. ’ from the html. • The long term aims of the Creek Care Program are to: • Create a beautiful environment for residents. • Create an environment where native plants are able to recolonise degraded/cleared areas • Extend creek lines to gradually link up sites to provide a continuous habitat corridor along entire waterways • Restore degraded areas as far as possible, to viable, manageable and sustainable ecosystems • Protect bushland from further external disturbance events and protect the site's special features (natural, geological, landscape and cultural) • Preserve and enhance local and regional biodiversity • Enhance and extend habitat for native fauna • Maintain all sites as part of an on-going maintenance program • Balance revegetation strategies to ensure minimal impacts such as flooding and improve water quality suitable for a variety of recreation uses, both passive and active.
Key Questions • 1) Asses relationship between the native species and introduced species. • 2) Explain impact of pollution on this ecosystem and on flora/fauna. • 3) Discover the effect humans and their pets have on this ecosystem. • 4) Analyse the management strategies Fairfield Council have adopted to combat pollution and human impact.
Pollution issues • • Littering in the park, ending up in the creek Dumping of lawn clippings Rubbish everywhere Dumping waste creek side
Human impact • Built a rugby and cricket field • Play sports and leave rubbish • Increased water flow, topography of land into creek • Humans and their pets
Management strategies • • • ‘bushland regeneration’ ‘creek care’ and individual common sense More bins on the paths Stricter penalties/fines
Photos










