PROCUREMENT 2017 DESIGN KAIDO ZIMMERMANN Planning and Implementation

  • Slides: 10
Download presentation
PROCUREMENT 2017 DESIGN KAIDO ZIMMERMANN Planning and Implementation Manager, RB Rail AS

PROCUREMENT 2017 DESIGN KAIDO ZIMMERMANN Planning and Implementation Manager, RB Rail AS

WHO IS RESPONSIBLE FOR DESIGN? DESIGN OF TRACK AND STRUCTURES DETAILED TECHNICAL DESIGN: RB

WHO IS RESPONSIBLE FOR DESIGN? DESIGN OF TRACK AND STRUCTURES DETAILED TECHNICAL DESIGN: RB RAIL AS CONSOLIDATED PRELIMINARY DESIGN: RB RAIL AS PRELIMINARY DESIGN: IMPLEMENTING BODIES

RB RAIL AS RESPONISBILITY DETAILED TECHNICAL DESIGN: • Master Design • Detailed Design CONSOLIDATED

RB RAIL AS RESPONISBILITY DETAILED TECHNICAL DESIGN: • Master Design • Detailed Design CONSOLIDATED PRELIMINARY DESIGN TO ENSURE INTEROPERABILI TY

DESIGN PROCESS ORGANISATION PRELIMINARY DESIGN. CONSOLIDATE D DESIGN DETAILED TECHNICAL DESIGN: 2018 MASTER DESIGN

DESIGN PROCESS ORGANISATION PRELIMINARY DESIGN. CONSOLIDATE D DESIGN DETAILED TECHNICAL DESIGN: 2018 MASTER DESIGN DETAILED DESIGN 2020 2016 2018 2020 2019 2020 2022 • •

DESIGN PROCESS ORGANISATION Design - 9 tenders Technical assessment -3 tenders Notified Body -1

DESIGN PROCESS ORGANISATION Design - 9 tenders Technical assessment -3 tenders Notified Body -1 tender 5

DESIGN GUIDELINES Design guidelines-set of predefined and standardized technically and economically justified engineering and

DESIGN GUIDELINES Design guidelines-set of predefined and standardized technically and economically justified engineering and design solutions for Rail Baltica; Operating rules-draft regulatory basis of Rail Baltica Railway operations; Fully complaint with TSI INF traffic codes P 2/F 1; Available from October 2017 6

RAIL BALTICA PROCUREMENT – DESIGN 6 Up-coming Tenders 5 Tenders on Design in 2017

RAIL BALTICA PROCUREMENT – DESIGN 6 Up-coming Tenders 5 Tenders on Design in 2017 On-going tenders 1

RIGA INTERNATION AIRPORT PASSENGER STATION AND RELATED INFRASTRUCTURE Procurement of Latvian implementing body –

RIGA INTERNATION AIRPORT PASSENGER STATION AND RELATED INFRASTRUCTURE Procurement of Latvian implementing body – Eiropas Dzelzceļa līnijas Qualification phase was announced on 04/11/16 with a submission deadline 03/01/17 Second phase will start in May Design contract signed in Q 4 2017 On-going Tender 8

RB RAIL AS UPCOMING TENDERS 2017 - DESIGN 01 Detailed technical design of the

RB RAIL AS UPCOMING TENDERS 2017 - DESIGN 01 Detailed technical design of the entire railway line in Estonia § Tender start: Q 4 2017 02 03 Technical assessment of the technical design in Estonia § Tender start: Q 4 2017 Detailed technical design for railway line in Central section, Latvia § Tender start: Q 4 2017 04 Technical assessment of the technical design - Central section, Latvia § Tender start: Q 4 2017 05 NOBO Tender for the Baltic States