I69 SOUTHWESTI610 WEST LOOP INTERCHANGE RECONSTRUCTION Stakeholder Meeting
- Slides: 10
I-69 SOUTHWEST/I-610 WEST LOOP INTERCHANGE RECONSTRUCTION Stakeholder Meeting Footer Text Date
Purpose and Needs Project Needs: § One-lane direct connectors are over capacity § Projected growth would increase demand § Safety: No shoulders, low vertical clearances, below minimum sight distances, and crashes in merge areas Project Purpose: § The purpose of the project is to improve safety and mobility and reduce congestion 2
Construction Project Overview Project Description: § Upcoming construction improvements to the I-69 Southwest/I-610 West Loop Interchange Reconstruction in Harris County § I-610 West and I-69 South are heavily congested during peak hours (I-610 West Loop is ranked as the #2 Most Congested Highway in Texas) § Utilities work has already started; construction and detour activities begin February 2018 § Construction is expected to last approximately six years § Project cost: $259 million, $87. 5 million is Texas Clear Lanes Funding 3
Project Details § § § § Reconstructs one-lane connectors to two-lane connectors Upgrades interchange to current design standards Adds shoulders on I-610 West Loop main lane bridge Increases vertical clearances Increases sight distances Adds detention ponds Eliminates major weaving 4
Overall Project Schematic LEGEND I-610 SB to I-69 NB I-610 NB to I-69 SB I-69 NB to I-610 NB I-69 SB to I-610 SB I-69 SB to I-610 NB I-69 NB to I-610 SB I-610 NB TO I-69 NB I-610 SB TO I-69 SB I-610 NB, MAIN LANES I-610 SB, MAIN LANES METRO T-RAMP UPTOWN BUS LANES CHIMNEY ROCK, EXIT RAMP I-69 SB FREEWAY POST OAK RECONSTRUCTION 5
Utility Relocations (Late 2017 – Summer 2018) § Bellaire Waterline § Telecom joint trench § Westpark § Post Oak/Richmond § Rice Ave § IH 69 NBFR § Temporary HCTRA wrong way detection relocations § Tx. DOT CTMS relocations * Utility relocations subject to change 6 6
Utility Work: • Relocations/consolidation • Late 2017 – Summer 2018 Phase 1 Phase “ 0” Initial Construction Process and Timing: First Two Phases Construction: Summer 2018 – Summer 2019: • Sound walls along I-610 SB and I-69 SB freeway • High mast lights • Portions of I-69 NB to I-610 NB I-69 SB to I-610 SB, I-69 SB to I-610 NB and I-610 main lanes • Close and reconstruct I-610 exit ramp to Fournace • I-610 widening • Storm sewer work – I-69 NB main lanes and South Rice Ave * Process and timeline subject to • Construct SB Post Oak Blvd change 7
Construction Schedule and Detour Updates § Seven-day work week § Milestone and phased direct connector construction § Phased lane closures § Smart Work Zones § Night time and weekend freeway closures Check detour updates: § Email updates (sign up to receive) § Drive. Texas. Org § Houston Tran. Star (https: //traffic. houstontranstar. org) for real-time closure and detour information § Follow us on the Tx. DOT Houston Twitter site: @Tx. DOTHouston. PIO/ @HOU 610 at 69 8
Next Steps and Contact Information § Review your feedback § Continue ongoing communications § Check traffic resources for construction and detour updates CONTACT INFORMATION FOR QUESTIONS: § Tx. DOT Houston District’s Public Information Officer 7600 Washington Ave. Houston, TX 77007 § HOU-PIOWeb. Mail@txdot. gov § Call: (713) 802 -5076 § Learn more: www. txdot. gov and Search: I-69/I-610 Interchange, or scan with your phone or tablet: 9
QUESTIONS? 10
- I-69/i-610 interchange
- Technical interchange meeting template
- Manakah yang lebih baik open loop atau close loop system
- Diagram close loop
- Statement while... wend digunakan untuk
- Fifth gear loop the loop
- Fingerprint basics
- Open loop vs closed loop in cars
- Multi loop pid controller regolatore pid multi loop
- Types of meeting
- For todays meeting