CPTE TECRGML 19062017 HIE ISOLDE 1 Tomorrow morning

  • Slides: 4
Download presentation

CPTE TE-CRG-ML 19/06/2017

CPTE TE-CRG-ML 19/06/2017

HIE ISOLDE: 1°) Tomorrow morning (20 th of June), new meeting with the Users

HIE ISOLDE: 1°) Tomorrow morning (20 th of June), new meeting with the Users in order to define the strategy as regards signals from RF in order to tune a constant power on each Cryomodule Involved: Akira Miyazaki, Walter Venturini, Antonio Tovar, Borja Fernandez Adiego Properties for RF power dissipation in the HIE-ISOLDE cavities : XLL 2. CAV 1. RFLOOPS/Status#cavity. RFdissipation XLL 2. CAV 2. RFLOOPS/Status#cavity. RFdissipation XLL 2. CAV 3. RFLOOPS/Status#cavity. RFdissipation XLL 2. CAV 4. RFLOOPS/Status#cavity. RFdissipation XLL 2. CAV 5. RFLOOPS/Status#cavity. RFdissipation Properties for current in the HIE-ISOLDE solenoids CM 1(JB 2): RPLBA. 199. XLH 0. RL. 0400 -V/REF. PLEP. FINAL#value CM 2 (JB 3): RPLBA. 199. XLH 1. RL. 0400 -V/REF. PLEP. FINAL#value CM 3 (JB 4): RPLBA. 199. XLH 2. RL. 0400 -V/REF. PLEP. FINAL#value And, these to read the acquisition values: CM 1(JB 2): RPLBA. 199. XLH 0. RL. 0400 -V/SUB_51#I_MEAS CM 2 (JB 3): RPLBA. 199. XLH 1. RL. 0400 -V/SUB_51#I_MEAS CM 3 (JB 4): RPLBA. 199. XLH 2. RL. 0400 -V/SUB_51#I_MEAS XLH 1. CAV 1. RFLOOPS/Status#cavity. RFdissipation XLH 1. CAV 2. RFLOOPS/Status#cavity. RFdissipation XLH 1. CAV 3. RFLOOPS/Status#cavity. RFdissipation XLH 1. CAV 4. RFLOOPS/Status#cavity. RFdissipation XLH 1. CAV 5. RFLOOPS/Status#cavity. RFdissipation XLH 2. CAV 1. RFLOOPS/Status#cavity. RFdissipation XLH 2. CAV 2. RFLOOPS/Status#cavity. RFdissipation XLH 2. CAV 3. RFLOOPS/Status#cavity. RFdissipation XLH 2. CAV 4. RFLOOPS/Status#cavity. RFdissipation XLH 2. CAV 5. RFLOOPS/Status#cavity. RFdissipation 2°) No writen confirmation from EN-CV as regards the intervention on the water Tower 3°) No explanation of the LHe level losses on Friday the 2 nd of June 18/10/2021 3