AWIPS Continuous Technology Refresh CTR AWIPS Software CTR

  • Slides: 4
Download presentation
AWIPS Continuous Technology Refresh (CTR) AWIPS Software CTR AWIPS TO 11 DR 2 Read.

AWIPS Continuous Technology Refresh (CTR) AWIPS Software CTR AWIPS TO 11 DR 2 Read. Me Nov 18, 2009 This document includes data that shall not be duplicated, used, or disclosed – in whole or in part – outside the Government for any purpose other than to the extent provided in contract DG 133 W-05 -CQ-1067. However, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the contract. This restriction does not limit the Government’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in all sheets.

AWIPS TO 11 DR 2 Read. Me n n n n Added LDM with

AWIPS TO 11 DR 2 Read. Me n n n n Added LDM with edex. Bridge and flow tags MHS outbound interfaces to GFE, Avn. FPS, and Text. WS Attachments New EDEX installers Added Objective Analysis for observations to Volume Browser along with numerous updates Created “c/C++” interface to AWIPS-II for legacy applications and LDM – Support for FSI, async. Scheduler, HWR FSI ready for testing Additional Obs CAVE renderings – Local Storm Reports, SIGMETs, Updates to SCAN and SNOW Bin. Lightning Decoder refactored to allow binary removal Refactored Topo: now 315 M from 1. 8 G Added configurable mouse button through CAVE preferences Updated to Camel 2. 0 and added auto CAVE reconnect Updated to Geo. Tools 2. 5. 8 Nov. 18, 2009 Page 2

Ingest Deployment Detail Architecture / SW Design Update LDM message interface, Radar Server, LDAD

Ingest Deployment Detail Architecture / SW Design Update LDM message interface, Radar Server, LDAD Design <NAS> Raw Archive notifications Data Files <CP> LDM Data Files <PX> Radar Server Message Sender Msg Sender Data Files <PX> LDAD Queue Endpoints Msg Sender File & Queue Endpoints Routed Together Increased Flexibility IPC Shared Memory Queue . /sbn/. . /manual File Endpoints Raw Read From Archive EDEX Cluster Distribution. Srv EDEX Plug In Nov. 18, 2009 Page 3

DRs Resolved n 125 DRs Resolved and Included in DR 2 – 93 TTRs

DRs Resolved n 125 DRs Resolved and Included in DR 2 – 93 TTRs Resolved – 80 FBSO DRs Resolved – 3 Special Handling DRs Resolved – Ready for NWS test and validation – See document: AWIPS DR 2 Completed Tickets. pdf * * Note: DR descriptions and test procedures can be found in the daily DR report Nov. 18, 2009 Page 4