Status of the FMD LHCC referees meeting 10

  • Slides: 12
Download presentation
Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels

Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr Institute LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 1

Prototype status Hamamatsu sensor prototype: well within specs → Inner production started, delivery end

Prototype status Hamamatsu sensor prototype: well within specs → Inner production started, delivery end November → Outer design done, prototype ordered IDEAS inner hybrid prototype: VA 1_3 chips within specs, all produced → 2 nd hybrid prototype delivered and tested → Hybrid production starting Prototype module (sandwich) status: MIP particles seen (680 Me. V e-) Noise level as expected or better → 2 nd prototype tested in e- beam early October Readout electronics status: → Prototype VA 1 -Digitizer-RCU chain working Mechanics: → TPC-ITS-T 0 -V 0 -FMD assembly test done LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 2

Silicon sensors Inner prototype: 300 μm thick 2 x 512 strips Bonding pads 250

Silicon sensors Inner prototype: 300 μm thick 2 x 512 strips Bonding pads 250 μm pitch Leakage current (specs < 3 μA) 300 n. A Bias voltage 300 V Detector capacitance 13 cm 2 n. F Bonding pads LHCC referees meeting, 10 October 2005 Bias voltage Børge Svane Nielsen, NBI 300 V 3

Prototype module § 3 prototype inner detector sandwich modules built: Hybrids glued to sensors

Prototype module § 3 prototype inner detector sandwich modules built: Hybrids glued to sensors with thin ceramic spacers Readout pads bonded to silicon at periphery of hybrid bonds hybrid sensor LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 4

LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 5

LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 5

Beam test of modules 680 Me. V e- beam test at ASTRID ring at

Beam test of modules 680 Me. V e- beam test at ASTRID ring at Aarhus University, DK FMD module e- beam LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 6

Noise estimate Inner sensor noise estimate Noise Source Short strips Long Strips (14 mm)

Noise estimate Inner sensor noise estimate Noise Source Short strips Long Strips (14 mm) (50 mm) Elect. + cap. 263 e- 309 e- Bias 208 e- 47 e- 88 e- 338 e- 390 e- 22000 e- Ileak Total Signal (1 MIP) Signal/Noise 65 56 LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 7

Test beam results, July § Tested prototype with high energy electron beam (680 Me.

Test beam results, July § Tested prototype with high energy electron beam (680 Me. V) § Clear signal peak § Signal/Noise 60 LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 8

Test beam results, October S/N=56 S/N=47 S/N=58 S/N=56 LHCC referees meeting, 10 October 2005

Test beam results, October S/N=56 S/N=47 S/N=58 S/N=56 LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 9

Read-out electronics Lab test with sandwich and prototype Digitizer+RCU readout RCU Good progress with

Read-out electronics Lab test with sandwich and prototype Digitizer+RCU readout RCU Good progress with prototype Digitizer and USB version of RCU - prototype Digitizer card + firmware built - complete Digitizer+RCU chain works - first beam tests with full electronics chain successfull - preparing for final version LHCC referees meeting, 10 October 2005 Digitizer Børge Svane Nielsen, NBI 10

Integration test Installation of FMD 3 and FMD 2 together with ITS, etc. Beam

Integration test Installation of FMD 3 and FMD 2 together with ITS, etc. Beam pipe support LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 11

Conclusions § FMD prototype modules show excellent signal to noise characteristics ( 60: 1).

Conclusions § FMD prototype modules show excellent signal to noise characteristics ( 60: 1). § Hit sharing accounts for most of the particles seen between the MIP peak and the noise peak. § Production of inner sensors and hybrids started. § Final design of outer module, digitizer and mechanics progressing well. LHCC referees meeting, 10 October 2005 Børge Svane Nielsen, NBI 12