Interconnection Policy Working Group Meeting Con Edison Interconnection

  • Slides: 4
Download presentation
Interconnection Policy Working Group Meeting Con Edison Interconnection Update Joe White whitejoe@coned. com Distributed

Interconnection Policy Working Group Meeting Con Edison Interconnection Update Joe White whitejoe@coned. com Distributed Generation Ombudsman 10/21/2020 1

Interconnection Policy Working Group Meeting Con Edison Updates Agenda Secondary Network Screening Performance Upcoming

Interconnection Policy Working Group Meeting Con Edison Updates Agenda Secondary Network Screening Performance Upcoming events Developer Focus Group Winter Workshop 2

Interconnection Policy Working Group Meeting Con Edison Updates – SIR Secondary Network Screens Performance

Interconnection Policy Working Group Meeting Con Edison Updates – SIR Secondary Network Screens Performance • From 2/3/2020 through 10/16/2020 – 156 applications qualified for the network screens from 301 applications received – 57 network applications (5. 1 MW) Passed the screens • Equates to 36. 5% of network applications received avoided a CESIR • Average application size was 91 k. W • 10/57 are currently cancelled representing 781 k. W • 3/57 are currently online representing 248 k. W – 99 network applications Failed 1 or more of the screen • Average size was 1. 2 MW • 20/99 are cancelled representing 2. 9 MW • 79/99 are still in the SIR process representing 118. 2 MW 3

Interconnection Policy Working Group Meeting Con Edison Updates – Interconnection Focus • Virtual Developer

Interconnection Policy Working Group Meeting Con Edison Updates – Interconnection Focus • Virtual Developer Workshops in 2020 – – Second Annual Energy Storage Day Fall 2020 Developer Workshop Fall 2020 • Ways to contact Con Edison: – – – Work with your Project Manager (CPM) Email Con Edison @ dgexpert@coned. com Joe White DG Ombudsman @ whitejoe@coned. com • Please be sure to view our website for valuable information @ www. coned. com/dg 4