Interconnection Policy Working Group Meeting Con Edison Interconnection Update Joe White whitejoe@coned. com Distributed Generation Ombudsman 10/21/2020 1
Interconnection Policy Working Group Meeting Con Edison Updates Agenda Secondary Network Screening Performance Upcoming events Developer Focus Group Winter Workshop 2
Interconnection Policy Working Group Meeting Con Edison Updates – SIR Secondary Network Screens Performance • From 2/3/2020 through 10/16/2020 – 156 applications qualified for the network screens from 301 applications received – 57 network applications (5. 1 MW) Passed the screens • Equates to 36. 5% of network applications received avoided a CESIR • Average application size was 91 k. W • 10/57 are currently cancelled representing 781 k. W • 3/57 are currently online representing 248 k. W – 99 network applications Failed 1 or more of the screen • Average size was 1. 2 MW • 20/99 are cancelled representing 2. 9 MW • 79/99 are still in the SIR process representing 118. 2 MW 3
Interconnection Policy Working Group Meeting Con Edison Updates – Interconnection Focus • Virtual Developer Workshops in 2020 – – Second Annual Energy Storage Day Fall 2020 Developer Workshop Fall 2020 • Ways to contact Con Edison: – – – Work with your Project Manager (CPM) Email Con Edison @ dgexpert@coned. com Joe White DG Ombudsman @ whitejoe@coned. com • Please be sure to view our website for valuable information @ www. coned. com/dg 4