X-ray Pump-Probe Instrument David Fritz XPP Instrument Scientist June 9, 2009 X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 1 1 David FRITZ [email protected] stanford. edu

Outline • • • Overview XPP Update from previous FAC Component Status • Early commissioning? – Design – Procurement and Fabrication X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 2 2 David FRITZ [email protected] stanford. edu

XPP Instrument Overview X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 3 3 David FRITZ [email protected] stanford. edu

Update from Fall FAC • Received advanced procurement approval December 18, 2009 for: – Sample Goniometer – Detector Mover • Final Instrument Design Review successfully held Feb 24, 2009 – Procurement authorization for everything except OPA, multipass amplifier • Baseline change request processed to include large offset monochromator system for XPP – Procurement documents were reviewed at the XCS advanced procurement review April 24, 2009 and the documents are being updated X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 4 4 David FRITZ [email protected] stanford. edu

Laser Tables and Enclosure 5’ x 12’ 5’ x 6’ • Completed design of laser containment system and optical table layouts – • Design review November 14, 2008 Laser tables are fabricated and are in storage in the control room. – Anchor holes are drilled and tables are ready to be installed once granite is installed • Enclosure PO placed April 20, 2009 X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 5 5 David FRITZ [email protected] stanford. edu

X-ray Optics Tables • Completed final design of X-ray optics tables – Final design review January 26, 2009 • Granite PO placed April 14, 2009 – Expected to be delivered in July w/ rails installed • Anchor holes for the earthquake restraints already drilled X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 6 6 David FRITZ [email protected] stanford. edu

Sample Goniometer • Received advanced procurement authorization Dec. 18, 2008 • Goniometer PO awarded to Huber April 1, 2009 – Expected to be delivered in April 1, 2010 • Vendor site visit scheduled for July 17, 2009 X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 7 7 David FRITZ [email protected] stanford. edu

Detector Mover • • • Received advanced procurement authorization Dec. 18, 2008 Robot basing design study completed in January, 2009 Robot PO awarded March 31, 2009 – Expected to be delivered this week • Robot support design review held May 22, 2009 – Detailed fabrication drawings in process • Robot software PO in process X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 8 8 David FRITZ [email protected] stanford. edu

Hutch Facilities • Work benches and storage cabinets received and installed • Tools and tool boxes PO placed March 24, 2009 – Expected to be delivered and installed in August • Raised floor PO in process (req submitted March 10) • Cable trays are here X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 9 9 David FRITZ [email protected] stanford. edu

Laser Equipment • RFP issues for 20 Ghz Oscilloscope • Various optics and optomechanics PO’s in process – Much more to be procured over the next 6 months • Hopefully procurement authorization will be given for OPA and multipass amplifier shortly so req’s can be placed X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 10 10 David FRITZ [email protected] stanford. edu

Updated Schedule FY 08 FY 09 FY 10 FY 11 Preliminary Design Reviews X-ray Optics Support Tables – August 2008 Detector Mover Support – May 2009 XPP Advanced Procurement Review – November 2008 Final Instrument Design Review – February 2009 Final Design Reviews Optical Table LayoutContainment – November 2008 X-ray Optics Support Tables – January 2009 Detector Mover Support – May 2009 CD-3 - July 2009 Award PO Sample Goniometer – April 2009 Hutch Facilities – June 2009 Detector Mover – March 2009 X-ray Optics Support Tables – April 2009 Laser Containment System – April 2009 Optical Tables – April 2009 Detector Mover Support – July 2009 Receive Optical Tables – May 2009 Hutch Facilities – August 2009 X-ray Optics Support Tables – July 2009 Laser Containment System – July 2009 Detector Mover – June 2009 Sample Goniometer – April 2010 Detector Mover Support – September 2009 Ready for User Run – July 2010 X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 11 11 David FRITZ [email protected] stanford. edu

Early Commissioning? • • • X-ray support tables are expected to be installed in July Vacuum transport can/will be installed in the summer as well Prototype X-ray diagnostics will be ready in the fall Would be extremely beneficial to receive some early “machine time” to test prototype diagnostics, optics, materials, etc… – 4 -8 hours per week? ? ? This would significantly reduce the risk and commissioning time allocated to the dedicated XPP instrument commissioning X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 12 12 David FRITZ [email protected] stanford. edu
Xray PumpProbe Instrument David Fritz XPP Instrument Scientist
Xray PumpProbe Instrument David Fritz XPP Instrument Scientist
LUSI Xray PumpProbe Instrument David Fritz XPP Instrument
Xray PumpProbe Instrument David Fritz Instrument Overview Instrument
MERIT PumpProbe Data Analysis Outline q The pumpprobe
MERIT PumpProbe Data Analysis Outline q The pumpprobe
MERIT PumpProbe Data Analysis Outline q The pumpprobe
Fritz Perls Albert Ellis PRESENTATION 3 Fritz Perls
Grundformen der Angst nach Fritz Riemann Fritz Riemann
Fritz Perls Albert Ellis PRESENTATION 3 Fritz Perls
XRay Presentation XRay Products By Shimadzu XRF XRay
LUSI Coherent XRay Imaging Instrument Final Instrument Design