X-ray Pump-Probe Instrument David Fritz XPP Instrument Scientist June 9, 2009 X-ray Pump-Probe Instrument

X-ray Pump-Probe Instrument David Fritz XPP Instrument Scientist June 9, 2009 X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 1 1 David FRITZ [email protected] stanford. edu

Outline • • • Overview XPP Update from previous FAC Component Status • Early

Outline • • • Overview XPP Update from previous FAC Component Status • Early commissioning? – Design – Procurement and Fabrication X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 2 2 David FRITZ [email protected] stanford. edu

XPP Instrument Overview X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 3 3 David

XPP Instrument Overview X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 3 3 David FRITZ [email protected] stanford. edu

Update from Fall FAC • Received advanced procurement approval December 18, 2009 for: –

Update from Fall FAC • Received advanced procurement approval December 18, 2009 for: – Sample Goniometer – Detector Mover • Final Instrument Design Review successfully held Feb 24, 2009 – Procurement authorization for everything except OPA, multipass amplifier • Baseline change request processed to include large offset monochromator system for XPP – Procurement documents were reviewed at the XCS advanced procurement review April 24, 2009 and the documents are being updated X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 4 4 David FRITZ [email protected] stanford. edu

Laser Tables and Enclosure 5’ x 12’ 5’ x 6’ • Completed design of

Laser Tables and Enclosure 5’ x 12’ 5’ x 6’ • Completed design of laser containment system and optical table layouts – • Design review November 14, 2008 Laser tables are fabricated and are in storage in the control room. – Anchor holes are drilled and tables are ready to be installed once granite is installed • Enclosure PO placed April 20, 2009 X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 5 5 David FRITZ [email protected] stanford. edu

X-ray Optics Tables • Completed final design of X-ray optics tables – Final design

X-ray Optics Tables • Completed final design of X-ray optics tables – Final design review January 26, 2009 • Granite PO placed April 14, 2009 – Expected to be delivered in July w/ rails installed • Anchor holes for the earthquake restraints already drilled X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 6 6 David FRITZ [email protected] stanford. edu

Sample Goniometer • Received advanced procurement authorization Dec. 18, 2008 • Goniometer PO awarded

Sample Goniometer • Received advanced procurement authorization Dec. 18, 2008 • Goniometer PO awarded to Huber April 1, 2009 – Expected to be delivered in April 1, 2010 • Vendor site visit scheduled for July 17, 2009 X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 7 7 David FRITZ [email protected] stanford. edu

Detector Mover • • • Received advanced procurement authorization Dec. 18, 2008 Robot basing

Detector Mover • • • Received advanced procurement authorization Dec. 18, 2008 Robot basing design study completed in January, 2009 Robot PO awarded March 31, 2009 – Expected to be delivered this week • Robot support design review held May 22, 2009 – Detailed fabrication drawings in process • Robot software PO in process X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 8 8 David FRITZ [email protected] stanford. edu

Hutch Facilities • Work benches and storage cabinets received and installed • Tools and

Hutch Facilities • Work benches and storage cabinets received and installed • Tools and tool boxes PO placed March 24, 2009 – Expected to be delivered and installed in August • Raised floor PO in process (req submitted March 10) • Cable trays are here X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 9 9 David FRITZ [email protected] stanford. edu

Laser Equipment • RFP issues for 20 Ghz Oscilloscope • Various optics and optomechanics

Laser Equipment • RFP issues for 20 Ghz Oscilloscope • Various optics and optomechanics PO’s in process – Much more to be procured over the next 6 months • Hopefully procurement authorization will be given for OPA and multipass amplifier shortly so req’s can be placed X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 10 10 David FRITZ [email protected] stanford. edu

Updated Schedule FY 08 FY 09 FY 10 FY 11 Preliminary Design Reviews X-ray

Updated Schedule FY 08 FY 09 FY 10 FY 11 Preliminary Design Reviews X-ray Optics Support Tables – August 2008 Detector Mover Support – May 2009 XPP Advanced Procurement Review – November 2008 Final Instrument Design Review – February 2009 Final Design Reviews Optical Table LayoutContainment – November 2008 X-ray Optics Support Tables – January 2009 Detector Mover Support – May 2009 CD-3 - July 2009 Award PO Sample Goniometer – April 2009 Hutch Facilities – June 2009 Detector Mover – March 2009 X-ray Optics Support Tables – April 2009 Laser Containment System – April 2009 Optical Tables – April 2009 Detector Mover Support – July 2009 Receive Optical Tables – May 2009 Hutch Facilities – August 2009 X-ray Optics Support Tables – July 2009 Laser Containment System – July 2009 Detector Mover – June 2009 Sample Goniometer – April 2010 Detector Mover Support – September 2009 Ready for User Run – July 2010 X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 11 11 David FRITZ [email protected] stanford. edu

Early Commissioning? • • • X-ray support tables are expected to be installed in

Early Commissioning? • • • X-ray support tables are expected to be installed in July Vacuum transport can/will be installed in the summer as well Prototype X-ray diagnostics will be ready in the fall Would be extremely beneficial to receive some early “machine time” to test prototype diagnostics, optics, materials, etc… – 4 -8 hours per week? ? ? This would significantly reduce the risk and commissioning time allocated to the dedicated XPP instrument commissioning X-ray Pump-Probe Instrument FAC Meeting, June 9 2009 12 12 David FRITZ [email protected] stanford. edu