X Ray Transport Optics and Diagnostics Overview LCLS

  • Slides: 24
Download presentation
X Ray Transport, Optics, and Diagnostics, Overview LCLS Week April 4 -6, 2005 April

X Ray Transport, Optics, and Diagnostics, Overview LCLS Week April 4 -6, 2005 April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

Outline XTOD Scope & Organization XTOD Status and Technical Highlights XTOD FY 05 Work

Outline XTOD Scope & Organization XTOD Status and Technical Highlights XTOD FY 05 Work plan April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

1. 5 Scope: Front End Enclosure/ Near Experimental Hall NEH PPS Muon shield Front

1. 5 Scope: Front End Enclosure/ Near Experimental Hall NEH PPS Muon shield Front End Enclosure Slit A Flipper Mirror PPS Comissioning: Spectrometers, Total Energy Solid Attenuator Slit B Photon Beam NFOV Direct Imager Indirect Imager WFOV Direct Imager Gas Attenuator Fast close valve Electron Beam April 4 -8, 2005 XTOD Overview Muon shield Other: Direct Imager Fixed masks Electron Dump UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

FEH Pulse Split and Delay 1. 5 Scope: NEH, Tunnel, FEH X-Ray Beam Transport

FEH Pulse Split and Delay 1. 5 Scope: NEH, Tunnel, FEH X-Ray Beam Transport Tunnel System Monochrometer Far Hall Direct Imager and Tank NEH Flipper Mirror April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

XTOD Staff-up complete for FY 05 Rodney Victorine Resource Manager Jolyn Scholes Resource Analyst

XTOD Staff-up complete for FY 05 Rodney Victorine Resource Manager Jolyn Scholes Resource Analyst EE E. Ables ME P. Duffy M. Mckernan S. Shen J. Trent R. Bionta LLNL LCLS Project Leader D. Mc. Mahon XTOD Project Engineer R. Beale Hazards Control Comp K. Fong S. Lewis L. Ott Physics S. Friedrich S. Hau-Reige M. Pivovaroff D. Ryutov J. Mc. Namara Admin. M. Eberstein G. Otani Procurement DNT R. London UC Davis H. Baldis Remainder of FY 05 P 3 labor "loosly" matrixed, i. e L. Li - thermal analysis, Bajt, multilayers, shops, finance… April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

Standing Meetings at LLNL XTOD Staff Meeting @LLNL, every Monday, 11: 00 AM, B

Standing Meetings at LLNL XTOD Staff Meeting @LLNL, every Monday, 11: 00 AM, B 142 1 st floor conf. Rm. Discussion of work plan for the week XTOD Topical Meeting @LLNL, every Wednesday, 2: 00 PM, B 142 2 nd Floor Topics vary ie. Gas Attenuator, M&V, Controls, etc. LCLS Community welcome to attend any of these meetings E-mail Jane mcnamara 20@llnl. gov at least 1 day ahead for badge. April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

Status of Major XTOD Instrumentation WBS Title Need Status FY 05 Plans 1. 5.

Status of Major XTOD Instrumentation WBS Title Need Status FY 05 Plans 1. 5. 2 Controls Comiss Pre-Concept Specify & Cost 1. 5. 3 Mechanical & Vacuum Comiss Concept FEE Prelim Eng 1. 5. 4. 2. 2 Fixed mask Facility Spec wait Calc Backgrounds 1. 5. 4. 2. 3 Slits Facility Concept Prelim Eng 1. 5. 4. 2. 5 Gas attenuator Comiss Concept Prelim Eng, Proto & Simulation 1. 5. 4. 2. 8 Solid attenuator Comiss Concept 1. 5. 4. 4. 2 Far Hall monochromater Users Schedule hold 1. 5. 4. 4. 3 Far Hall pulse split and delay Users Concept Prototype 1. 5. 5. 2 Modeling and simulation Comiss In progress Instrument Sim 1. 5. 5. 3. 1 Direct Imager Comiss Detailed Sims Detailed Eng Proto & Sim 1. 5. 5. 3. 2 Indirect Imager Comiss Concept Simulation, R&D 1. 5. 5. 4. 2 Total energy measurement Comiss Concept Proto & Sim 1. 5. 5. 4. 4 Spectrometer(s) Comiss Options need to be prooven Simulation, R&D 1. 5. 4. 2. 4 Flipper Mirror Users Schedule hold April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

HEPOM* Simulations 3 cm dia. Al Collimators 5 cm dia. Ta Collimators 5 cm

HEPOM* Simulations 3 cm dia. Al Collimators 5 cm dia. Ta Collimators 5 cm dia. Al Collimators *High Energy Pick Off Mirror April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

Status (cont. ) WBS Title Need Status FY 05 Plans 1. 5. 2 Controls

Status (cont. ) WBS Title Need Status FY 05 Plans 1. 5. 2 Controls Comiss Pre-Concept Specify & Cost 1. 5. 3 Mechanical & Vacuum Comiss Concept FEE Prelim Eng 1. 5. 4. 2. 2 Fixed mask Facility Spec wait Calc Backgrounds 1. 5. 4. 2. 3 Slits Facility Concept Prelim Eng 1. 5. 4. 2. 5 Gas attenuator Comiss Concept Prelim Eng, Proto & Simulation 1. 5. 4. 2. 8 Solid attenuator Comiss Concept 1. 5. 4. 4. 2 Far Hall monochromater Users Schedule hold 1. 5. 4. 4. 3 Far Hall pulse split and delay Users Concept Prototype 1. 5. 5. 2 Modeling and simulation Comiss In progress Instrument Sim 1. 5. 5. 3. 1 Direct Imager Comiss Detailed Sims Detailed Eng Proto & Sim 1. 5. 5. 3. 2 Indirect Imager Comiss Concept Simulation, R&D 1. 5. 5. 4. 2 Total energy measurement Comiss Concept Proto & Sim 1. 5. 5. 4. 4 Spectrometer(s) Comiss Options need to be prooven Simulation, R&D 1. 5. 4. 2. 4 Flipper Mirror Users Schedule hold April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

Wide Field of View Direct Imager Photoelectrons Optic Camera Scintillators April 4 -8, 2005

Wide Field of View Direct Imager Photoelectrons Optic Camera Scintillators April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

Status (cont. ) WBS Title Need Status FY 05 Plans 1. 5. 2 Controls

Status (cont. ) WBS Title Need Status FY 05 Plans 1. 5. 2 Controls Comiss Pre-Concept Specify & Cost 1. 5. 3 Mechanical & Vacuum Comiss Concept FEE Prelim Eng 1. 5. 4. 2. 2 Fixed mask Facility Spec wait Calc Backgrounds 1. 5. 4. 2. 3 Slits Facility Concept Prelim Eng 1. 5. 4. 2. 5 Gas attenuator Comiss Concept Prelim Eng, Proto & Simulation 1. 5. 4. 2. 8 Solid attenuator Comiss Concept 1. 5. 4. 4. 2 Far Hall monochromater Users Schedule hold 1. 5. 4. 4. 3 Far Hall pulse split and delay Users Concept Prototype 1. 5. 5. 2 Modeling and simulation Comiss In progress Instrument Sim 1. 5. 5. 3. 1 Direct Imager Comiss Detailed Sims Detailed Eng Proto & Sim 1. 5. 5. 3. 2 Indirect Imager Comiss Concept Simulation, R&D 1. 5. 5. 4. 2 Total energy measurement Comiss Concept Proto & Sim 1. 5. 5. 4. 4 Spectrometer(s) Comiss Options need to be prooven Simulation, R&D 1. 5. 4. 2. 4 Flipper Mirror Users Schedule hold April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

Indirect Imager Simulation Spontaneous + e FEL 2. 90068 degrees 1 m 101 mm

Indirect Imager Simulation Spontaneous + e FEL 2. 90068 degrees 1 m 101 mm Be/Si. C 300 layer pairs 60 Angstrom period Gamma = 0. 2 On 0. 5 mm thick Si 10 cm diameter ~5% efficient @ 8 ke. V April 4 -8, 2005 XTOD Overview 0. 1% FEL with E>2 ke. V UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

Status (cont. ) WBS Title Need Status FY 05 Plans 1. 5. 2 Controls

Status (cont. ) WBS Title Need Status FY 05 Plans 1. 5. 2 Controls Comiss Pre-Concept Specify & Cost 1. 5. 3 Mechanical & Vacuum Comiss Concept FEE Prelim Eng 1. 5. 4. 2. 2 Fixed mask Facility Spec wait Calc Backgrounds 1. 5. 4. 2. 3 Slits Facility Concept Prelim Eng 1. 5. 4. 2. 5 Gas attenuator Comiss Concept Prelim Eng, Proto & Simulation 1. 5. 4. 2. 8 Solid attenuator Comiss Concept 1. 5. 4. 4. 2 Far Hall monochromater Users Schedule hold 1. 5. 4. 4. 3 Far Hall pulse split and delay Users Concept Prototype 1. 5. 5. 2 Modeling and simulation Comiss In progress Instrument Sim 1. 5. 5. 3. 1 Direct Imager Comiss Detailed Sims Detailed Eng Proto & Sim 1. 5. 5. 3. 2 Indirect Imager Comiss Concept Simulation, R&D 1. 5. 5. 4. 2 Total energy measurement Comiss Concept Proto & Sim 1. 5. 5. 4. 4 Spectrometer(s) Comiss Options need to be prooven Simulation, R&D 1. 5. 4. 2. 4 Flipper Mirror Users Schedule hold April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

Total Energy Calorimeter Concept Cooler CMR Sensor Sapphire heat sink Si or Be 1

Total Energy Calorimeter Concept Cooler CMR Sensor Sapphire heat sink Si or Be 1 x 1 x. 5 mm Xray Beam Energy Absorbed in 500 um Silicon (0. 01% FEL+Spontaneous) SINDA T vs. t Direction of heat flow CMR W vs T 100 W R Electrothermal Feedback: T April 4 -8, 2005 XTOD Overview Apply constant V Measure I Calculate P UCRL-PRES-XXXXX Cool Down Time is about 0. 6 ms Richard M. Bionta bionta 1@llnl. gov

Status (cont. ) WBS Title Need Status FY 05 Plans 1. 5. 2 Controls

Status (cont. ) WBS Title Need Status FY 05 Plans 1. 5. 2 Controls Comiss Pre-Concept Specify & Cost 1. 5. 3 Mechanical & Vacuum Comiss Concept FEE Prelim Eng 1. 5. 4. 2. 2 Fixed mask Facility Spec wait Calc Backgrounds 1. 5. 4. 2. 3 Slits Facility Concept Prelim Eng 1. 5. 4. 2. 5 Gas attenuator Comiss Concept Prelim Eng, Proto & Simulation 1. 5. 4. 2. 8 Solid attenuator Comiss Concept 1. 5. 4. 4. 2 Far Hall monochromater Users Schedule hold 1. 5. 4. 4. 3 Far Hall pulse split and delay Users Concept Prototype 1. 5. 5. 2 Modeling and simulation Comiss In progress Instrument Sim 1. 5. 5. 3. 1 Direct Imager Comiss Detailed Sims Detailed Eng Proto & Sim 1. 5. 5. 3. 2 Indirect Imager Comiss Concept Simulation, R&D 1. 5. 5. 4. 2 Total energy measurement Comiss Concept Proto & Sim 1. 5. 5. 4. 4 Spectrometer(s) Comiss Options need to be prooven Simulation, R&D 1. 5. 4. 2. 4 Flipper Mirror Users Schedule hold April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

FY 05 Tasking and Personnel Assignments WBS Item Person 1. 5. 1 Mgt &

FY 05 Tasking and Personnel Assignments WBS Item Person 1. 5. 1 Mgt & Safety Bionta, Mc. Mahon, Beale, Victorine, Mc. Namara, Otani 1. 5. 5. 4. 2 Total Energy Friedrich, Ables, Ott, Li, RDC Lab 1. 5. 5. 4. 4 Spectrometer Pivovaroff, Bajt, Spillar, Chapman, Fong 1. 5. 4. 2. 6 TTF Damage Experiment London, Hau-Riege, Ryutov, Mckernan 1. 5. 5. 2 Beam Simulations Ott, Fong 1. 5. 5. 3. 1 Direct Imagers Ables, Ott, Mckernan 1. 5. 4. 2 Gas Atten Shen + B 132 Lab, Baldis, Ryutov 1. 5. 3. 2 Mech/Vac Design Trent, Duffy, Eberstein 1. 5. 2. 2 Controls Lewis 1. 5. 5. 3. 2 Indirect Imagers Pivovaroff, Bajt April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

TTF Damage experiment set to test models at 40 e. V Sample cassette April

TTF Damage experiment set to test models at 40 e. V Sample cassette April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

FY 05 Tasking and Personnel Assignments WBS Item Person 1. 5. 1 Mgt &

FY 05 Tasking and Personnel Assignments WBS Item Person 1. 5. 1 Mgt & Safety Bionta, Mc. Mahon, Beale, Victorine, Mc. Namara, Otani, Eberstein 1. 5. 5. 4. 2 Total Energy Friedrich, Ables, Ott, Li, RDC Lab 1. 5. 5. 4. 4 Spectrometer Pivovaroff, Bajt, Spillar, Chapman, Fong 1. 5. 4. 2. 6 TTF Damage Experiment London, Hau-Riege, Ryutov, Mckernan 1. 5. 5. 2 Beam Simulations Ott, Fong 1. 5. 5. 3. 1 Direct Imagers Ables, Ott, Mckernan, Trent, Duffy 1. 5. 4. 2 Gas Atten Shen + B 132 Lab, Baldis, Ryutov 1. 5. 3. 2 Mech/Vac Design Trent, Duffy, Eberstein 1. 5. 2. 2 Controls Lewis 1. 5. 5. 3. 2 Indirect Imagers Pivovaroff, Bajt, Eberstein April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

XTOD work flow will follow ISMS practices for each WBS element LCLS Physics Requirements

XTOD work flow will follow ISMS practices for each WBS element LCLS Physics Requirements WBS Dictionary ICDs Hardware Installation Operations Servicing ERDs Designs April 4 -8, 2005 XTOD Overview Eng. Safety Notes UCRL-PRES-XXXXX IWS (Integrated Work Sheet) is LLNL wide eform for documenting ISMS for each work package: Scope Hazards Controls Roles (RI…) Responsibilities Training Signoff Certified Parts Lists Richard M. Bionta bionta 1@llnl. gov

IWSs for LCLS XTOD Prototypes and WBS Elements Short term IWS: Cover Prototype development

IWSs for LCLS XTOD Prototypes and WBS Elements Short term IWS: Cover Prototype development and testing, offsite and on-site: Gas Attenuator prototype in B 132 (in progress) Direct Imager B 272, SSRL X-Ray Box tests … Drive Laser R&D, B 480 Add SLAC personnel to IWS + training April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Long Term IWS: Cover Each WBS deliverable: Fabrication & Assembly Bench testing Transport to SLAC Installation Commissioning Operation Servicing Richard M. Bionta bionta 1@llnl. gov

FY 05 Goals Mechanical and Vacuum Cost estimate and Engineering Plan through NEH IWS's,

FY 05 Goals Mechanical and Vacuum Cost estimate and Engineering Plan through NEH IWS's, ICD's, and ERD's Detailed plans / parts for prototype: Gas Attenuator, Control system tests, concepts for monitoring beam and attenuation Total Energy, 1 pixel Direct Imager, for 826 e. V tests at SSRL Monte-Carlo simulations of FEE instruments and alignment Document in ERDs Apertures, Expected light levels, Reflectivity, … April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

FY 05 Goals (cont. ) Conceptual designs and sample optics for Indirect Imager Spectrometer

FY 05 Goals (cont. ) Conceptual designs and sample optics for Indirect Imager Spectrometer Controls Cost estimate and Engineering Plan Prototype Controls Gas Attenuator Direct Imager TTF Damage Experiment Samples Fabricated and Documented April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

Other XTOD presentations this week XTOD Controls - Steve Lewis in Controls breakout session

Other XTOD presentations this week XTOD Controls - Steve Lewis in Controls breakout session XTOD Front-End Instrumentation - Bionta in Photon breakout session Also available during breakout sessions: Don Mc. Mahon - XTOD Project Engineering Elden Ables - Imaging Cameras, Total Energy Linda Ott - XTOD Beam Modeling and Imaging Software Release Stewart Shen - Gas Attenuator Dmitri Ryutov - Thermal deformation sensor April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov

XTOD Overview Summary FY 05 staffing plan implemented FY 05 work plan begun Near

XTOD Overview Summary FY 05 staffing plan implemented FY 05 work plan begun Near term emphasis on Commissioning and FEE April 4 -8, 2005 XTOD Overview UCRL-PRES-XXXXX Richard M. Bionta bionta 1@llnl. gov