Wroclaw 14. 02. 2019 CTL-EL Assembly Positioning, alignment strategy and assembly steps Maciej Matkowski Project Manager maciej. matkowski@kriosystem. co. pl CRYOGENICS IS OUR PASSION www. kriosystem. com. p l
Supports bolting We expect to have drilled holes in the tunel and CTL Gallery. When the holes are ready we will put supports on place and we will bolt them with proper anchors. www. kriosystem. com. p l
VB unloading CDS-EL: Unloading with overhead crane by ESS rigging team. • All material related to lifting >1 year must be inspected and documented before use according to AFS 2003: 6. • Valve box: Traverse for lifting VB is attached to one hook so it is possible to rotate them while hanging in the overhead crane. www. kriosystem. com. p l
VB transport www. kriosystem. com. p l
VB transport www. kriosystem. com. p l
VB transport www. kriosystem. com. p l
Transport route www. kriosystem. com. p l
Supports assembly www. kriosystem. com. p l
CTL-EL Line positioning and alignment • Lowest point in tunnel – 3, 17 m • Highest point on VB – 3, 04 m www. kriosystem. com. p l
CTL-EL valve box positioning and alignment www. kriosystem. com. p l
CTL-EL valve box positioning and alignment www. kriosystem. com. p l
CTL-EL Line positioning and alignment www. kriosystem. com. p l
Welding process pipes VT, pressure and helium leak tests MLI wrapping www. kriosystem. com. p l
Welding process pipes VT, pressure and helium leak tests MLI wrapping www. kriosystem. com. p l
Thermal shield assembly and MLI wrapping www. kriosystem. com. p l
OJ assembly Tests www. kriosystem. com. p l
Aux Supports assembly www. kriosystem. com. p l
Assembly and welding aux lines Tests of aux lines www. kriosystem. com. p l
Assembly and welding aux lines Tests of aux lines www. kriosystem. com. p l