WMO SPICE Valdai Russia Site Configuration Update Oct
- Slides: 8
WMO SPICE Valdai (Russia) Site Configuration Update Oct 10 th, 2012 Information from Anton Timofeev Prepared by Rodica Nitu
Site Layout • outstanding
Site References • Reference instruments • R 0 – Valday bush system. With multiple Tretyakov collectors and shields • • R 1: Tretyakov gauge in DFIR: – – outer fence diameter 12 m, slat height 3. 5 m inner fence diameter 4 m, slat height 3. 0 m gauge mounted at 3. 0 m, orifice area 200 cm 2 frequency of manual observations during winter 1 per 24 hour • • R 2: Geonor gauge in DFIR (if we will get Geonor) – same DFIR configuration •
Instruments under Test • Instruments under test, provided by the host: – OTT Pluvio, 200 RH, Alter shield diameter 100 cm height 40 cm – OTT Pluvio - 400 cm 2, with Alter shield diameter 125 cm height 40 cm – Snow depth measurements: snow gauge
Ancillary Measurements
Data Flow and Archive
Site Commissioning • • Anticipated date of commissioning: Expected status on commissioning: References (where applicable): – – R 0: Valday bushy system R 1: Tretyakov gauge in DFIR R 2: Geonor gauge in DFIR (planed) R 3: --- • Instruments under test: • • a) Pluvio 2 200 RH b) Pluvio 2 400 • Instruments for Ancillary Measurements: • • a) Air Temperature: thermometer TM 9 -1 b) Relative Humidity: hygrometer М-19 -1 c) Dew Point Temperature: based on TM 4 -1 thermometers d) Atmospheric Pressure: barometer CP-A • e) Wind speed and direction 10 m: М-63 -1 • f) Wind Speed at the gauge orifice: anemometer М-92 (2 and 3 m) • g)Snow depth: snow gauge • • • h) Net Radiation: actinometer M-3 i) Visibility: М-53 А j) Snow Water Equivalent observations: Tretyakov gauges • • Expected status on Nov 15 th: – – Provided by the host: From Instrument Providers: ---
Additional Information Gaps for the winter 2012/2013: • Geonors installation may be delayed • Some minor problems with data collection and site functioning can occur • Reasons: – – – • • а) physical absence of the Geonors instrument b) there was a delay with site funding activities postponed for 2013: --- Data archive; existing Frequency of data transmission from the site to an archive (if any): Which is the reasonable frequency of data transfer to NCAR/SPICE archive to be expected during the experiment: once per month (may degrade) • • Valday will have mostly manual instruments. Will create some simple software for site personnel some GUI instead of direct file creating and will be able to avoid some mistakes. There are only three questions about data transfer: – – – • • 1) File extension (. txt, . rtf, . csv e. t. c) 2) Where and how to send (email, FTP uploading or something else) 3) Proposed format is covering 1 day data, but is it possible to create and send weekly one? Probably we're the only one site with mostly manual instruments, but it looks little bit funny to send about 10 files with couple values every day. Even if it is so - OK, not a problem, but if there will be a way to send this files once a week ore create weekly file it would be good.
- Is an alternative of log based recovery
- What divides european russia from asian russia
- Absolute vs relative configuration
- Relative configuration
- Electron configuration vs noble gas configuration
- Absolute vs relative configuration
- Hot site cold site warm site disaster recovery
- Tri quad pent hex
- October 2, 1869