WMO Integrated Global Observing System WIGOS The future
WMO Integrated Global Observing System (WIGOS) The future observing framework in support of weather, climate, water and relevant environment services Daouda KONATE, Director of Côte d’Ivoire Met Service Vice Président of RA I With the acknowledge of Dr S Barrell, Chair, ICG-WIGOS
Outline WMO • An overview of WIGOS • Vision, challenges • Key Areas • Integration & Interoperability • Stakeholders • Implementation • What is needed • Conclusions
WIGOS: A future observing framework for WMO GAW GCW Hydro OS World Weather Watch GOS WIGOS GCOS Partners GDPFS GTS Co-sponsors WIS
An overview of WIGOS • An over-arching framework for the coordination and evolution of WMO observing systems and the contributions of WMO to co-sponsored observing systems; • A WMO priority & a key contribution to GFCS • With WIS, a WMO contribution to GEOSS; • It is about doing more & better with what we have now to enable more efficient and effective service delivery; • It is about changing the way we plan, operate and deliver observations to meet user needs.
WIGOS Framework • At its simplest, the WIGOS framework is about: • Documenting and implementing standard and recommended practices and procedures in making and sharing observations, • Coordination and collaboration for efficiency and effectiveness, • Integration and interoperability in all senses, • Timely delivering observations that meet user needs in a way they can use them, • Empowering NMHSs
WIGOS –Challenges • Challenges – how to response to: • Disasters (multi-sector, multi-hazard, multi-disciplinary) • Climate change • Resource pressures and accountability • Lack of observations in the region • Lack of resource, budget and humans skills • Advances (scientific and technical): • Observing technology (improvements & new) • Numerical modelling and data assimilation • Capacity to access and use observations in decision making
Why WIGOS? • Shortcomings of the current situation: • Obs. networks/systems not sustainable and stable, • Design and planning not coordinated, • Obs. standards not respected (lack of compliance), • DBs not integrated (inconsistent, not compatible) including those of metadata, • Considerable deficiencies in QMS (maintenance, …), • Lack of qualified staff; • Through coordinated data sharing and networks/systems development, Members will be better equipped to address existing deficiencies and to meet future challenges
WIGOS Vision Global § Coordinated, comprehensive, reliable & trusted observations for WMO and cosponsors; § Addressing, in a cost-effective and sustained manner, the evolving observing requirements of Members in delivering their weather, climate, water and related environmental services; § Enhanced coordination & cooperation at regional, sub-regional and national levels for the benefit of society. Regional National
WIGOS Key areas Observing system operation & maintenance Collaboration with cosponsors and partners To oversee, guide and coordinate WIGOS To plan, implement and evolve WIGOS component systems Data discovery, delivery & archival To ensure supply of and access to WIGOS observations Management of WIGOS Implementation / operation Design, planning and optimised evolution Quality Management To facilitate and support the operation of WIGOS Communications and outreach Operational Information Resource Standardization, interoperability & compatibility Capacity Development
WIGOS Pre-operational Phase § Objective of the WIGOS Pre-operational Phase (WPP) o. To build on and strengthen the WIGOS framework; o. To deliver a fully operational WIGOS in 2020; o. To place increased emphasis on regional and national WIGOS activities. § Five priority areas: 1. National WIGOS implementation 2. Regional WIGOS Centers 3. WIGOS Information Resource 4. WIGOS Data Quality Monitoring System 5. WIGOS Regulatory and Guidance Material
WIGOS Pre-operational Phase WIGOS framework Cryospher e Regulatory & Guidance Material GFCS Data quality monitoring system DRR Information Resource (WIR) National WIGOS implementatio n Regional WIGOS Centres WIGOS Pre-operational Phase WMO priorities Aviation
WIGOS Pre-operational Phase – the goal § Goal is for all Members to be 'WIGOS Ready' by Cg 18 (2019) § 'WIGOS Ready' means, as a minimum, for each Member: o. WIGOS Metadata – implemented o. WIGOS Station Identifiers – implemented o. OSCAR – implemented o. Data Quality Monitoring – national process in place o. Embracing all NMHS-operated observing systems oand willing partners § Progressively integrating partner-systems § Members supported by Regional WIGOS Centres/facilities
Outreach to partners Cg 18 WIGOS Ready WDQMS Station IDs WIGOS Metadata OSCAR/Surface July 2016 WHOS GCW GAW WIGOS Uptake Support for WMO & Member priorities WIGOS Open
WIGOS Pre-operational Phase – the work plan § To even start to achieve the 'WIGOS Ready' target, early priorities are: o. High quality communications material, tailored for different audiences including PRs and Ministers, with Observations Managers of special importance; o. Completion and implementation of OSCAR/Surface; o. Implementing new Station IDs and WIGOS metadata; o. Drafting technical guidance to complement the WIGOS Manual; o. Progressive development of e-learning materials; and o. Development of partnering and data lifecycle management principles.
Regional WIGOS centres § Purpose o Support Members to implement & comply with WIGOS o Through regional coordination, guidance, oversight § Form: o Appropriate to region, using existing centres if possible o All PRAs to present early thoughts on approaches to ICG-WIGOS-6 § Governance o Under RA Management Group, liaise with WIGOS PO § Mandatory functions: o Metadata management; support for OSCAR/Surface o Performance monitoring and follow-up; support for WDQMS § Optional functions, include: o Assistance with projects, national/regional network management, o Capacity development
Guide to WIGOS § Developed by Secretariat, with help of Technical Commission experts § Overseen and reviewed by the WIGOS Editorial Board, established under the auspices of ICG-WIGOS o Tech Regulations 'what'; Guide 'How' § Initial version of the Guide to WIGOS available as of today at http: //www. wmo. int/pages/prog/www/wigos/WGM. html, including guidance on o WIGOS Metadata Standard o OSCAR/Surface o WIGOS Station Identifiers § Additional material will be made available throughout the WPP, eg on: o National implementation, partnership development, data lifecycle management, Regional WIGOS Centers § To be improved through use and feedback
WIGOS Data Quality Monitoring System § Pilot project underway with major NWP centres § Specification of requirements 1. Performance monitoring of all WIGOS components o. Data availability and data quality o. Global, regional, national o. Searchable by region, country, station type, period etc o. Real-time (for weather and related observations) o. Delayed-mode (for other observations) 2. Fault management system o. Tracking, reporting and mitigation of performance issues How well is WIGOS functioning?
WIGOS Information Resource: OSCAR Surface § Reference implementation of WIGOS Metadata Standard o<<Vol A>>, JCOMMOPS, WMO Radars, GAWSIS Integrated on 18 April 2016 o. GUI fully operational o. History-aware § Machine interface under development § Clearing house for WIGOS station identifiers § Succession of <<Vol A>> o. Available until Dec 2017 Under ongoing development by Meteo. Swisse & WIGOS PO
WIGOS Timeline WIGOS Pre-operational Phase CONGRESS 16 ICG-WIGOS Concept CONGRESS 17 WIGOS STRATEGIC PRIORITY WIGOS Framework CONGRESS 18 WIGOS READY WIGOS Operational Technical Commissions, under leadership of CBS and CIMO, in collaboration with Regional Associations
WIGOS: Integral part of NMHS and key enabler of their value proposition WIGOS + National societal needs
Who is involved in WIGOS? Global WMO and Secretariat Other Regions Region Member S 1: NMHS Observing System S 2: NMHS Observing System P 1: Partner Observing System P 2: Partner Observing System etc Other Members Global Co-sponsors and Partners test footer 22
Who is involved in WIGOS? Global Users WMO and Secretariat Other Regions Region Users Member Users S 1: NMHS Observing System S 2: NMHS Observing System P 1: Partner Observing System P 2: Partner Observing System Member etc Other Members Global Co-sponsors and Partners test footer 23
WIGOS Implementation • To achieve the WIGOS Vision, the WIGOS framework shall be implemented to enable the integration, interoperability, optimized evolution and best-practice operation for • WMO observing systems, and • WMO’s contribution to co-sponsored systems. • WIGOS will use and exploit the WMO Information System (WIS) to allow continuous and reliable access to an expanded set of environmental data and products, and associated metadata.
Implementation Steps Regional Level • Identify major issues of the Region (& its Sub-regions): observational challenges, critical gaps and solutions against the identified services priorities of the Region/Sub-regions; • Indicate the best/appropriate working approach for the Region / Subregion taking advantage of ongoing/planned initiatives, activities, groupings, projects (synergy of them) to address requirements, needs, priorities & associated challenges, respecting specifics of each Subregion; • Propose potential solutions against the identified services priorities of the Region/Sub-regions;
Implementation at a Regional Level R-WIP • Develop R-WIP: • Identify implementation activities for WIGOS Key Activity Areas; • Align R-WIP with major regional / subregional & national activities and harmonized aid-funded on-going national/bilateral/subregional projects; • Align R-WIP-I with all WMO Priorities (GFCS-IP, CB/CD, DRR), and GCOS-IP, EGOS-IP; • Propose bilateral or multilateral subregional projects, or inter-regional projects (e. g. between RA I & VI / RA I & II); • Align with existing funding and look for funding opportunities; • Identify appropriate mechanism for implementation of agreed tasks and projects. • Identify Resources and potential Donors
What does WIGOS mean at a National level? • N-WIGOS must be aligned with national needs/priorities (strategic and operational): • NMS Strategy & Plan drive N-WIP • N-WIP has to take such a Strategy & Plan into account and built on it • N-WIP must be consistent with: • WIP and R-WIP (Key Activity Areas), • GCOS-IP, EGOS-IP, GFCS-IP;
What does WIGOS mean at a National level Benefits of WIGOS Enhanced Members’ capability, in a costeffective manner, to meet expanding national mandates and achieve higher national and international visibility; WIGOS provides a process and framework for improved collaboration and coordination within and beyond WMO; WIGOS is both: challenges and opportunities for building up synergies and new capabilities among us, a true win-win strategy for our future 28
What does WIGOS mean at a National level? Benefits of WIGOS • Demonstrating national leadership in observations: • Best practices, • Plan & design; • Sustainability, maintenance & operation; • Integration and interoperability; • Compliance with WMO TR (WMO-No. 49) - standard and recommended practices and procedures; • Culture change and change management; • Supported by collaboration at Regional/Sub-regional level • WIGOS benefits will only be delivered through commitment at a national level
National leadership through WIGOS Benefits of WIGOS • WIGOS and WIS provide means & opportunities: • To enhance national observing networks for benefit of all users • To enhance sharing and accessibility of observations • To reinforce central role of NMHS through partnerships & a network of networks • To strengthen national mandate and authority • Strong national coordination & cooperation will assist in building strong regional coordination & cooperation
Statuts of implementation in ECOWAS West African Worshop on WIGOS Implmetation : Novembre , 12 -15 , 2013 The R-WIP implementation plan is adopted Tableau 2: Activités de mise en œuvre du WIGOS en Afrique de l’Ouest 31
What is needed • Cooperation & partnership (C&P) • regional organizations / sub-regional groupings overseeing the observing systems/networks, • specifically cooperation among meteorological, hydrological and marine/oceanographic institutions/services where they are separated at the national level. • C&P : crucial for building of a sustainable Regional/Subregional IOS to provide observations critical for meeting service delivery user requirements.
What is needed • Communications and Outreach to gain: • Acceptance/understanding of the WIGOS concept by stakeholders; • Support of Members’ PRs and national governments (the stronger, the better): • Commitment & engagement & support to WIGOS & its implementation at a national level (ownership): fundamentally important; • Donation from funding agencies (e. g. World Bank, EU, subregional economic groupings);
In conclusion… • WIGOS: • will help Members better understand the needs, priorities and challenges for national/regional observing systems/networks; • will lay down the framework – to allow Members to start addressing the current problems in a: • systematic, • coordinated, • sustainable, • efficient & effective way.
Thank you for your attention www. wmo. int/wigos
N° Activité Réalisations attendues Délais Responsabilité Risques possibles 1. Gestion de la mise en œuvre du WIGOS dans la Sous-Région Ouest Africaine 1. 1 Établir la structure sous régionale Structure sous régionale ouest Réalisé SR ouest africaine de gouvernance du WIGOS N WIGOS, y compris les organismes dans la Région I, y compris le groupe sous régionaux responsables de travail créé. Gouvernance: (ASECNA, CEDEAO, etc. ) et les gouvernance à un niveau élevé groupes techniques. comprenant des Ministres et Représentant Permanent(PR) Groupe de travail: 2 par pays pour une combinaison de WIGOS and WIS 1. 2 SR N 2013 Représentants permanents Mars 2014 Coordonnateurs sous régionaux et nationaux Faibles Juin 2014 Coordonnateur national avec l’appui du Représentant Permanent Faibles 1. 3 SR 1. 4 Désigner au niveau sous-régional et national des coordonnateurs du WIGOS chargés des rapports avec la CSB, la CIMO, d’autres commissions techniques compétentes et le Bureau de planification du WIGOS en vue de la mise en œuvre du Système et du Plan d’action pour l’évolution des systèmes mondiaux d’observation dans la Région Concevoir le Plan sous régional ouest africain de mise en œuvre du WIGOS de façon à ce qu’il tienne compte des priorités de la sous-région Coordonnateurs nationaux et sous régionaux pour WIGOS et WIS désignés. Plan sous régional élaboré, y compris: a) Les tableaux d’exécution des décisions; b) Les mesures indiquées dans le Plan au niveau sous régional; c) Les mesures indiquées dans le Plan d’action pour l’évolution des systèmes mondiaux d’observation dans la sous-région ouest africaine Concevoir le Plan national de mise en Plan national disponible œuvre du WIGOS de façon à ce qu’il tienne compte des priorités nationales Membres ouest africains du Groupe de gestion du Conseil régional I 36
1. 5 SR N Recenser les ressources nécessaires au Ressources voulues, issues du Secrétariat, des sous- 2013 -2015 financement de la mise en œuvre du WIGOS dans régions, des partenaires, des parties prenantes et des la sous-région ouest africaine Membres pour financer les mesures à adopter, recensées Groupe de gestion sous régional; représentants permanents 1. 6 SR N Mobiliser les ressources nécessaires au Ressources nécessaires, issues du Secrétariat, des 2013 -2015 financement de la mise en œuvre du WIGOS dans sous-régions, des partenaires, des parties prenantes la sous-région ouest africaine et des Membres pour financer les mesures à adopter, mobilisées Groupe de gestion ouest Élevés africain; représentants permanents 1. 7 SR N Controle et evaluation (C&E) des activités de mise Rapport semi-annuel de C&E, problèmes identifiés et En cours en œuvre du WIGOS dans la sous-région résolus Groupe de gestion sous régional; Secrétariat de l’OMM; Bureau régional et sous-régional 1. 5 N Développer le plan National de mise en œuvre du N-WIPs développé WIGOS et du SIO (N-WIPs) 2. Collaboration avec l’OMM et les systèmes d’observation coparrainés 2. 1 Recenser et engager les principaux partenaires Signature de mémorandums d’accord et d’accords R (hydrologie, océanographie, agriculture, avec des partenaires régionaux, sous-régionaux et SR environnement, établissements de recherche, nationaux N secteur privé, agence de gestion des risques de catastrophes, etc. ) tels que AGRHYMET, ACMAD, ASECNA, ABN, OMVS, Régional Maritime University-Accra, etc. qui seront chargés de mettre en œuvre le WIGOS au niveau sous régional ouest africain et national Élevés 2013 -2016 équipe nationale pour la mise en œuvre du WIGOS et du SIO établie par les pays membres ( y compris les principales parties prenantes) pour gérer tous les systèmes d'observation et d'information. Cette équipe devra élaborer un plan national de mise en œuvre du WIGOS et du SIO 2013 -2015 Groupe de gestion ouest Élevés africain; représentants permanents 2. 2 R SR N Établir des mécanismes de travail assortis d’objectifs clairs (politique en matière de données, mémorandums d’accord, accords, etc. ) en vue d’une collaboration pour la mise en œuvre du WIGOS dans la sous-région ouest africaine Mécanismes de collaboration; augmentation du nombre et du montant des observations échangées avec des partenaires sur le plan régional, sousrégional et national sur la base de mémorandums d’accord et d’accords, établis 2013 -2015 Groupe de gestion ouest Élevés africain; représentants permanents 2. 3 SRN Liaison avec l’ASECNA particulièrement avec ses services relevant du WIGOS et du SIO La part de l’ASECNA dans la mise en œuvre du plan sous-régional de WIGOS et du SIO connue. 2014 L’OMM doit rencontrer l’ASECNA en 2013 pour définir les applications du SIO et les responsabilités. Groupe de gestion ouest africain pour superviser la liaison et la contribution au plan. 37
3. Conception, planification et évolution optimisée du WIGOS et de ses composantes régionales, sous-régionales et nationales d’observation 3. 1 Concevoir et planifier des systèmes Plan optimal sous régional intégré de conception de 2014 -2017 Coordonnateurs R d’observation dans la sous-région ouest systèmes d’observation élaboré WIGOS/WIS sous africaine en tenant compte: régionaux et nationaux a) De l’orientation technique fournie par le en collaboration avec Plan d’action pour l’évolution des systèmes RA I TT- WIGOS-WIS mondiaux d’observation et d’autres plans appropriés de mise en œuvre de systèmes d’observation; b) Des recommandations du CR I à sa quinzième session (2010); c) Des besoins en matière d’observations exprimés dans le Plan de mise en œuvre du CMSC; d) Des besoins actualisés des usagers, y compris les agences internationales de bassins fluviaux, en matière de données e) Des campagnes de mesure et d’études réalisées dans la sous-région Élevés 3. 2 R Établir le principe d’un nouveau réseau de base sous régional en étroite collaboration avec la CSB Un nouveau réseau de base sous régional défini 2013 -2015 Coordonnateurs sous régionaux et nationaux 3. 3 En se fondant sur le principe d’un nouveau Plan sous régional d’optimisation des systèmes réseau de base régional, concevoir et planifier d’observation proposé des systèmes d’observation dans la sousrégion en tenant compte de ses priorités et de ses besoins 2013 -2015 Coordonnateurs sous Moyens régionaux et nationaux, avec l’appui du Bureau du Projet WIGOS 3. 4 N Contribuer à l’effort collectif au niveau sous-régional pour faire évoluer et réaliser des systèmes d’observation en suivant l’exemple d’EGOS-IP et d’autres plans de réalisation de systèmes d’observation 1) rapport détaillé de IPET-OSDE sur les actions de EGOS-IP 2) prendre l’initiative EGOS-IP au niveau national Chaque année 2014 et plus Pays membres 3. 5 N Consulter la base de donnés de l’OMM concernant les besoins et des usagers et l’adapter au plan au niveau Sous. Régional et national. Base de données sur les besoins mise à jour au niveau Sous-Régional et National. 2014 et plus Membres, Secrétariat de l’OMM, CBS 3. 6 SR Examiner les pratiques et procédures en Le Manuel du SMT vol II, mise à jour et la matière de télécommunications au niveau topologie du SIO appliquée. régional et mettre à jour le SMT afin d’appliquer la topologie du SIO. 2014 et plus Les points Focaux SIO avec la représentation Sousrégional du TTWIGOS SR Élevés 38
3. Conception, planification et évolution optimisée du WIGOS et de ses composantes régionales, sous-régionales et nationales d’observation 3. 1 Concevoir et planifier des systèmes Plan optimal sous régional intégré de conception de 2014 -2017 Coordonnateurs R d’observation dans la sous-région ouest systèmes d’observation élaboré WIGOS/WIS sous africaine en tenant compte: régionaux et nationaux a) De l’orientation technique fournie par le en collaboration avec Plan d’action pour l’évolution des systèmes RA I TT- WIGOS-WIS mondiaux d’observation et d’autres plans appropriés de mise en œuvre de systèmes d’observation; b) Des recommandations du CR I à sa quinzième session (2010); c) Des besoins en matière d’observations exprimés dans le Plan de mise en œuvre du CMSC; d) Des besoins actualisés des usagers, y compris les agences internationales de bassins fluviaux, en matière de données e) Des campagnes de mesure et d’études réalisées dans la sous-région Élevés 3. 2 R Établir le principe d’un nouveau réseau de base Un nouveau réseau de base sous régional défini sous régional en étroite collaboration avec la CSB 2013 -2015 Coordonnateurs sous régionaux et nationaux 3. 3 En se fondant sur le principe d’un nouveau Plan sous régional d’optimisation des systèmes réseau de base régional, concevoir et planifier d’observation proposé des systèmes d’observation dans la sousrégion en tenant compte de ses priorités et de ses besoins 2013 -2015 Coordonnateurs sous Moyens régionaux et nationaux, avec l’appui du Bureau du Projet WIGOS Contribuer à l’effort collectif au niveau sous-régional pour faire évoluer et réaliser des systèmes d’observation en suivant l’exemple d’EGOS-IP et d’autres plans de réalisation de systèmes d’observation Consulter la base de donnés de l’OMM concernant les besoins et des usagers et l’adapter au plan au niveau Sous. Régional et national. Chaque année 2014 et plus Pays membres SR 3. 4 N 3. 5 N 3. 6 SR 1) rapport détaillé de IPET-OSDE sur les actions de EGOS-IP 2) prendre l’initiative EGOS-IP au niveau national Base de données sur les besoins mise à jour 2014 et plus au niveau Sous-Régional et National. Examiner les pratiques et procédures en Le Manuel du SMT vol II, mise à jour et la matière de télécommunications au topologie du SIO appliquée. niveau régional et mettre à jour le SMT afin d’appliquer la topologie du SIO. 2014 et plus Élevés Membres, Secrétariat de l’OMM, CBS Les points Focaux SIO avec la représentation Sousrégional du TTWIGOS 39
40
- Slides: 40