Wireless LAN Expansion Scenarios Presentation to the UTFAB
Wireless LAN Expansion Scenarios Presentation to the UTFAB Tuesday, Dec. 9, 2008 Greg Redder Interim Associate Director for Networking Greg. Redder@colostate. edu, 491 -7222
Outline n Wireless LANs on campus n n n History, current status, usage Future of wireless Three possible scenarios Considerations Discussion Wireless Expansion Proposal 2
Wireless LANs on Campus n n Began deploying wireless in 2000 Focused on areas of highest student concentration n n Lory Student Center, Morgan Library Clark Building, Eddy Building Engineering Building Education Wireless Expansion Proposal 3
Current Status n n Over 490 access points installed Residence halls (common areas) Student Center, Library, Acad. buildings Due to successful UTFAB project funded in the past, 100% of academic buildings with GA classrooms are covered n Colleges joint funded that effort Wireless Expansion Proposal 4
Terminology n n n GA – General Assignment – classrooms available to classes in any college 802. 11 – wireless protocols 802. 11 a – 5 GHz – 54 Mbits/sec (27 each way) 802. 11 b – 2. 4 GHz – 11 Mbits/sec (5. 5 each way) 802. 11 g – 2. 4 GHz – 54 Mbits/sec (27 each way) 802. 11 n – 2. 4 & 5 GHz – 200 -300 Mbits/sec (100 -150 each way) Wireless Expansion Proposal 5
What this means to us… n What we have: Wireless Expansion Proposal 6
Current Issues/Status n n n Clark, Morgan and Rec. Center have Access Points that are saturated with users. Monday Dec. 1: 1246 max, 972 average 90 Mbits/sec max, 60 Mbits/sec average ½ of the access points support A/B/G 4% support N UTFAB - 03/05/2007 Wireless Expansion Proposal 7
Wireless Expansion Proposal 8
One of three APs on 2 nd floor of Clark A An AP on 2 nd floor of Morgan Wireless Expansion Proposal 9
Future… n n n New/easier wireless connection coming in Spring ’ 08 that doesn’t require VPN! Video VOIP Most new mobile devices have wireless builtin. Increased usage/density – even Rec. Center is saturated. 24/7 utilization Wireless Expansion Proposal 10
Scenarios n 1. 2. 3. Three general scenarios (not mutually exclusive): Fix existing areas of problems Upgrade significant GA buildings to high-speed wireless Expand outdoor wireless to high-speed Wireless Expansion Proposal 11
Wireless Expansion Proposal 12
Fix Existing Problems at Plant Sci, Clark, Glover, Eddy n Fix Clark C with newer/advanced APs and deploy 6 older APs at Eddy Buy 6 for Plant Sci. Buy 1 for Glover n COST: $85 K n n
Benefits… n n Address immediate problems noted Saturate Clark C with the latest/greatest wireless. Wireless Expansion Proposal 14
Upgrade significant GA buildings to high-speed wireless. n n n Clark A/C - $135 K Morgan - $135 K Eddy - $80 K Education - $75 K Lory Student Center - $250 K COST: $675 K Wireless Expansion Proposal 15
Benefits… n n Significant increase in saturation – more devices/density supported: Clark A, for example. Better roaming support inside buildings High speed access – 200 -300 Mbits/sec! Can deploy the existing units to cover/upgrade other buildings (some older units would have to be retired) Wireless Expansion Proposal 16
3. Expand Outdoor Wireless n Oval Area West of Lory Student Center Area South of Rec. Center n Cost: $70 K n n Wireless Expansion Proposal 17
Benefits… n n n Support of newer wireless technologies outdoors Further the saturation of main campus wireless Expand outdoor wireless and do it with high-speed technology Wireless Expansion Proposal 18
Mix n’ Match n n n Do main GA buildings and outside Do just one of the GA buildings Do a different subset/superset of the GA buildings and outside Just do outside ? ? ? Wireless Expansion Proposal 19
Matching Funds n Central funding to provide up to $80 K Wireless Expansion Proposal 20
UTFAB Funding Criteria 1. Benefit as many students as possible Wireless devices becoming more commonplace; this project increases wireless availability 2. Ability to effectively utilize the fee Your decision. 3. Not funded by CFT Correct 4. Adherence to budget and accountability Your decision. 5. Potential for direct student use Absolutely. 6. Effort and thought reflected in the plan Your decision. 7. Justification and clarity of project plan Your decision. Wireless Expansion Proposal 21
UTFAB Funding Criteria 1. Benefit as many students as possible Wireless devices becoming more commonplace; this project increases wireless availability 2. Ability to effectively utilize the fee Your decision. 3. Not funded by CFT Correct 4. Adherence to budget and accountability Your decision. 5. Potential for direct student use Absolutely. 6. Effort and thought reflected in the plan Your decision. 7. Justification and clarity of project plan Your decision. Wireless Expansion Proposal 22
Thank You! Discussion and questions are most welcome. Wireless Expansion Proposal 23