Wireless Expansion Update Greg Redder greg reddercolostate edu

  • Slides: 20
Download presentation
Wireless Expansion Update Greg Redder greg. redder@colostate. edu, 1 -7222 Academic Computing & Networking

Wireless Expansion Update Greg Redder greg. redder@colostate. edu, 1 -7222 Academic Computing & Networking Services 4/6/10

http: //xkcd. com/466/

http: //xkcd. com/466/

Agenda • Review and status update • Installation update • Where to go next

Agenda • Review and status update • Installation update • Where to go next

Review and status update From April 14, 2009 UTFAB meeting: Wireless Upgrades: allocated $200,

Review and status update From April 14, 2009 UTFAB meeting: Wireless Upgrades: allocated $200, 000. 00 to focus on – Eddy – Education – Engineering – Chemistry (Per UTFAB minutes: “Possibly use a hybrid approach of using different density capable wireless routers. ”) • Per Oct. 27, 2009 meeting: – Continue working through buildings with most GA seats – Complete Rockwell if Rockwell comes onto campus standard

Installation Phases Just a reminder… Two phases to each project: 1. Replace existing wireless

Installation Phases Just a reminder… Two phases to each project: 1. Replace existing wireless with high-speed wireless. 2. Enhance density coverage in GA areas after “watching” the system for several months and fielding questions from clients.

Installation Update • Completed as requested: – Eddy, Education, Engineering, Chemistry, Rockwell. – Phase

Installation Update • Completed as requested: – Eddy, Education, Engineering, Chemistry, Rockwell. – Phase 2 pending by end of semester. • Next up (to be completed by end of semester): – Plant Sciences, Wagar, Natural Resources, A/Z, Shepardson

New/Remodel Buildings Not UTFAB funded but using the same wireless: • • • Behavioral

New/Remodel Buildings Not UTFAB funded but using the same wireless: • • • Behavioral Sciences Building Rec. Center Parking Garage Industrial Sciences A number of smaller/new sites

Statistics • Two sets of statistics: one for each type of wireless network: –

Statistics • Two sets of statistics: one for each type of wireless network: – Xirrus (Morgan, Clark A/C, TILT, CS) – Aruba/Cisco (Everywhere else) • Have to look at stats from both to get “big picture”

Statistics Summary (“big picture”) • Roughly 2800 -3200 devices connected at peak times.

Statistics Summary (“big picture”) • Roughly 2800 -3200 devices connected at peak times.

2800 max connection on April 2 Aruba/Cisco 1400 clients on Xirrus (Clark/Morgan/TILT/CS) Xirrus 1400

2800 max connection on April 2 Aruba/Cisco 1400 clients on Xirrus (Clark/Morgan/TILT/CS) Xirrus 1400 clients on campus Aruba/Cisco (The graph includes about 450 Housing users. )

View over the past year…

View over the past year…

Eddy (Last 6 mos. )

Eddy (Last 6 mos. )

Education (Last 6 mos. )

Education (Last 6 mos. )

Engineering (Last 6 mos. )

Engineering (Last 6 mos. )

Current Issues • Engineering A wing classroom has low signal – to be addressed

Current Issues • Engineering A wing classroom has low signal – to be addressed in phase 2 of Engineering install to be completed by end of Semester. • Note: Believe issues resolved at Computer Science and Library.

Budget Update Funding as of 4/6/10: $46 K remaining (+ $10 K from Athletics)

Budget Update Funding as of 4/6/10: $46 K remaining (+ $10 K from Athletics) Planned expenditures: Natural Resources: $10, 500 A/Z: $18, 200 Shepardson: $7, 000 Xirrus maintenance/support: $7, 233 (proposed split $14, 465 with central funding) – Aruba maintenance/support: $6, 600 (pay for with Athletics funding on 7/1/10) – – This leaves: $3, 273 remaining.

Proposed plan for remaining budget: • Finish up Plant Sciences and Wagar with current

Proposed plan for remaining budget: • Finish up Plant Sciences and Wagar with current inventory. • Use remaining budget to continue with: – Natural Resources: $10, 500 – A/Z: $18, 200 – Shepardson: $7, 000 And purchase Xirrus maintenance: – Xirrus maintenance/support: $7, 233 (proposed split $14, 465 with central funding)

Funding request • Maintenance going forward: $22 K/yearly (Starting July 1, 2011) • Additional

Funding request • Maintenance going forward: $22 K/yearly (Starting July 1, 2011) • Additional Projects to consider: – Finish all remaining buildings: $187 K – Support for remaining buildings: ~20 K – Make existing wireless controllers redundant: $22 K (UTFAB to prioritize future projects. )

Bldg GA Rooms Seats Access Points Type was very old (B) Access Points Per

Bldg GA Rooms Seats Access Points Type was very old (B) Access Points Per Seat Approx Cost Clark 29 2830 Saturated Eddy 25 1146 8 was old (ABG) 143 Engineering 18 1072 29 was very old (B) 37 Chemistry 5 538 17 was very old (BG) 32 Plant Sciences 3 406 8 very old (BG) 51 Wagar 5 357 5 very old (BG) 71 Rockwell 6 353 x was very old (B) Natural Resources 6 324 6 old (ABG) 54 Anatomy Zoology 3 303 12 8 old, 1 new, 4 very old (8 ABG, 1 ABGN, 4 BG) 25 Education 8 289 5 B 58 Shepardson 4 277 5 old (ABG) 55 Aylesworth 3 263 6 very old (BG) 44 $12, 450 Microbiology 4 261 11 old (ABG) 24 $19, 000 Gifford 5 256 9 old (ABG) 28 $19, 950 Yates 1 252 11 very old (BG) 23 $11, 350 Glover 2 241 8 old (ABG) 30 $11, 500 Johnson Theatre 1 220 3 2 new (theatre) 1 old (2 AGN, 1 BG) 73 $4, 950 Military Science 4 217 2 very old (BG) 109 $11, 800 Pathology 2 200 7 very old (BG) 29 $10, 700 Physiology 2 194 7 old (ABG) 28 $10, 700 Visual Arts 2 152 14 13 old, 1 very old (13 ABG, 1 BG) 11 $16, 300 Animal Sciences 4 134 7 5 very old, 2 old (5 BG, 2 ABG) 19 $15, 800 MRB 2 72 9 6 old, 3 very old (6 ABG, 3 BG) 8 $12, 300 Guggenheim 1 70 2 old (ABG) 35 $4, 150 NESB 1 35 10 very old (BG) 4 $10, 550 Forestry 1 30 15 old (ABG) 2 $14, 550

Questions and thank you!

Questions and thank you!