Wireless Expansion Update Greg Redder greg. redder@colostate. edu, 1 -7222 Academic Computing & Networking

Wireless Expansion Update Greg Redder greg. redder@colostate. edu, 1 -7222 Academic Computing & Networking Services 3/24/14

Agenda • Proposed plan for FY 15 • Budget request for FY 15 •

Agenda • Proposed plan for FY 15 • Budget request for FY 15 • Additional funding request

Proposed plan for FY 15 • Change SSID names and simplify – “csu-eid”: student/staff/faculty

Proposed plan for FY 15 • Change SSID names and simplify – “csu-eid”: student/staff/faculty – “csu-guest”: guests – no username/password required, limited bandwidth and confined mostly to just web browsing. – “eduroam”: accessible internationally! • Upgrade GA classrooms to 802. 11 ac (see following slide for plan) • Cover remaining parts of GA buildings at 5 GHz • Continue to fund 1 FTE from UTFAB • $385 K of central funding for Wi. Fi expansion, plus maintenance and an FTE • Educational campaign and signage

Also for FY 15 • Develop a database of installations • Assess deployments versus

Also for FY 15 • Develop a database of installations • Assess deployments versus funding levels to determine a refresh rate • Intent: make good progress on this in FY 15, may spill over into FY 16

Bldg Name # of Classrooms Total# of Seats Notes CLARK 28 2576 Done EDDY

Bldg Name # of Classrooms Total# of Seats Notes CLARK 28 2576 Done EDDY 25 1146 Pending bldg upgrade ENGIN 18 1007 Postpone for Network Operations Policy BHSCI 5 733 CHEM 5 569 RCKWLW 8 439 PLSCI 2 371 WAGAR 5 357 RCKWL 6 353 JNTHR 1 324 A/Z 3 310 EDUC 8 289 NATRS 6 287 SHEP 4 277 GIFRD 5 266 AYLES 3 263 MICRO 4 256 YATES 1 252 BIOENG 3 234 GLOVR 2 231 MILSC 4 214 PHYSL 2 194 PATH 2 189 ART 2 157 TILT 1 126 ANSCI 4 118 GUGHM 1 70 MRBSC 2 70 FRSTY 1 25

UTFAB FY 15 funding request • $600 K – 1 FTE (continuation) = $75

UTFAB FY 15 funding request • $600 K – 1 FTE (continuation) = $75 K – Upgrades to central equipment = $160 K • Devices that convert invalid campus addresses used on wireless to valid Internet addresses: ($70 K) • Devices to control Aruba wireless access points: ($80 K) • Monitoring system (Airwave) license increase: ($10 K) – Split maintenance with central funding: $50 K – 130 New access points and cabling: $130 K – Install 130 new APs: $60 K – New network infrastructure (switches): $125 K

Additional funding request • Trial Gardens: $32 K total – 50/50 split between Ag.

Additional funding request • Trial Gardens: $32 K total – 50/50 split between Ag. Sci and UTFAB: $16 K each – Ed Peyronnin, College of Ag. Sci

Conclusion • Questions? • Thank you!