What is Lean Construction Owner ArchitectEngineer General Vendors

  • Slides: 17
Download presentation
What is Lean Construction? Owner Architect/Engineer General Vendors Subcontractors Lean construction is a set

What is Lean Construction? Owner Architect/Engineer General Vendors Subcontractors Lean construction is a set principles and tools to facilitate planning and control, maximize value and minimize waste throughout the construction process.

The History of LEAN Henry Ford. Father of Mass Production Empire State Building •

The History of LEAN Henry Ford. Father of Mass Production Empire State Building • 14. 5 Months • Predictable Flow Used • Integrated Team • Location Based Schedule • Analytics • “Flow “ Production • C. A. N. D. O (Clearing Up, • Standardization • Best Practice • Deployment Arranging, Neatness, Discipline, Ongoing improvement) LEAN Journey 1900 1905 1910 1915 1920 1925 1930 1935 1940 1945

The History of LEAN U. S. Auto Industry Awoken To “LEAN Manufacturing” Taiichi Ohno

The History of LEAN U. S. Auto Industry Awoken To “LEAN Manufacturing” Taiichi Ohno — Father of the Toyota Production System (TPS) • Just-In-Time (JIT) • Continuous Improvement • Respect for People • 7 Types of Waste • 5 S Program 1950 1955 1960 1965 1970 Eliyahu Goldratt - Kaoru Ishikawa - Joseph Juran - Edwards Deming Total Quality Management (TQM) Theory of Constraints (TOC) 1975 1980 1985 1990 1995 1990

The History of LEAN Integrated Project Delivery (IPD) Lean Construction Institute Last Planner System

The History of LEAN Integrated Project Delivery (IPD) Lean Construction Institute Last Planner System TM Sutter’s 5 Big Ideas Construction Teams Start to use with great success. Glenn Greg Ballard & Howell AGC Lean Construction Forum Created 1997 2000 2002 2003 2004 2005 2006 2008 2010 2011

Why LEAN? – The “way we have always done it” is not working

Why LEAN? – The “way we have always done it” is not working

LEAN Principles and Tools • Waste- 8 Types • 5 S • Visual Work

LEAN Principles and Tools • Waste- 8 Types • 5 S • Visual Work Place • Reliable Promises • Electronic Documents

What is Waste? 8. Under-utilized Talent

What is Waste? 8. Under-utilized Talent

Waste in Construction Current Manufacturing Current Construction

Waste in Construction Current Manufacturing Current Construction

5 S • Everything On Wheels • Nothing Hits the Ground • Subcontractor Laydown

5 S • Everything On Wheels • Nothing Hits the Ground • Subcontractor Laydown Areas • Continuous Cleaning • Sustaining the Plan

Visual Work Place Owner Signage - Include Project Goals or Condition of Satisfaction (Co.

Visual Work Place Owner Signage - Include Project Goals or Condition of Satisfaction (Co. S) Boards and Lists- Get the files out of the computer and into the open • Clear Signage Restroom, Lunch, & Staging Area • Owner Signage Include Project Goals or Condition of Satisfaction (Co. S) • Boards and Lists • Color Coding Site

Visual Work Place Subcontractor laydown areas and S 5 organization Set expectation early and

Visual Work Place Subcontractor laydown areas and S 5 organization Set expectation early and often. Get the information in places the field staff have access to it. Color Coding of Floor- Visual work is used in pull planning to talk about batch sizing. Establish flow and direction. Logistic plan should be posted on project.

Reliable Promises- Pull Planning provides project alignment and schedule buy in with subcontractors. Pull

Reliable Promises- Pull Planning provides project alignment and schedule buy in with subcontractors. Pull Planning is just a different way of running a foreman’s meeting Daily Forman Huddles. Tracking Percent Promise Complete (PPC) Breakout Meeting- Addressing Complex Issues in Smaller Groups

Reliable Promises- Constraint Log – a list of constraints with identification of an individual

Reliable Promises- Constraint Log – a list of constraints with identification of an individual promising to resolve the item by an agreed date. Typically developed during a review of the Six Week Look Ahead Plan when it is discovered that activities are not constraint free. Theory of Constraints (TOC) is a management paradigm that views any manageable system as being limited in achieving more of its goals by a very small number of constraints. There is always at least one constraint, and TOC uses a focusing process to identify the constraint and restructure the rest of the organization around it.

Reliable Promises- Plan, Do, Check Act & A 3

Reliable Promises- Plan, Do, Check Act & A 3

Electronic Documents Everything Lives in the Cloud Electronic Documents provide the most current information

Electronic Documents Everything Lives in the Cloud Electronic Documents provide the most current information to entire project team and reduce waste and rework. • E-Doc’s • Tablets - Including Subcontractor Foremen

Electronic Documents- BIM § Model as much as possible- The more the better §

Electronic Documents- BIM § Model as much as possible- The more the better § Maximize learning curve prior to work in field § Minimize variation created by errors

“It is not necessary to change. Survival is not mandatory” W. Edwards Deming

“It is not necessary to change. Survival is not mandatory” W. Edwards Deming