WG ON HTHP RHEOLOGY WINTER 2018 SAN ANTONIO

  • Slides: 14
Download presentation
WG ON HTHP RHEOLOGY WINTER 2018, SAN ANTONIO, TX Rick Lukay – Chairman

WG ON HTHP RHEOLOGY WINTER 2018, SAN ANTONIO, TX Rick Lukay – Chairman

AGENDA Review Charge Review of Current members Read & approve minutes from Winter meeting

AGENDA Review Charge Review of Current members Read & approve minutes from Winter meeting Old Business Action Items from last meeting Current Status New Business

CHARGE Develop a technical report on recommended testing protocols for measuring HTHP rheology of

CHARGE Develop a technical report on recommended testing protocols for measuring HTHP rheology of cement at greater than atmospheric pressure.

CURRENT MEMBER LIST Andrew Holley Bruce Mackay Cory Heinricks Andrew. Holley@bakerhughes. com Bruce Mac.

CURRENT MEMBER LIST Andrew Holley Bruce Mackay Cory Heinricks Andrew. Holley@bakerhughes. com Bruce Mac. Kay <BMackay@slb. com> cheinricks@trican. ca Cristiane de Miranda crisrichard@petrobras. com. br Deryck Williams Frank Bi Gunnar De Bruijn Jamie Hayes Jeff Moon Jim Davison drrw@Chevron. com frankbi@graceinstrument. com gunnar 1@houston. oilfield. slb. com jhayes@ofite. com Jeff. moon@ametek. com Jim. Davison@ametek. com John Singh John. Singh@halliburton. com Li Li Mark Meade Paul Sonnier Rick Lukay, Chair Robert Darbe Roberto Masoni Simon James Steve Cicchese Toby Mclain Li. Li 2@bakerhughes. com Mark Meade <mmeade@slb. com> psonnier@csi-tech. net rlukay@ofite. com Robert. Darbe@Halliburton. com roberto. masoni@ENI. com Walmy Cuello Jimenez Walmy. Cuello. Jimenez@halliburton. com s_cicchese@brookfieldengineering. com tmcclain@fann. com

2017 SUMMER MEETING MINUTES

2017 SUMMER MEETING MINUTES

OLD BUSINESS

OLD BUSINESS

ACTION ITEMS FROM JUN. 2017 1. Believe we have shown the existing RP to

ACTION ITEMS FROM JUN. 2017 1. Believe we have shown the existing RP to not be very realistic and that we can get realistic results from Existing HTHP Rheometers. 2. Develop a preliminary new RP and add it to the existing RP 10 B-2 as an appendix. 3. Have the industry out and give feed back on the RP. 4. Where possible, have the data from the new RP be run through simulators, to be compared with field results.

CURRENT STATUS 1. A PRELIMINARY RP FOR USING HTHP RHEOMETERS IS PREPARED. NEEDS FINAL

CURRENT STATUS 1. A PRELIMINARY RP FOR USING HTHP RHEOMETERS IS PREPARED. NEEDS FINAL DRAFT AND APROVAL 2. WORK ON THE TR IS ON GOING, AND I SEE I WILL NEED HELP!!!!

PROPOSED PROCEEDURE

PROPOSED PROCEEDURE

DISCUSSION

DISCUSSION

TECHNICAL REPORT

TECHNICAL REPORT

DISCUSSION

DISCUSSION

NEW BUSINESS

NEW BUSINESS

MOVE TO ADJOURN?

MOVE TO ADJOURN?