West Memphis Terminal Procedures RD408 WM Barge Loading
West Memphis Terminal Procedures RD-408 -WM Barge Loading 01/30/2009 Opening Gauge Verify Tank Alignment See Page 2 Note Start Loading Note Stop Loading Caution Closing Gauge 6/16/2021 1
West Memphis Terminal Procedures RD-408 -WM Barge Loading 01/30/2009 Barge Loading – Standard Setup up on Line 4 ØDetail ØThe following valves must be open: ØTank 807 Valve on Manifold ØPump 4 Suction Valve ØPump 4 Discharge MOV Valve Ø Line 4 Outboard Isolation Valve ØDock Side Hump Valve on Line 4 ØDock Dolphin Valve on Line 4 ØThe following valves must be closed: ØPump 4 Crossover Bypass Valve ØPump 4 Crossover Gate Valve ØTerminal Side Hump Valve on Line 4 ØAll non-applicable Dock Side Hump Valves Barge Loading when Loading with a specific line Pump to a different Line. ØDetail ØThe following valves must be open: ØTank 807 Valve on Manifold ØPump 4 Suction Valve ØPump 4 Discharge MOV Valve ØPump 4 Crossover Bypass Valve ØPump 3 Crossover Bypass Valve ØTerminal Side Hump Valve on Line 4 ØDock Side Hump Valve on Line 3 ØThe following valves must be closed: ØAll non-applicable tank valves on manifold Ø Line 4 Outboard Isolation Valve ØPump 4 Crossover Gate Valve ØPump 3 Crossover Gate Valve ØDock Side Hump Valve on Line 4 ØTerminal Side Hump Valve on Line 4 6/16/2021 2
- Slides: 2