WELCOME Company Profile GROUP V 3 S INFRATECH

  • Slides: 37
Download presentation
WELCOME

WELCOME

Company Profile GROUP V 3 S INFRATECH LIMITED

Company Profile GROUP V 3 S INFRATECH LIMITED

V 3 S Infratech Ltd A Complete Solution to Accelerate Performance We are one

V 3 S Infratech Ltd A Complete Solution to Accelerate Performance We are one of the most reputed & well established infrastructure developers & contractors with its brand name “ ” � Provide the entire range of services involved in conceptualization, design, construction & commissioning of any nature of Infrastructure development work � Client � All conscious approach solutions under single roof

Areas of Activity • Malls • Commercial complexes • Hospitals • Hotels • Residential

Areas of Activity • Malls • Commercial complexes • Hospitals • Hotels • Residential complexes • IT parks • Mall management

COMPANY TURNOVER • Turnover for the year (2008 -09) has been Rs 1350 millions

COMPANY TURNOVER • Turnover for the year (2008 -09) has been Rs 1350 millions • Turnover for the year (2009 -2010) is Rs 2000 millions • Projected turnover for the year (20102011) is Rs 2500 millions

 • Our Motto – Quality, Timely completion and Client Satisfaction • Specialize in

• Our Motto – Quality, Timely completion and Client Satisfaction • Specialize in Buildings with Intricate Architectural Design and High Quality Finish • Dedicated & experienced Team of Staff in various disciplines of construction • Providing Turnkey Solutions Through Single Window

In House Services • • Civil : Design & Execution Electrical : Design &

In House Services • • Civil : Design & Execution Electrical : Design & Execution Plumbing & Fire Fighting : Design & Execution HVAC : Design & Execution

Presence in India Faridabad Ambala Kolkata

Presence in India Faridabad Ambala Kolkata

Projects Executed

Projects Executed

V 3 S Mall at Plot No 10 – Laxmi Nagar Project • Covered

V 3 S Mall at Plot No 10 – Laxmi Nagar Project • Covered Area : 1, 50, 000 sq ft Highlights • No. of Floors : 2 basements +Ground+ 3 floors Projected Completion : Aug‘ 06 Duration : 12 months

V 3 S East Centre Mall At Plot No-12, Laxmi Nagar Project Highlights •

V 3 S East Centre Mall At Plot No-12, Laxmi Nagar Project Highlights • Covered Area : 5, 20, 000 sq ft : 2 • No. of Floors basements +Ground+ 3 floors Completed in : Aug’ 07 Duration : 12 months

CRPF CAMP, NOIDA-U. P Project Highlights • Covered Area : 2, 58, 000 sq

CRPF CAMP, NOIDA-U. P Project Highlights • Covered Area : 2, 58, 000 sq ft • Completed in : Jan’ 10 • Duration : 12 Months

ESIC HOSPITAL, GURGAON Project Highlights • Covered Area : 1, 65, 000 sq ft

ESIC HOSPITAL, GURGAON Project Highlights • Covered Area : 1, 65, 000 sq ft • No. of Bed : 200 Bed • Fully Air -Conditioned • Projected Completion : Jul ‘ 2010 • Duration : 24 months

Projects under Execution

Projects under Execution

Residential Complex At Indrapuram, Ghaziabad Project • Highlights Covered Area : 1, 50, 000

Residential Complex At Indrapuram, Ghaziabad Project • Highlights Covered Area : 1, 50, 000 sq ft • No. of Flats : 150 flats Artist’s impressio n

Info. Tech Park at MIDC Adheri Project Highlights • Covered Area : 1, 000

Info. Tech Park at MIDC Adheri Project Highlights • Covered Area : 1, 000 sq ft • No. of Floors : 1 basement +Ground+ 6 floors Artist’s impression

Sl. No. Other Government Jobs under Execution Project details Location Duration 1 Housing complex

Sl. No. Other Government Jobs under Execution Project details Location Duration 1 Housing complex for D. D. A – composite job Delhi 24 months 2 HUDA EWS, Gurgaon 18 months 3 HUDA EWS, Faridabad 18 months

4 NHPC, FARIDABAD Faridabad 24 months 5 HUDA EWS, Ambala 18 months 6 IFCI

4 NHPC, FARIDABAD Faridabad 24 months 5 HUDA EWS, Ambala 18 months 6 IFCI Hotel, Delhi 12 months 7 ESIC, Kolkata 18 months 8 NDMC New Delhi 12 months

OUR STRENGTH • Resources - Manpower - Plant & Machinery Speedy Construction Quality •

OUR STRENGTH • Resources - Manpower - Plant & Machinery Speedy Construction Quality • •

Manpower • Strongly backed by Technical Staff with extensive experience in the Construction Industry

Manpower • Strongly backed by Technical Staff with extensive experience in the Construction Industry • 150 qualified and dedicated Engineers • Total Staff of 450 People on Regular Payroll • 3500 regular Work Force

Plant & Machinery • Batching Plant (≥ 30 Cum/hr)- 8 nos • Concrete pump

Plant & Machinery • Batching Plant (≥ 30 Cum/hr)- 8 nos • Concrete pump (≥ 30 cum/hr)- 8 nos • Tower Cranes- 5 nos • Excavator. Mini Excavator- 4 nos • Pick & Carry Hydra - 4 nos • Formwork Material - 1000 MT • Diesel generator- 62. 5 KVA-12 nos, 125 KVA 10 nos, 250 KVA-1 no

FINANCIAL PARAMETERS

FINANCIAL PARAMETERS

PROJECTED TURNOVER 300 250 200 150 100 50 0 200 108 120 135 2006

PROJECTED TURNOVER 300 250 200 150 100 50 0 200 108 120 135 2006 -07 2007 -08 2008 -09 250 32 2005 -06 2009 -10 2010 -11

SAFETY

SAFETY

Safety is a critical component of Quality. We believe safety is essential to the

Safety is a critical component of Quality. We believe safety is essential to the completion of a quality project Safety is our top priority. We have no tolerance for any practice that does not promote safety at work. We have worked hard at developing a safety culture.

Our goal is tough: we want to eliminate all accidents from project site workplaces.

Our goal is tough: we want to eliminate all accidents from project site workplaces. Our positive approach to safety has enabled us to grow. Our commitment to safety is an important part of our vision.

SAFETY MANAGEMENT We consider safety as no accident. We constantly work at it with

SAFETY MANAGEMENT We consider safety as no accident. We constantly work at it with hands-on training. Proactive safety management keeps our job site injury-free. Safety Record Thanks to the efforts of our safety conscious employees, we hold the best safety records.

Management Commitment to Safety We are committed to maintaining a safe and healthful working

Management Commitment to Safety We are committed to maintaining a safe and healthful working environment. We pledge our best efforts to work together safely to achieve this goal. We regularly communicate our goal to all employees.

Our Program Our Safety Program includes: Employee Orientation Project Safety Plan Emergency and Communication

Our Program Our Safety Program includes: Employee Orientation Project Safety Plan Emergency and Communication Plan Safety Inspections Safety Committee Meetings

Safety Philosophy All injuries can be prevented. Management and every individual is responsible for

Safety Philosophy All injuries can be prevented. Management and every individual is responsible for preventing injuries. Working safely is a condition of employment. All operating exposures can be safeguarded. Training employees to work safely is essential. Prevention of personal injuries is good business. Safety Department We have qualified, experienced, committed and result focused safety engineers.

QUALITY ASSURANCE

QUALITY ASSURANCE

l Quality assurance system may be visualized as a series of inter-related controls which

l Quality assurance system may be visualized as a series of inter-related controls which are exercised to achieve the desired Quality Objectives. They are: - l 1. PROCESS CONTROL- Drawing & Technical Specification, Construction Methodology, Quality Assurance Plan, Resource based planning etc. l 2. PROCUREMENT CONTROL- Vendor evaluation & Registration, Specification for Work order, Qualification of Procured items. l 3. MATERIALS CONTROL- Material receipt, QA/QC verification, Storage, Non conforming material segregation storage, Issue of materials, Stores Register. l 4. INSPECTION & TEST CONTROL- Quality Assurance Plan, Calibration of measuring Equipments, Inspection Records, Statistical Analysis. l 5. NON-CONFORMANCE CONTROL- Preventive & Corrective Action. l 6. DESIGN CONTROL- Basic Design, Process Design l 7. DOCUMENT CONTROL- Controlled copy, Distribution, Old copy Disposition.

QUALITY • Having ISO 9001: 2008, ISO 14001: 2004 & OHSAS 18001: 2007 (EMS)

QUALITY • Having ISO 9001: 2008, ISO 14001: 2004 & OHSAS 18001: 2007 (EMS) certification together • As a part of Quality Management System, strict Quality Control at all our Projects for incoming materials as well as processes • Control of Monitoring and Measuring Devices and their timely calibration

Thank you !!!

Thank you !!!