Solar - Grid Integration & Way forward 2 Prashant 2/20/2021

Solar - Grid Integration & Way forward 2 Prashant 2/20/2021

VISION - INDIA 3 Power to All - India’s need to increase energy provision

VISION - INDIA 3 Power to All - India’s need to increase energy provision for its population and fast growing economy poses a formidable challenge which is perceived as both a great opportunity as well as a necessity for the country to increase the share of RENEWABLEs in the overall energy mix. Prashant 2/20/2021

Power Sector Reforms 4 § Electricity Act 2003 : § De-licensing of Generation §

Power Sector Reforms 4 § Electricity Act 2003 : § De-licensing of Generation § Competitive Bidding § Unbundling of SEBs § APDRP program § § § Power Trading Open Access Private Sector Participation : These developments have given rise to new opportunities for the private sector especially in Power Generation space Prashant 2/20/2021

RE - PROMOTION 5 � Electricity Act 2003 : Section 86(i)e: The State Commission

RE - PROMOTION 5 � Electricity Act 2003 : Section 86(i)e: The State Commission shall discharge the following functions, namely: ◦ promote cogeneration and generation of electricity from renewable sources of energy by providing suitable measures for connectivity with the grid and sale of electricity to any person, and also specify, for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licensee; Prashant 2/20/2021

Policy Targets for RE 6 Govt. of India has ambitious plans to increase percentage

Policy Targets for RE 6 Govt. of India has ambitious plans to increase percentage of RE in the energy mix of India’s target is to achieve 175 GW generation capacity by 2022. JNNSM targets have been revised from 20 GW to 100 GW by 2021 -22. This capacity is to be achieved through installation of 40 GW of Roof Top Solar projects and 60 GW of large ground mounted projects. India also plans to install 60 GW Wind Energy, 10 GW of Biomass power and 5 GW of Small Hydro power Maharashtra has been given target of 22, 045 MW of RE out of which solar target is 11, 926 MW.

I S S U E S My Money? ? GRID issues ? ? My

I S S U E S My Money? ? GRID issues ? ? My Status ? ? GENERATOR B K AN DISTRIBUTION COMPANY

Variability in Solar Generation 8 PRASHANT 2/20/2021

Variability in Solar Generation 8 PRASHANT 2/20/2021

9 Challenges in Accommodating RE Energy generation from renewables depend on the availability of

9 Challenges in Accommodating RE Energy generation from renewables depend on the availability of natural resource and the generation can not be predicted with high degree of accuracy. Renewable energy generators are relatively small and scattered across a large geographic area. Grids need to evolve to accommodate increasingly complex mix of small, distributed generators and consumers at all points in the electricity grid. In-firm in nature , SUN – not shining everyday

Challenges in Accommodating RE 10 Key drivers for Solar in future are: Economics and

Challenges in Accommodating RE 10 Key drivers for Solar in future are: Economics and short gestation, energy security, lower development stage risks, day time supply of power. In electricity grid, supply and demand must be matched instantaneously. Any mismatch can lead to collapse of the grid. Present grids are relatively simple system having unidirectional flow from large-scale conventional generators through transmission and distribution lines to consumers. Existing power system heavily relies on conventional power plants that have a controllable power output. Renewable Energy sources especially Wind and solar power are not controllable and thus present challenges to the operation of the power grid.

Generator's Dilemma 11 PPA/ FORECASTING ? ? Changes in Policies Budgeting Project cost Return

Generator's Dilemma 11 PPA/ FORECASTING ? ? Changes in Policies Budgeting Project cost Return on Investment ? Prashant 2/20/2021

GENERATOR’s CHOICE 12 DISCOM – FIT CAPTIVE Prashant 2/20/2021

GENERATOR’s CHOICE 12 DISCOM – FIT CAPTIVE Prashant 2/20/2021

Emerging Trends - Open Access Conventional Power supply mode Options under Open Access Through

Emerging Trends - Open Access Conventional Power supply mode Options under Open Access Through Bilateral Scheduling for pre contracted quantum & period Through DISCOM/ Grid supply with fixed Contract Demand Shortfall in supply is met by running high cost power from Diesel Gen’sets during scheduled/ sudden power cuts Complete transaction routed through same infrastructure under “Open Access” Scheduling Through Power Exchanges Through Wheeling & Banking settlements 13

Renewable Energy Management Centers 14 Setting up separate REMC to work in tandem with

Renewable Energy Management Centers 14 Setting up separate REMC to work in tandem with SLDC / RLDC / NLDC REMCs will work for maximization of RE generation and integration with grid without compromising on its security and stability REMC shall coordinate with SLDC/RLDC for discharging various functionalities related to management of renewable energy generation PRASHANT 2/20/2021

Green Energy Transmission Corridor 15 Minimizing transmission bottlenecks and evacuating entire energy generated by

Green Energy Transmission Corridor 15 Minimizing transmission bottlenecks and evacuating entire energy generated by RE generation stations In a large interconnected system variation in frequency would be lesser for a given variation in generation/demand Optimum utilization of spinning reserve and quick-start hydro/gas generation capacity in different parts of the grid for power balancing Development of Hybrid EHV AC/ HVDC Transmission system for flexibility of controls Interconnection of RE rich regions as well as with major load centers as touch points Transmission corridors passing through conventional generation complexes like Andhra, Orrisa, Jharkhand etc. PRASHANT 2/20/2021

Green Energy Transmission Corridor 16 PRASHANT 2/20/2021

Green Energy Transmission Corridor 16 PRASHANT 2/20/2021

Effective Grid Management Techniques 17 Generation forecasts of RE power can systematically under predict

Effective Grid Management Techniques 17 Generation forecasts of RE power can systematically under predict generation during periods of lean season, and over predict during peak generation season so as to reduce error. Use of appropriate correction factors on forecasted data for optimizing scheduling. Establish grid codes for incentivize generators having energy storage facility. Building and optimizing utilization of balancing reserves for taking care of varying generation. Demand side flexibility can be used as spinning reserves as well as peak reduction. Generators like Gas Turbine generators having fast ramp-up rates can add to the flexibility of grid. Strengthening/expansion of grid interconnection to enlarge the power balancing area

Net Metering & Gross Metering 18 PRASHANT 2/20/2021

Net Metering & Gross Metering 18 PRASHANT 2/20/2021

Net Metering & Gross Metering 19 Net Metering Solar energy is used first onsite

Net Metering & Gross Metering 19 Net Metering Solar energy is used first onsite when it is produced. Any excess energy is exported to the grid Any energy used outside of solar producing hours, or on top of solar production, is imported from the grid. Excess generation is carried forward for future consumption OR excess consumption is billed at standard tariff Gross Metering Entire energy generated by solar is fed into grid and is recorded by solar meter. Entire energy requirement of the consumer is met through energy from the grid. Discom pays preferential tariff for solar energy exported to grid and bills consumer for his consumer at standard tariff PRASHANT 2/20/2021

Importance of Energy Storage 20 Optimizing the supply and demand imbalance Supporting the growth

Importance of Energy Storage 20 Optimizing the supply and demand imbalance Supporting the growth of intermittent renewable energy sources Providing ancillary service markets Avoiding cost of strengthening Transmission and Distribution network

GRID Integration Battery DC Bus Inverter GRID

GRID Integration Battery DC Bus Inverter GRID

GRID Integration Battery AC Bus GRID

GRID Integration Battery AC Bus GRID

POWER SALE STRATEGY 23 DISCOM FIT/APPC+ REC Store & Dispatch Prashant CAPTIVE/ GC+REC OPEN

POWER SALE STRATEGY 23 DISCOM FIT/APPC+ REC Store & Dispatch Prashant CAPTIVE/ GC+REC OPEN ACCESS +REC 2/20/2021

Promotion of Solar by MERC 24 Solar RPO increased to 1% in 2016 -17

Promotion of Solar by MERC 24 Solar RPO increased to 1% in 2016 -17 and 2% in 2017 -18. Permitted Open Access for Solar and concession in CSS for solar Implemented Net Metering for Rooftop solar projects Announced preferential tariff of Rs. 6. 04/k. Wh for ground mounted and Rs. 6. 54/k. Wh for Rooftop solar PV projects PRASHANT 2/20/2021

Introduction to GEPL 25 Knowledge based company operating across the entire supply chain of

Introduction to GEPL 25 Knowledge based company operating across the entire supply chain of electricity comprising of generation, trading, banking brokering and swapping of electricity & derivatives trading. GEPL has been in the forefront of market development, regulation and policy, since enactment of the Electricity Act 2003. GEPL provides value to its clients through its deep understanding of the market dynamics created by evolving regulations and policy. GEPL always intends to create market for facilitating best services in uncharted domain within Power Sector. Having in-depth knowledge of India’s power sector, GEPL is aligned with the latest reforms, regulations and various nuances of open access and power trading pursuant to the Electricity Act of 2003.

Trading 26 Power Trading

Trading 26 Power Trading

Trading 27 § India’s first Independent Power Trader § Category “I” Inter-State trading License

Trading 27 § India’s first Independent Power Trader § Category “I” Inter-State trading License from CERC § Holds various Intra-State Licenses for Power Trading across the country. § GEPL is associated with both, the Indian Energy Exchange (IEX) and the Power Exchange of India Ltd. (PXIL). § Traded more than 15. 5 Billion Units of power so far § GEPL is the first trader to schedule power from an embedded private power producer to customers in other regions. § One of the first traders to trade in Renewable Energy. § Has a presence in all electricity regions of the country

Generation 28 Power Generation

Generation 28 Power Generation

Power Generation 29 § First Rural DDG based power plant of India in Distt.

Power Generation 29 § First Rural DDG based power plant of India in Distt. Belgundi, Belgaum (Karnataka) since 1994 § 25 MW proposed and 5 MW installed, biomass based power plant modified for multi fuel intake up to 30 varieties of bio-fuel § Power Sale arrangement with Local Gram Panchayat with surplus sale option to third party or local utilities

Power Advisory & Services 30

Power Advisory & Services 30

Power Advisory & Services 31 India’s 1 st company to have more than 2

Power Advisory & Services 31 India’s 1 st company to have more than 2 BU of tradable Renewable Energy Certificates contracts till date. Consulting & advisory services from concept to commissioning for Power Projects Energy Efficiency consulting / REC / GBI / EEC Regulatory & Policy advisory IT enabled transaction advisory services Structuring of Green Field & Brown field renewable energy power projects Electricity Portfolio management services

Esteemed Clientele Govt. of Arunachal Pradesh Govt. of Goa MP POWER TRADING COMPANY LIMITED

Esteemed Clientele Govt. of Arunachal Pradesh Govt. of Goa MP POWER TRADING COMPANY LIMITED BEST, Mumbai NOIDA Power company Limited Govt. of Tripura Govt. of Nagaland APTRANSCO Ltd.

Esteemed Clientele 33 § ESTEEMED CLIENTELE • Maharashtra State Electricity Distribution co Ltd •

Esteemed Clientele 33 § ESTEEMED CLIENTELE • Maharashtra State Electricity Distribution co Ltd • Monnet Ispat & Energy Ltd • Noida Power Co Ltd • Tamil Nadu Electricity Board • Uttar Pradesh Power Corporation Ltd • & many more

Our Presence 34 UT Regional Office: #28, Sector 2 A, Chandigarh UT Corporate Office:

Our Presence 34 UT Regional Office: #28, Sector 2 A, Chandigarh UT Corporate Office: 1 st Floor, Shangri-la Commercial complex , N. Delhi Regional Office: Vivek Buildings, Vivek Vihar, Itanagar, Arunachal Pradesh Regional Office: 104, Maker chamber VI, 10 th Floor, Nariman Point Mumbai & B 104, ICC Trade Tower , SB Road, Pune Regional Office: S/2/23, Niladri Vihar, Chandrasekharpur, Bhubneshwar IPP: Thermal Power Plant Village Belgundi, Belgaum, Karnataka Regd. Office: Flat no GR 4, Bldg 4, Aldela De Goa, Nauxim Bambolim, Goa 6 Regional Office: Room. No. 117, Hotel Babylon Inn, Jail Road, Raipur Regional Office: A 503, Cormangala, Bangalore

Contact Us 36 THANKS Prashant Khankhoje Executive Director (Business Development) Email : prashantk@globalenergy. net.

Contact Us 36 THANKS Prashant Khankhoje Executive Director (Business Development) Email : prashantk@globalenergy. net. in www. globalenergylimited. co. in