Weekly Summary Tevatron Department Meeting Tevatron Coordinator Dean
- Slides: 17
Weekly Summary Tevatron Department Meeting Tevatron Coordinator Dean Still Friday, February 26, 2010
Store Summary Store Avg Init. Lumi (E 30) Avg Deliv’d Lumi (nb-1) Time (hr) How did it end? 7619 300 6957 13. 7 Intentional 7620 312 7709 15. 5 Intentional 7621 315 6939 12. 7 Intentional 7625 310 3361 4. 4 Abort Power glitch; 7628 175 4625 18. 2 Intentional After glitch shot from small stash. 7629 247 6333 16. 1 Intentional 7630 307 8330 19. 3 Intentional 7631 289 8406 20. 4 Intentional Reduced B 0 loss ; Pbar long blow up coll; pbar ver blow up SQ 7632 288 6784 13. 7 Intentional Reduced B 0 loss ; Pbar long blow up coll; pbar ver blow up SQ 7634 315 Tevatron Coordinator - FNAL Comments On going 1/4/2022
Important Parameter HEP Taking lower pbars due to losses In Squeeze ~ 400 E 9. Possible To remove limit.
Problems • Losses at LMB 1 SD (~29 rads/sec – quench ~50 rads/sec) remain high during squeeze LBSEQ 7 -14. • Pbar vertical emittance blow up at and pbar beam loss at during squeeze, maybe due to orbit changes. • Pbar vertical emittance blow up at and pbar beam loss at Initiate Collisions. • Pbar long. Growth in squeeze and collisions. Tevatron Coordinator - FNAL 1/4/2022 4
Pbar Performance Vert Emittance Intensity Long
Initial Luminosity Plot
Integrated Friday to Friday
Studies/Work Completed • Tested HFU to verify heater at A 34 connected. • Lowered Pbar tunes at lbseq 25 (due to Scalloping) • Lowered B 0 VPOS ~ 1 mm to. 5 mm to reduce losses at B 0 lbseq 8 -24 • Replaced LVDT signal conditioner F 12 UH collimator. Tevatron Coordinator - FNAL 1/4/2022 8
Losses at B 0 (LMB 1 SD) in squeeze Stores last April Hi Losses Current stores
Changes to orbit to reduce Squeeze losses at B 0 Store 7613 orbits Before moving B 0 VPOS down Store 7632 orbits After moving B 0 VPOS Down ~. 5 mm
B 0 Positions – Tracking through changes
Cross Plane Problems
Off Plane Tune effect
Effects on Losses at D 0 Stores last April Hi Loss Current stores
Compare Proton beam loss in the Squeeze Last April current
Putting pbar sync light in fast Blown
Studies • • • TEL-2 abort gap cleaning test (EOS 1 hour) T-980 end of store (2 -4 hours) 150 gev Chrom Study (2 hours- dedicated at 150 gev, Tan) TEL – (EOS, Valishev) Pbar only store once luminosity is better to document conditions. Tevatron Coordinator - FNAL 1/4/2022 17
- Dean d dean
- Kanban replenishment meeting
- Spp tcr calendar
- Bellettini
- Tevatron cdf
- Tevatron
- „superjets“ am tevatron
- Bad boy walter dean myers summary
- Irwin lasher
- Irwin lasher
- William dean howells editha summary
- For todays meeting
- Today meeting or today's meeting
- What is meeting and types of meeting
- What is meeting and types of meeting
- Math department meeting agenda
- Minutes of meeting finance department
- Duties and responsibilities of boy scout coordinator