Store Summary Store Avg Init. Lumi (E 30) Avg Deliv’d Lumi (nb-1) Time (hr)

Store Summary Store Avg Init. Lumi (E 30) Avg Deliv’d Lumi (nb-1) Time (hr) How did it end? 7779 373 9003 17. 8 Intentional 7780 383 8552 16. 9 Intentional 7781 0 0 0 Quench in Squeeze 7784 355 7369 13. 5 Intentional 7789 270 5620 12. 9 Abort 7792 358 7327 13. 5 Intentional 7793 397 9087 18. 7 Intentional 7794 364 8817 21. 7 Intentional T-980 EOS study 7795 396. 5 2181 2. 1 Quench AAK 1 abort kicker pre-fire during store Tevatron Coordinator - FNAL Comments Quench at seq 24 not fully explained Poor MI coalescing; Door Interlock failure at D 2; Quench during PO 1/1/2022

Store Numbers Tevatron Coordinator - FNAL 1/1/2022 3

Store Numbers Tevatron Coordinator - FNAL 1/1/2022 3

HEP Particle Intensities

HEP Particle Intensities

HEP Effective Emittance

HEP Effective Emittance

HEP Bunch Length

HEP Bunch Length

Problems • Still have both Pbar and Proton Longitudinal blow ups • Quench caused

Problems • Still have both Pbar and Proton Longitudinal blow ups • Quench caused by human error in dry squeeze (lead flows turned off) • Door interlock failure at D 2 – Causing quench at lowbeta’s due to ramp down. • Tevatron DCCT hardware failure – Fix successful. • AAK 1 Abort Kicker Prefire – Quench A 1, A 2, A 4, B 1 BA, BB, BC, BD, DA, DB Tevatron Coordinator - FNAL 1/1/2022 7

Studies/Work Completed • D 0 aperture scans at 150 Ge. V • Repair of

Studies/Work Completed • D 0 aperture scans at 150 Ge. V • Repair of vacuum pump on TEL 2 • T-980 3 hours EOS – Attempted 2 plane crystal collimation Tevatron Coordinator - FNAL 1/1/2022 8

Luminosity Integral Tevatron Coordinator - FNAL 1/1/2022 9

Luminosity Integral Tevatron Coordinator - FNAL 1/1/2022 9

Study requests • • TEL-2 abort gap cleaning test (EOS 1 hour) 150 gev

Study requests • • TEL-2 abort gap cleaning test (EOS 1 hour) 150 gev Chrom Study (2 hours- dedicated at 150 gev, Tan) Aperture scans at B 0 and D 0 Ping beam at low field to measure coupling with protons on the pbar helix • Tune mults calibration. • Pbar only store once luminosity is better to document conditions. • Lattice measurements at Flattop and Sequence 14 and on pbar helix at Collisions Tevatron Coordinator - FNAL 1/1/2022 10