Weekly Summary Tevatron Department Meeting Tevatron Coordinator D. Still April 22, 2011– April 29,

Weekly Summary Tevatron Department Meeting Tevatron Coordinator D. Still April 22, 2011– April 29, 2011 Tevatron Coordinator - FNAL 9/5/2021 1

Store Summary Store Avg Init. Lumi (E 30) Avg Deliv’d Lumi (nb-1) Time (hr)

Store Summary Store Avg Init. Lumi (E 30) Avg Deliv’d Lumi (nb-1) Time (hr) How did it end? Comments 8684 358. 5 3242 3. 7 Normal Terminated Early to work on B 1 & E 1 wet engines 8688 287 5529 10. 7 Normal 8692 299. 5 8454 24 Normal EOS: tune mult cal & Lum Leveling due to Linac vac problems 8695 292. 5 8586 24. 4 Normal Moved D 0 IP position – EOS – T 980 8696 237. 2 5713 15. 6 Normal Shot from low pbar stash 8697 342 9259 20. 2 Normal TRF 7 has water leak 8698 388 7555 16. 6 Normal TRF 4 tripped during store 8700 405 - - On Going Tevatron Initial Lum Record Average 326 Tevatron Coordinator - FNAL 12/24/10 3

Problems • Quenched with no beam after 8692 terminated when Prepare for experimenter access

Problems • Quenched with no beam after 8692 terminated when Prepare for experimenter access was run. • TRF 7 developed water leak • TRF 4 tripped off during store 8698 Downtime: 9. 7 hours

Studies/Work Completed • Repaired E 1 and B 1 wet engine. • Tune Mult

Studies/Work Completed • Repaired E 1 and B 1 wet engine. • Tune Mult calibrations (EOS 1 hour). • Luminosity Leveling (EOS 1 hour). • T 980: First use of pixel to image channeled beam. • Moved D 0 IP vert down by 100 um and inside -200 um. • Tuned up Tune tracker

Initial Luminosity Tevatron Coordinator - FNAL 9/5/2021 5

Initial Luminosity Tevatron Coordinator - FNAL 9/5/2021 5

Store Numbers Tevatron Coordinator - FNAL 9/5/2021 6

Store Numbers Tevatron Coordinator - FNAL 9/5/2021 6

Orbit RMS for 70 weeks After fixing D 0 bump. Lesson Learned: Orbit, orbit

Orbit RMS for 70 weeks After fixing D 0 bump. Lesson Learned: Orbit, orbit

Small Problem with 8700 record

Small Problem with 8700 record

Compare Top 2 stores Squeeze losses 8700 & 7747 (4/16/2010)

Compare Top 2 stores Squeeze losses 8700 & 7747 (4/16/2010)

Compare Top 2 stores Squeeze losses 8700 & 7747 (4/16/2010)

Compare Top 2 stores Squeeze losses 8700 & 7747 (4/16/2010)

Friday to Friday Integrated 11

Friday to Friday Integrated 11

For the Year

For the Year

Studies Request • • EOS: T 980 3 hours (Still) EOS: Hollow beam studies

Studies Request • • EOS: T 980 3 hours (Still) EOS: Hollow beam studies (Valishev) Dedicated: Pbar longitudinal damping studies (Tan) EOS/MOS: Separator scan Dedicated: Check DC beam at injection with bumper magnet (Hanna) Dedicated: Ecloud study (P only 1 hr) EOS/MOS: Luminosity Leveling (Moore) END OF RUN STUDIES: • Studies will begin to take place May 15 to May 27 Tevatron Coordinator - FNAL 9/5/2021 13